Shock insulation suspension elevator shaft reverse construction method
The invention discloses a top-down construction method for a shock insulation suspension elevator shaft. The top-down construction method comprises the steps that firstly, an elevator shaft bottom plate is placed in advance; 2, constructing a first layer of wallboards of the shock insulation suspension elevator shaft; 3, constructing a second-layer wall plate of the shock insulation suspension elevator shaft; 4, constructing a third-layer wall plate of the shock insulation suspension elevator shaft; 5, connecting an elevator shaft bottom plate; sixthly, grouting is conducted; and 7, performing waterproof and anti-seepage treatment. The wall plates of all layers of the elevator shaft are suspended in a simulated construction shock insulation mode from top to bottom, it is avoided that a supporting foundation layer is laid in a basement elevator descending plate, construction is in order, the construction procedure of dismantling the supporting foundation layer in a narrow space in the later period is omitted, and construction efficiency is improved. The effect that a shaft way of the shock insulation elevator shaft and a basement elevator descending plate are disconnected on the lower portion of a shock insulation layer is guaranteed, meanwhile, a suspension framework deformation monitor is pre-buried on a suspension framework, real-time data about whether the suspension framework deforms or not are monitored, and the operation safety state of the suspension elevator shaft is monitored.
本发明公开了一种隔震悬挂电梯井逆作施工方法,包括步骤:一、预放电梯井底板;二、施工隔震悬挂电梯井第一层墙板;三、施工隔震悬挂电梯井第二层墙板;四、施工隔震悬挂电梯井第三层墙板;五、连接电梯井底板;六、注浆;七、防水防渗处理。本发明通过由上至下的采用拟作式施工隔震悬挂电梯井各层墙板,避免在地下室电梯降板内铺设支撑基础层,施工井然有序,免除后期在狭小空间拆除支撑基础层的施工工序,保证隔震电梯井的井道与地下室电梯降板在隔震层下部断开的效果,同时在悬挂骨架上预埋悬挂骨架变形监测器,监测悬挂骨架是否变形实时数据,监控悬挂电梯井运行安全状态。
Shock insulation suspension elevator shaft reverse construction method
The invention discloses a top-down construction method for a shock insulation suspension elevator shaft. The top-down construction method comprises the steps that firstly, an elevator shaft bottom plate is placed in advance; 2, constructing a first layer of wallboards of the shock insulation suspension elevator shaft; 3, constructing a second-layer wall plate of the shock insulation suspension elevator shaft; 4, constructing a third-layer wall plate of the shock insulation suspension elevator shaft; 5, connecting an elevator shaft bottom plate; sixthly, grouting is conducted; and 7, performing waterproof and anti-seepage treatment. The wall plates of all layers of the elevator shaft are suspended in a simulated construction shock insulation mode from top to bottom, it is avoided that a supporting foundation layer is laid in a basement elevator descending plate, construction is in order, the construction procedure of dismantling the supporting foundation layer in a narrow space in the later period is omitted, and construction efficiency is improved. The effect that a shaft way of the shock insulation elevator shaft and a basement elevator descending plate are disconnected on the lower portion of a shock insulation layer is guaranteed, meanwhile, a suspension framework deformation monitor is pre-buried on a suspension framework, real-time data about whether the suspension framework deforms or not are monitored, and the operation safety state of the suspension elevator shaft is monitored.
本发明公开了一种隔震悬挂电梯井逆作施工方法,包括步骤:一、预放电梯井底板;二、施工隔震悬挂电梯井第一层墙板;三、施工隔震悬挂电梯井第二层墙板;四、施工隔震悬挂电梯井第三层墙板;五、连接电梯井底板;六、注浆;七、防水防渗处理。本发明通过由上至下的采用拟作式施工隔震悬挂电梯井各层墙板,避免在地下室电梯降板内铺设支撑基础层,施工井然有序,免除后期在狭小空间拆除支撑基础层的施工工序,保证隔震电梯井的井道与地下室电梯降板在隔震层下部断开的效果,同时在悬挂骨架上预埋悬挂骨架变形监测器,监测悬挂骨架是否变形实时数据,监控悬挂电梯井运行安全状态。
Shock insulation suspension elevator shaft reverse construction method
一种隔震悬挂电梯井逆作施工方法
CHEN WENFU (Autor:in) / LIU YANG (Autor:in) / SHEN RONGJIAN (Autor:in) / GUAN MUHONG (Autor:in) / SHAN YUMENG (Autor:in)
10.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04G
SCAFFOLDING
,
Baugerüste
/
G01B
MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS
,
Messen der Länge, der Dicke oder ähnlicher linearer Abmessungen
Elevator shaft structure of shock insulation structure and construction method
Europäisches Patentamt | 2022
|Construction method for hanging bottom support of elevator shaft in shock insulation system
Europäisches Patentamt | 2022
|Elevator shaft prefabricated frame and elevator shaft construction method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|