CONTINUOUS-BEAM-SUPPORT-METHOD-BASED ONE-TIME CAST-IN-PLACE CONSTRUCTION METHOD
Disclosed in the present invention is a continuous-beam-support-method-based one-time cast-in-place construction method. The method comprises: laying box girder frameworks on a disk-lock-type full support; binding steel bars, pre-embedding corrugated pipes, and pouring concrete in the frameworks after all the frameworks are laid; then, mounting prestressed systems in the corrugated pipes; and finally, mounting steel arch ribs and suspenders, so that a bridge is constructed, wherein traction devices for assisting in the mounting of the prestressed systems are arranged in the corrugated pipes. When the bridge is constructed by the construction method of the present invention, one-time continuous concrete pouring is employed, and no construction joints are arranged, such that the aesthetics and the quality of a box girder are ensured; and the prestressed systems are mounted with the assistance of the traction devices during a construction process, preventing end portions of the prestressed systems and the corrugated pipes from coming into contact, thereby avoiding damage being caused to the corrugated pipes.
Est divulgué dans la présente invention un procédé de construction coulé sur place à usage unique basé sur un procédé de support de poutre continu. Le procédé consiste : à poser des cadres de poutre de boîte sur un support complet de type à verrouillage de disque ; lier des barres d'acier, pré-incorporer des tuyaux ondulés et verser du béton dans les cadres après que tous les cadres sont posés ; puis à monter des systèmes précontraints dans les tuyaux ondulés ; et enfin, à monter des nervures et des éléments de suspension d'arc en acier, de telle sorte qu'un pont est construit, des dispositifs de traction pour aider au montage des systèmes précontraints étant agencés dans les tuyaux ondulés. Lorsque le pont est construit par le procédé de construction de la présente invention, un coulage de béton continu à usage unique est utilisé, et aucun joint de construction n'est agencé, de telle sorte que l'esthétique et la qualité d'une poutre de boîte sont assurées ; et les systèmes précontraints sont montés à l'aide des dispositifs de traction pendant un processus de construction, empêchant des parties d'extrémité des systèmes précontraints et des tuyaux ondulés d'entrer en contact, ce qui permet d'éviter un endommagement causé aux tuyaux ondulés.
本发明公开了一种连续梁支架法一次现浇施工方法,其在盘扣式满堂支架上铺设箱梁模板,待所有的模板铺设完成后,在模板内捆扎钢筋、预埋波纹管和浇筑混凝土,随后在波纹管内安装预应力体系,再进行钢拱肋和吊杆的安装,桥梁施工完成,其中,波纹管的内部设有用于辅助预应力体系安装的牵引装置。本发明的施工方法对桥梁进行施工时,采用一次混凝土连续浇筑成型,不设置施工缝,保证了箱梁的美观性和质量,且在施工的过程中通过牵引装置辅助安装预应力体系,避免了预应力体系的端头部与波纹管接触,造成波纹管的损伤。
CONTINUOUS-BEAM-SUPPORT-METHOD-BASED ONE-TIME CAST-IN-PLACE CONSTRUCTION METHOD
Disclosed in the present invention is a continuous-beam-support-method-based one-time cast-in-place construction method. The method comprises: laying box girder frameworks on a disk-lock-type full support; binding steel bars, pre-embedding corrugated pipes, and pouring concrete in the frameworks after all the frameworks are laid; then, mounting prestressed systems in the corrugated pipes; and finally, mounting steel arch ribs and suspenders, so that a bridge is constructed, wherein traction devices for assisting in the mounting of the prestressed systems are arranged in the corrugated pipes. When the bridge is constructed by the construction method of the present invention, one-time continuous concrete pouring is employed, and no construction joints are arranged, such that the aesthetics and the quality of a box girder are ensured; and the prestressed systems are mounted with the assistance of the traction devices during a construction process, preventing end portions of the prestressed systems and the corrugated pipes from coming into contact, thereby avoiding damage being caused to the corrugated pipes.
Est divulgué dans la présente invention un procédé de construction coulé sur place à usage unique basé sur un procédé de support de poutre continu. Le procédé consiste : à poser des cadres de poutre de boîte sur un support complet de type à verrouillage de disque ; lier des barres d'acier, pré-incorporer des tuyaux ondulés et verser du béton dans les cadres après que tous les cadres sont posés ; puis à monter des systèmes précontraints dans les tuyaux ondulés ; et enfin, à monter des nervures et des éléments de suspension d'arc en acier, de telle sorte qu'un pont est construit, des dispositifs de traction pour aider au montage des systèmes précontraints étant agencés dans les tuyaux ondulés. Lorsque le pont est construit par le procédé de construction de la présente invention, un coulage de béton continu à usage unique est utilisé, et aucun joint de construction n'est agencé, de telle sorte que l'esthétique et la qualité d'une poutre de boîte sont assurées ; et les systèmes précontraints sont montés à l'aide des dispositifs de traction pendant un processus de construction, empêchant des parties d'extrémité des systèmes précontraints et des tuyaux ondulés d'entrer en contact, ce qui permet d'éviter un endommagement causé aux tuyaux ondulés.
本发明公开了一种连续梁支架法一次现浇施工方法,其在盘扣式满堂支架上铺设箱梁模板,待所有的模板铺设完成后,在模板内捆扎钢筋、预埋波纹管和浇筑混凝土,随后在波纹管内安装预应力体系,再进行钢拱肋和吊杆的安装,桥梁施工完成,其中,波纹管的内部设有用于辅助预应力体系安装的牵引装置。本发明的施工方法对桥梁进行施工时,采用一次混凝土连续浇筑成型,不设置施工缝,保证了箱梁的美观性和质量,且在施工的过程中通过牵引装置辅助安装预应力体系,避免了预应力体系的端头部与波纹管接触,造成波纹管的损伤。
CONTINUOUS-BEAM-SUPPORT-METHOD-BASED ONE-TIME CAST-IN-PLACE CONSTRUCTION METHOD
PROCÉDÉ DE CONSTRUCTION COULÉ SUR PLACE À USAGE UNIQUE BASÉ SUR UN PROCÉDÉ DE SUPPORT DE POUTRE CONTINU
连续梁支架法一次现浇施工方法
LENG YOULIANG (Autor:in) / CHEN BIN (Autor:in) / YIN AIGUO (Autor:in) / TIAN RUIHUA (Autor:in) / YUAN YIHUA (Autor:in) / ZOU MING (Autor:in) / GUO WEIXIN (Autor:in) / GAO KAIHENG (Autor:in) / MAO GUOLI (Autor:in) / LIU JIANWEN (Autor:in)
07.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Support building and continuous beam cast-in-place box beam construction technology
Europäisches Patentamt | 2023
|Overwater cast-in-place continuous beam construction monitoring method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|