Vertical construction method for offshore wind power four-pile jacket
The invention provides a vertical construction method for an offshore wind power four-pile jacket, and belongs to the technical field of jacket installation. The problems that jacket construction procedures are many, construction difficulty is large, and high-altitude operation is much are solved. According to the technical scheme, the vertical construction method for the offshore wind power four-pile jacket comprises the steps of S1, manufacturing a U-shaped frame, S2, splitting the U-shaped frame, S3, manufacturing a lower connecting piece and an upper connecting piece, S4, manufacturing a lower single body, S5, manufacturing an upper single body, S6, assembling a transition section, and S7, hoisting and assembling the upper single body to the top of the lower single body. The vertical construction method for the offshore wind power four-pile jacket has the beneficial effects that the process flow is optimized and reasonable, the high-altitude operation amount is small, the operation safety risk is low, the manufacturing period is short, and the manufacturing cost is low.
本发明提供了一种海上风电四桩导管架竖立建造方法,属于导管架安装技术领域。解决了导管架建造工序多、施工难度大、高空作业多等问题。其技术方案为:一种海上风电四桩导管架竖立建造方法,包括:步骤S1:制作U型架,步骤S2:拆分所述U型架,步骤S3:制作下连接片、上连接片,步骤S4:制作下单体,步骤S5:制作上单体,步骤S6:拼装过渡段,步骤S7:将上单体吊装拼装于所述下单体顶部。本发明的有益效果为:本发明提供的一种海上风电四桩导管架竖立建造方法工序流程优化合理、高空作业量少、作业安全风险低、制作工期短、制作成本低。
Vertical construction method for offshore wind power four-pile jacket
The invention provides a vertical construction method for an offshore wind power four-pile jacket, and belongs to the technical field of jacket installation. The problems that jacket construction procedures are many, construction difficulty is large, and high-altitude operation is much are solved. According to the technical scheme, the vertical construction method for the offshore wind power four-pile jacket comprises the steps of S1, manufacturing a U-shaped frame, S2, splitting the U-shaped frame, S3, manufacturing a lower connecting piece and an upper connecting piece, S4, manufacturing a lower single body, S5, manufacturing an upper single body, S6, assembling a transition section, and S7, hoisting and assembling the upper single body to the top of the lower single body. The vertical construction method for the offshore wind power four-pile jacket has the beneficial effects that the process flow is optimized and reasonable, the high-altitude operation amount is small, the operation safety risk is low, the manufacturing period is short, and the manufacturing cost is low.
本发明提供了一种海上风电四桩导管架竖立建造方法,属于导管架安装技术领域。解决了导管架建造工序多、施工难度大、高空作业多等问题。其技术方案为:一种海上风电四桩导管架竖立建造方法,包括:步骤S1:制作U型架,步骤S2:拆分所述U型架,步骤S3:制作下连接片、上连接片,步骤S4:制作下单体,步骤S5:制作上单体,步骤S6:拼装过渡段,步骤S7:将上单体吊装拼装于所述下单体顶部。本发明的有益效果为:本发明提供的一种海上风电四桩导管架竖立建造方法工序流程优化合理、高空作业量少、作业安全风险低、制作工期短、制作成本低。
Vertical construction method for offshore wind power four-pile jacket
一种海上风电四桩导管架竖立建造方法
WANG JUN (Autor:in) / LIN HAIQIAO (Autor:in) / JU XIAOGANG (Autor:in) / CHEN XIAOXIANG (Autor:in) / TAO MEI (Autor:in) / SUN JINQUAN (Autor:in) / HUANG ZEYIN (Autor:in) / DING XIAOLIANG (Autor:in) / LU QI (Autor:in)
10.11.2023
Patent
Elektronische Ressource
Chinesisch
Offshore wind power underwater four-pile jacket foundation construction pile stabilizing platform
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Offshore wind power pile shoe expansion type jacket foundation
Europäisches Patentamt | 2021
|Hydraulic dredging construction method for hard clay in offshore wind power jacket foundation pile
Europäisches Patentamt | 2023
|Automatic pile pitching control system for offshore wind power jacket
Europäisches Patentamt | 2023
|