Operating platform and chimney cylinder wall rollover construction method
The invention relates to the technical field of chimney cylinder wall construction, in particular to an operation platform and a chimney cylinder wall rollover construction method. One end of each radiation beam is connected with the central drum ring, the multiple radiation beams are evenly distributed in the circumferential direction of the central drum ring, and one end of each radiation beam is connected to the supporting steel pipe; the platform steel rings are connected with the radiation beams, and the platform steel rings and the central drum ring are concentrically arranged; stay cables are connected between the radiation beams and the central drum ring, one ends of the stay cables are connected with the radiation beams, and the other ends of the stay cables are connected with the central drum ring; the platform plates are sequentially laid on a steel structure formed by the radiation beams and the platform steel rings; wherein D1 is equal to D2/X; d2 is the maximum diameter of the chimney cylinder wall; d2 is greater than or equal to 20 m and less than or equal to 32.5 m; 2.375 < = X < = 2.714; on the premise that the beam length of the radiation beam is shortened, the overall dead weight of the operation platform is reduced, and the use safety performance of the operation platform is guaranteed.
本申请涉及烟囱筒壁施工技术领域,尤其涉及一种操作平台及烟囱筒壁翻模施工方法,包括直径为D1的中心鼓圈;多根辐射梁,辐射梁的一端与中心鼓圈连接,多根辐射梁沿中心鼓圈的周向圆周均匀分布,辐射梁一端连接于支撑钢管上;多道平台钢圈,平台钢圈与辐射梁连接,平台钢圈与中心鼓圈同中心设置;辐射梁和中心鼓圈之间连接有斜拉索,斜拉索一端与辐射梁连接,另一端与中心鼓圈连接;多块平台板,多块平台板依次铺设于辐射梁和平台钢圈形成的钢构上;其中,D1=D2/X;D2为烟囱筒壁最大直径;20米≤D2≤32.5米;2.375≤X≤2.714;本申请具有在缩短辐射梁的梁长的前提下降低操作平台的总体自重并保障操作平台使用安全性能的效果。
Operating platform and chimney cylinder wall rollover construction method
The invention relates to the technical field of chimney cylinder wall construction, in particular to an operation platform and a chimney cylinder wall rollover construction method. One end of each radiation beam is connected with the central drum ring, the multiple radiation beams are evenly distributed in the circumferential direction of the central drum ring, and one end of each radiation beam is connected to the supporting steel pipe; the platform steel rings are connected with the radiation beams, and the platform steel rings and the central drum ring are concentrically arranged; stay cables are connected between the radiation beams and the central drum ring, one ends of the stay cables are connected with the radiation beams, and the other ends of the stay cables are connected with the central drum ring; the platform plates are sequentially laid on a steel structure formed by the radiation beams and the platform steel rings; wherein D1 is equal to D2/X; d2 is the maximum diameter of the chimney cylinder wall; d2 is greater than or equal to 20 m and less than or equal to 32.5 m; 2.375 < = X < = 2.714; on the premise that the beam length of the radiation beam is shortened, the overall dead weight of the operation platform is reduced, and the use safety performance of the operation platform is guaranteed.
本申请涉及烟囱筒壁施工技术领域,尤其涉及一种操作平台及烟囱筒壁翻模施工方法,包括直径为D1的中心鼓圈;多根辐射梁,辐射梁的一端与中心鼓圈连接,多根辐射梁沿中心鼓圈的周向圆周均匀分布,辐射梁一端连接于支撑钢管上;多道平台钢圈,平台钢圈与辐射梁连接,平台钢圈与中心鼓圈同中心设置;辐射梁和中心鼓圈之间连接有斜拉索,斜拉索一端与辐射梁连接,另一端与中心鼓圈连接;多块平台板,多块平台板依次铺设于辐射梁和平台钢圈形成的钢构上;其中,D1=D2/X;D2为烟囱筒壁最大直径;20米≤D2≤32.5米;2.375≤X≤2.714;本申请具有在缩短辐射梁的梁长的前提下降低操作平台的总体自重并保障操作平台使用安全性能的效果。
Operating platform and chimney cylinder wall rollover construction method
一种操作平台及烟囱筒壁翻模施工方法
WANG LIANG (Autor:in) / YANG HUIBIN (Autor:in) / ZHAO FENGHUA (Autor:in) / ZHANG JIAN (Autor:in) / ZHU CHONGYANG (Autor:in) / ZHANG XING (Autor:in) / HU WENBING (Autor:in) / LIU ANJUN (Autor:in) / DANG XINYU (Autor:in)
07.11.2023
Patent
Elektronische Ressource
Chinesisch
Chimney rollover construction operation platform and device
Europäisches Patentamt | 2023
|Chimney cylinder rollover construction equipment with ear chambers and sightseeing function
Europäisches Patentamt | 2023
|Chimney lining masonry construction operating platform and construction method thereof
Europäisches Patentamt | 2020
|Chimney rollover construction method with structural refractory bricks serving as inner mold
Europäisches Patentamt | 2023
|