Mounting device and mounting method for advanced vibration reduction embedded track steel tank
The invention discloses a mounting device and a mounting method for an advanced vibration reduction embedded track steel tank, and belongs to the technical field of track construction. The two groups of adjusting pieces are oppositely arranged at the two ends of the adjusting cross beam and are used for adjusting the track panel frame; the two sets of fixing pieces are oppositely arranged at the two ends of the adjusting cross beam, correspond to the adjusting pieces and are used for fixing the adjusting cross beam to the tunnel wall; and the steel tank fixing column is fixedly connected with the adjusting cross beam and is used for connecting a steel tank with the adjusting cross beam. The defect that in an existing construction method, the high-level vibration reduction embedded track steel tank in the tunnel cannot be effectively adjusted after being installed is overcome, the construction speed can be effectively increased, safety is ensured, and economic benefits are improved.
本发明公开了一种高等减振嵌入式轨道钢槽安装装置及安装方法,属于轨道施工技术领域,其包括:调整横梁;2组调整件,2组所述调整件相对设置在所述调整横梁的两端,用于对轨排架进行调整;2组固定件,2组所述固定件相对设置在所述调整横梁的两端,并与所述调整件对应设置,用于将所述调整横梁固定于隧道壁上;钢槽固定柱,所述钢槽固定柱与所述调整横梁固定连接,用于连接钢槽与所述调整横梁。本发明克服了现行施工方法中隧道内高等减振嵌入式轨道钢槽安装完成后无法有效调整的弊端,能够有效地加快施工速度,确保安全,提高经济效益。
Mounting device and mounting method for advanced vibration reduction embedded track steel tank
The invention discloses a mounting device and a mounting method for an advanced vibration reduction embedded track steel tank, and belongs to the technical field of track construction. The two groups of adjusting pieces are oppositely arranged at the two ends of the adjusting cross beam and are used for adjusting the track panel frame; the two sets of fixing pieces are oppositely arranged at the two ends of the adjusting cross beam, correspond to the adjusting pieces and are used for fixing the adjusting cross beam to the tunnel wall; and the steel tank fixing column is fixedly connected with the adjusting cross beam and is used for connecting a steel tank with the adjusting cross beam. The defect that in an existing construction method, the high-level vibration reduction embedded track steel tank in the tunnel cannot be effectively adjusted after being installed is overcome, the construction speed can be effectively increased, safety is ensured, and economic benefits are improved.
本发明公开了一种高等减振嵌入式轨道钢槽安装装置及安装方法,属于轨道施工技术领域,其包括:调整横梁;2组调整件,2组所述调整件相对设置在所述调整横梁的两端,用于对轨排架进行调整;2组固定件,2组所述固定件相对设置在所述调整横梁的两端,并与所述调整件对应设置,用于将所述调整横梁固定于隧道壁上;钢槽固定柱,所述钢槽固定柱与所述调整横梁固定连接,用于连接钢槽与所述调整横梁。本发明克服了现行施工方法中隧道内高等减振嵌入式轨道钢槽安装完成后无法有效调整的弊端,能够有效地加快施工速度,确保安全,提高经济效益。
Mounting device and mounting method for advanced vibration reduction embedded track steel tank
一种高等减振嵌入式轨道钢槽安装装置及安装方法
ZHANG XIHAI (Autor:in) / FAN HONGLIANG (Autor:in) / WANG DI (Autor:in) / ZHAO HUAYUN (Autor:in) / FAN JIANTAO (Autor:in) / AN HUAN (Autor:in) / SHI JINLONG (Autor:in) / MA WENRUI (Autor:in) / TIAN LIN (Autor:in) / SUN JUNHONG (Autor:in)
17.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Steel track beam mounting mould and steel track beam mounting method
Europäisches Patentamt | 2020
|Embedded steel plate mounting device and mounting method
Europäisches Patentamt | 2023
|Magnetic suspension track mounting device and mounting method
Europäisches Patentamt | 2024
|Track beam mounting device and mounting method thereof
Europäisches Patentamt | 2020
|