Material transferring construction method free of discharging platform
The invention discloses a material transferring construction method without an unloading platform. Comprising the steps that embedded parts are inserted into steel pipes in an elevator shaft to serve as elevator shaft plane protection steel pipes, to-be-transferred materials dismantled by a formwork dismantling layer are carried to the opening of the elevator shaft, the elevator shaft plane protection steel pipes above the formwork dismantling layer are dismantled, a hoisting bucket is hoisted upwards in the elevator shaft to the position of the formwork dismantling layer, and the hoisting bucket is lifted to the position of the formwork dismantling layer. And the hoisting bucket is hoisted to an operation layer to complete material transfer, and the lower elevator shaft plane protection steel pipe is recovered. The use of a traditional unloading platform is avoided, so that the problems that the stability of a wood formwork between the unloading platform and a building is poor, workers often slip, materials or tools have potential safety hazards such as falling from the unloading platform or the side face of a channel, the construction difficulty of blocking the embedded hole part of the unloading platform is large, and the construction cost is low are solved. And leakage risk and other quality problems exist in the later period.
本发明公开了一种免卸料平台的转料施工方法,包括电梯井道内采用预埋件插入钢管作为电梯井道平面防护钢管、将拆模层所拆除的待转运材料搬至电梯井口部、拆除所述拆模层以上的所述电梯井道平面防护钢管、将吊运吊斗在电梯井道内向上吊运至拆模层位置、将所述吊运吊斗吊至作业层完成材料转运、恢复下方电梯井道平面防护钢管等步骤。本发明避免了使用传统卸料平台,从而避免了卸料平台与建筑物之间木模板的稳定性差,常使工人滑倒的问题,材料或用具从卸料平台或通道侧面发生高处落物等安全隐患问题,以及卸料平台预埋洞口部分封堵施工难度大,后期存在渗漏风险等质量问题。
Material transferring construction method free of discharging platform
The invention discloses a material transferring construction method without an unloading platform. Comprising the steps that embedded parts are inserted into steel pipes in an elevator shaft to serve as elevator shaft plane protection steel pipes, to-be-transferred materials dismantled by a formwork dismantling layer are carried to the opening of the elevator shaft, the elevator shaft plane protection steel pipes above the formwork dismantling layer are dismantled, a hoisting bucket is hoisted upwards in the elevator shaft to the position of the formwork dismantling layer, and the hoisting bucket is lifted to the position of the formwork dismantling layer. And the hoisting bucket is hoisted to an operation layer to complete material transfer, and the lower elevator shaft plane protection steel pipe is recovered. The use of a traditional unloading platform is avoided, so that the problems that the stability of a wood formwork between the unloading platform and a building is poor, workers often slip, materials or tools have potential safety hazards such as falling from the unloading platform or the side face of a channel, the construction difficulty of blocking the embedded hole part of the unloading platform is large, and the construction cost is low are solved. And leakage risk and other quality problems exist in the later period.
本发明公开了一种免卸料平台的转料施工方法,包括电梯井道内采用预埋件插入钢管作为电梯井道平面防护钢管、将拆模层所拆除的待转运材料搬至电梯井口部、拆除所述拆模层以上的所述电梯井道平面防护钢管、将吊运吊斗在电梯井道内向上吊运至拆模层位置、将所述吊运吊斗吊至作业层完成材料转运、恢复下方电梯井道平面防护钢管等步骤。本发明避免了使用传统卸料平台,从而避免了卸料平台与建筑物之间木模板的稳定性差,常使工人滑倒的问题,材料或用具从卸料平台或通道侧面发生高处落物等安全隐患问题,以及卸料平台预埋洞口部分封堵施工难度大,后期存在渗漏风险等质量问题。
Material transferring construction method free of discharging platform
一种免卸料平台的转料施工方法
HUANG JIE (Autor:in) / ZHANG ZHAOQI (Autor:in) / MA TENGFEI (Autor:in)
17.11.2023
Patent
Elektronische Ressource
Chinesisch
Convenient material transferring and discharging platform
Europäisches Patentamt | 2023
|Transferring method for wallboards longer than discharging platform
Europäisches Patentamt | 2023
|Building construction material transport rail transferring platform