Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway anti-seepage geotechnical cloth laying method
The invention provides a highway anti-seepage geotechnical cloth laying method, and relates to the technical field of geotechnical cloth laying, and the highway anti-seepage geotechnical cloth laying method comprises the following steps: S1, roadbed cleaning work, S2, roadbed width measurement and calculation, S3, roadbed line drawing work, S4, geotechnical cloth adjustment work, S5, geotechnical cloth laying work, S6, geotechnical cloth fixing work, scanning work of a base line on the surface of a roadbed by a visual monitoring probe, scanning data is transmitted to the positioning control module, the positioning control module compares and analyzes the scanning information to position the base line position, the positioning control module controls and adjusts the electric push rod to work to drive and adjust the position of the geotechnical cloth according to the scanning positioning data, and the geotechnical cloth is adjusted in the direction of the base line of the base line. And the geotextile can be positioned and aligned, and the phenomenon of bending is reduced.
本发明提供一种公路防渗漏土工铺布方法,涉及土工布铺设技术领域,包括以下步骤:S1,路基清理工作,S2,路基宽度测量计算,S3,路基画线工作,S4,土工布调节作业,S5,土工布铺设作业,S6,土工布固定作业,视觉监测探头对路基表面的基线进行扫描工作,并且将扫描数据传输至定位控制模块,通过定位控制模块对扫描信息进行对比分析,进而定位基线位置,定位控制模块根据扫描定位数据控制调节电动推杆工作驱动调节土工布的位置,将土工布向基线基准线方向调整,能够对土工布进行定位对齐的工作,减少出现弯曲的现象。
Highway anti-seepage geotechnical cloth laying method
The invention provides a highway anti-seepage geotechnical cloth laying method, and relates to the technical field of geotechnical cloth laying, and the highway anti-seepage geotechnical cloth laying method comprises the following steps: S1, roadbed cleaning work, S2, roadbed width measurement and calculation, S3, roadbed line drawing work, S4, geotechnical cloth adjustment work, S5, geotechnical cloth laying work, S6, geotechnical cloth fixing work, scanning work of a base line on the surface of a roadbed by a visual monitoring probe, scanning data is transmitted to the positioning control module, the positioning control module compares and analyzes the scanning information to position the base line position, the positioning control module controls and adjusts the electric push rod to work to drive and adjust the position of the geotechnical cloth according to the scanning positioning data, and the geotechnical cloth is adjusted in the direction of the base line of the base line. And the geotextile can be positioned and aligned, and the phenomenon of bending is reduced.
本发明提供一种公路防渗漏土工铺布方法,涉及土工布铺设技术领域,包括以下步骤:S1,路基清理工作,S2,路基宽度测量计算,S3,路基画线工作,S4,土工布调节作业,S5,土工布铺设作业,S6,土工布固定作业,视觉监测探头对路基表面的基线进行扫描工作,并且将扫描数据传输至定位控制模块,通过定位控制模块对扫描信息进行对比分析,进而定位基线位置,定位控制模块根据扫描定位数据控制调节电动推杆工作驱动调节土工布的位置,将土工布向基线基准线方向调整,能够对土工布进行定位对齐的工作,减少出现弯曲的现象。
Highway anti-seepage geotechnical cloth laying method
一种公路防渗漏土工铺布方法
CHEN JUNQIANG (Autor:in) / QIAO BAOLIN (Autor:in) / WU SHUO (Autor:in) / ZHAO ZHIJUN (Autor:in) / YOU WEIJIA (Autor:in) / FU JUN (Autor:in)
01.12.2023
Patent
Elektronische Ressource
Chinesisch
Anti-seepage laying device and method for geotechnical slope
Europäisches Patentamt | 2021
|Geotechnical cloth laying device and laying method thereof
Europäisches Patentamt | 2023
|Water seepage prevention laying device for geotechnical engineering slope
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|