Support building and continuous beam cast-in-place box beam construction technology
The invention relates to a bracket building and continuous beam cast-in-place box beam construction process which comprises the following steps: step 1, firstly, placing a support frame module to be hoisted at a storage station; then, the part taking lifting appliance lifts the supporting frame module from the storage station to the bearing station, in the lifting process, the auxiliary swing plate is opened to enable the supporting frame module to pass through, and when the supporting frame module reaches the bearing station, the auxiliary swing plate is reset to the lifting block to carry the supporting frame module; secondly, the fingers are pulled to move forwards, cross the middle swing transition plate and then reach the bearing station, the swing hook overcomes the reset spring piece to topple backwards and reach the stroke end point, and the swing hook is reset through the reset spring piece, hooks the supporting frame module to transversely move, reaches the waiting station carrying table through the middle swing transition plate and waits for being lifted away. The device is reasonable in design, compact in structure and convenient to use.
本发明涉及支架搭建及连续梁现浇箱梁施工工艺,工艺包括步骤一,首先,在存储工位放置待吊运的支撑架模块;然后,取件吊具将支撑架模块从存储工位上升到承托工位,在上升的过程中,辅助摆动板打开,使得支撑架模块通过,当到达承托工位,辅助摆动板复位到托举块上,托载支撑架模块;其次,牵拉手指前行,越过中间摆动过渡板后达到承托工位,摆动勾手克服复位弹簧件向后倾倒,到达行程终点,摆动勾手通过复位弹簧件复位,勾住支撑架模块横向移动,通过中间摆动过渡板到达等待工位载台,等待吊走。本发明设计合理、结构紧凑且使用方便。
Support building and continuous beam cast-in-place box beam construction technology
The invention relates to a bracket building and continuous beam cast-in-place box beam construction process which comprises the following steps: step 1, firstly, placing a support frame module to be hoisted at a storage station; then, the part taking lifting appliance lifts the supporting frame module from the storage station to the bearing station, in the lifting process, the auxiliary swing plate is opened to enable the supporting frame module to pass through, and when the supporting frame module reaches the bearing station, the auxiliary swing plate is reset to the lifting block to carry the supporting frame module; secondly, the fingers are pulled to move forwards, cross the middle swing transition plate and then reach the bearing station, the swing hook overcomes the reset spring piece to topple backwards and reach the stroke end point, and the swing hook is reset through the reset spring piece, hooks the supporting frame module to transversely move, reaches the waiting station carrying table through the middle swing transition plate and waits for being lifted away. The device is reasonable in design, compact in structure and convenient to use.
本发明涉及支架搭建及连续梁现浇箱梁施工工艺,工艺包括步骤一,首先,在存储工位放置待吊运的支撑架模块;然后,取件吊具将支撑架模块从存储工位上升到承托工位,在上升的过程中,辅助摆动板打开,使得支撑架模块通过,当到达承托工位,辅助摆动板复位到托举块上,托载支撑架模块;其次,牵拉手指前行,越过中间摆动过渡板后达到承托工位,摆动勾手克服复位弹簧件向后倾倒,到达行程终点,摆动勾手通过复位弹簧件复位,勾住支撑架模块横向移动,通过中间摆动过渡板到达等待工位载台,等待吊走。本发明设计合理、结构紧凑且使用方便。
Support building and continuous beam cast-in-place box beam construction technology
支架搭建及连续梁现浇箱梁施工工艺
REN SHENGLI (Autor:in) / TAO YONGBO (Autor:in) / ZHANG DONG (Autor:in) / LIU QIANG (Autor:in) / HUANG BO (Autor:in) / TIAN BAIQUAN (Autor:in) / YANG XIAOBO (Autor:in) / KE ZHENG (Autor:in) / YANG KE (Autor:in) / ZHANG QING (Autor:in)
01.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
CONTINUOUS-BEAM-SUPPORT-METHOD-BASED ONE-TIME CAST-IN-PLACE CONSTRUCTION METHOD
Europäisches Patentamt | 2024
|Overwater cast-in-place continuous beam construction monitoring method
Europäisches Patentamt | 2023
|Continuous beam side pier beam section bracket balance cast-in-place construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|