The invention discloses a steel sheet pile convenient construction method for deep foundation pit supporting. The method comprises the steps that S1, positioning paying-off is conducted on a pipe ditch needing to be excavated, and lime powder is scattered along the line; s2, a steel sheet pile needing to be driven is placed on the edge of the control line and is horizontal to the inner side of the lime line, namely an inner cavity of a pipe ditch needing to be excavated and is parallel to the drawn lime powder line; s3, at the two ends of the two sides of the horizontal steel sheet pile, each side is next to the horizontal steel sheet pile, and two steel sheet piles are driven through other steel sheet piles so that the steel sheet piles to be positioned can be temporarily fixed; s4, vertical steel sheet pile driving is conducted along the edge of the horizontal steel sheet pile; and S5, every time the position of the length of one steel sheet pile is driven, the horizontal steel sheet pile is gradually moved in the direction needing to be constructed, and the steps are repeated. By means of the method, steel sheet pile construction can be rapidly and accurately completed, and adjustment can be conducted at any time according to the top opening of the deep foundation pit and the pipe diameter of a drainage pipeline.
本发明公开了一种深基坑支护的钢板桩便捷施工方法,方法包括:S1、需开挖管沟的定位放线,沿线撒石灰粉;S2、用所需施打的钢板桩放一根于控制线边缘,水平于石灰线的内侧,即需开挖管沟的内腔,平行于所划的石灰粉线条;S3、在水平的钢板桩两侧的两端,每侧紧挨着水平的钢板桩,用其它钢板桩打2根钢板桩,以便临时固定进行定位的钢板桩;S4、沿着水平的钢板桩边缘进行垂直的钢板桩施打;S5、每打完一根钢板桩长度的位置,沿着需施工的方向,逐渐移动水平的钢板桩,重复以上步骤。本发明的方法可快速、准确地完成钢板桩施工,并且可根据深基坑顶口、排水管道管径大小来随时进行调整。
The invention discloses a steel sheet pile convenient construction method for deep foundation pit supporting. The method comprises the steps that S1, positioning paying-off is conducted on a pipe ditch needing to be excavated, and lime powder is scattered along the line; s2, a steel sheet pile needing to be driven is placed on the edge of the control line and is horizontal to the inner side of the lime line, namely an inner cavity of a pipe ditch needing to be excavated and is parallel to the drawn lime powder line; s3, at the two ends of the two sides of the horizontal steel sheet pile, each side is next to the horizontal steel sheet pile, and two steel sheet piles are driven through other steel sheet piles so that the steel sheet piles to be positioned can be temporarily fixed; s4, vertical steel sheet pile driving is conducted along the edge of the horizontal steel sheet pile; and S5, every time the position of the length of one steel sheet pile is driven, the horizontal steel sheet pile is gradually moved in the direction needing to be constructed, and the steps are repeated. By means of the method, steel sheet pile construction can be rapidly and accurately completed, and adjustment can be conducted at any time according to the top opening of the deep foundation pit and the pipe diameter of a drainage pipeline.
本发明公开了一种深基坑支护的钢板桩便捷施工方法,方法包括:S1、需开挖管沟的定位放线,沿线撒石灰粉;S2、用所需施打的钢板桩放一根于控制线边缘,水平于石灰线的内侧,即需开挖管沟的内腔,平行于所划的石灰粉线条;S3、在水平的钢板桩两侧的两端,每侧紧挨着水平的钢板桩,用其它钢板桩打2根钢板桩,以便临时固定进行定位的钢板桩;S4、沿着水平的钢板桩边缘进行垂直的钢板桩施打;S5、每打完一根钢板桩长度的位置,沿着需施工的方向,逐渐移动水平的钢板桩,重复以上步骤。本发明的方法可快速、准确地完成钢板桩施工,并且可根据深基坑顶口、排水管道管径大小来随时进行调整。
Steel sheet pile convenient construction method for deep foundation pit support
一种深基坑支护的钢板桩便捷施工方法
14.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Deep foundation pit Larsen steel sheet pile bottom sloping support construction method
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2024
|Steel sheet pile support notch treatment method for construction foundation trench
Europäisches Patentamt | 2023
|Construction method of underwater pile foundation steel sheet pile cofferdam
Europäisches Patentamt | 2023
|STEEL PIPE SHEET PILE WELL FOUNDATION CONSTRUCTION METHOD
Europäisches Patentamt | 2023
|