Offshore wind power underwater four-pile jacket foundation construction pile stabilizing platform
According to the offshore wind power underwater four-pile jacket foundation construction pile stabilizing platform, through arrangement of a foundation platform, a hammering platform and other devices, during construction, a synchronous plate is hoisted to the upper sides of positioning piles, four connecting sleeves and the four positioning piles are connected together in a clamped mode, then a pile hammer is hoisted to the top end of a hit disc, the hit disc is hammered, and the driven disc is driven to rotate; the multiple positioning piles descend synchronously, the multiple positioning piles are driven synchronously at the same time, the perpendicularity of the multiple positioning piles can be improved, the position precision of the multiple positioning piles is improved, the working time of a pile driving barge is greatly shortened, the construction efficiency is improved, and the engineering period is shortened; and in the rotary hammering process of the pile hammer, the hammering effect on the four positioning piles can be improved, the hammering position can be rapidly and conveniently changed, and the construction progress is greatly accelerated.
本发明涉及一种海上风电水下四桩导管架基础施工稳桩平台,通过基础平台和锤压平台等装置的设置,施工时,将同步板吊装至定位桩的上侧,并使四个连接套与四个定位桩卡接在一起,再吊装打桩锤至受击盘的顶端,并对受击盘进行捶打,使多个定位桩同步下降,通过同时对多个定位桩进行同步打桩,不仅能提高多个定位桩的垂直度,还增加了多个定位桩之间的位置精度,且大大减少了打桩船的工作时长,提高了施工效率,节约工程周期,同时通过对受击盘等装置的设置,打桩锤在旋转捶打的过程中,不仅能提高对四个定位桩的捶打效果,还能较快速、便捷的改变捶打位置,极大的加快了施工进度。
Offshore wind power underwater four-pile jacket foundation construction pile stabilizing platform
According to the offshore wind power underwater four-pile jacket foundation construction pile stabilizing platform, through arrangement of a foundation platform, a hammering platform and other devices, during construction, a synchronous plate is hoisted to the upper sides of positioning piles, four connecting sleeves and the four positioning piles are connected together in a clamped mode, then a pile hammer is hoisted to the top end of a hit disc, the hit disc is hammered, and the driven disc is driven to rotate; the multiple positioning piles descend synchronously, the multiple positioning piles are driven synchronously at the same time, the perpendicularity of the multiple positioning piles can be improved, the position precision of the multiple positioning piles is improved, the working time of a pile driving barge is greatly shortened, the construction efficiency is improved, and the engineering period is shortened; and in the rotary hammering process of the pile hammer, the hammering effect on the four positioning piles can be improved, the hammering position can be rapidly and conveniently changed, and the construction progress is greatly accelerated.
本发明涉及一种海上风电水下四桩导管架基础施工稳桩平台,通过基础平台和锤压平台等装置的设置,施工时,将同步板吊装至定位桩的上侧,并使四个连接套与四个定位桩卡接在一起,再吊装打桩锤至受击盘的顶端,并对受击盘进行捶打,使多个定位桩同步下降,通过同时对多个定位桩进行同步打桩,不仅能提高多个定位桩的垂直度,还增加了多个定位桩之间的位置精度,且大大减少了打桩船的工作时长,提高了施工效率,节约工程周期,同时通过对受击盘等装置的设置,打桩锤在旋转捶打的过程中,不仅能提高对四个定位桩的捶打效果,还能较快速、便捷的改变捶打位置,极大的加快了施工进度。
Offshore wind power underwater four-pile jacket foundation construction pile stabilizing platform
一种海上风电水下四桩导管架基础施工稳桩平台
FENG XIAOXING (Autor:in) / CAO CHUNTONG (Autor:in) / GAO FENG (Autor:in) / MEI WEIDONG (Autor:in) / ZHANG JIN (Autor:in) / TAN LIAOKAI (Autor:in) / JI PENG (Autor:in)
27.02.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Deepwater modular pile stabilizing platform for offshore wind power foundation construction
Europäisches Patentamt | 2023
|Vertical construction method for offshore wind power four-pile jacket
Europäisches Patentamt | 2023
|Pile machine for offshore wind power floating type pile stabilizing platform construction
Europäisches Patentamt | 2023
|Offshore wind power pile shoe expansion type jacket foundation
Europäisches Patentamt | 2021
|