New and old roadbed base layer splicing seam construction method
The invention relates to a new and old roadbed base layer splicing seam construction method, and relates to the technical field of new and old roadbed splicing construction. The method comprises the following steps: S1, lofting a pavement splicing seam position; s2, a cement board within the range of a road shoulder of the old pavement is excavated, and an asphalt layer is additionally laid on the top; s3, steps are excavated at the joints of the old pavement, so that the old pavement can be conveniently spliced with the new pavement in the transverse direction; s4, laying a cushion layer and a subbase layer; s5, a concrete layer is poured at the joint between the new pavement and the old pavement, and reinforcing is conducted through a reinforcing mechanism so that the connecting strength of the new pavement and the old pavement can be improved; paving a base layer; and S6, an asphalt surface layer is laid. The method has the effect of prolonging the service life of the old pavement.
本申请涉及一种新老路基基层拼接缝施工方法,涉及新老路基拼接施工技术领域。其包括以下步骤:S1:放样出路面拼接缝位置;S2:挖除旧路面路肩范围内水泥板,以及顶部加铺沥青层;S3:在旧路面的接缝处进行台阶挖设,便于横向与新路面拼接;S4:铺设垫层和底基层;S5:在新路面与旧路面之间的接缝处浇筑有混凝土层,并利用加固机构的加固,以提高新路面与旧路面的连接强度;然后铺设基层;S6:铺设沥青面层。本申请具有延长旧路面的使用寿命的效果。
New and old roadbed base layer splicing seam construction method
The invention relates to a new and old roadbed base layer splicing seam construction method, and relates to the technical field of new and old roadbed splicing construction. The method comprises the following steps: S1, lofting a pavement splicing seam position; s2, a cement board within the range of a road shoulder of the old pavement is excavated, and an asphalt layer is additionally laid on the top; s3, steps are excavated at the joints of the old pavement, so that the old pavement can be conveniently spliced with the new pavement in the transverse direction; s4, laying a cushion layer and a subbase layer; s5, a concrete layer is poured at the joint between the new pavement and the old pavement, and reinforcing is conducted through a reinforcing mechanism so that the connecting strength of the new pavement and the old pavement can be improved; paving a base layer; and S6, an asphalt surface layer is laid. The method has the effect of prolonging the service life of the old pavement.
本申请涉及一种新老路基基层拼接缝施工方法,涉及新老路基拼接施工技术领域。其包括以下步骤:S1:放样出路面拼接缝位置;S2:挖除旧路面路肩范围内水泥板,以及顶部加铺沥青层;S3:在旧路面的接缝处进行台阶挖设,便于横向与新路面拼接;S4:铺设垫层和底基层;S5:在新路面与旧路面之间的接缝处浇筑有混凝土层,并利用加固机构的加固,以提高新路面与旧路面的连接强度;然后铺设基层;S6:铺设沥青面层。本申请具有延长旧路面的使用寿命的效果。
New and old roadbed base layer splicing seam construction method
一种新老路基基层拼接缝施工方法
SHEN HUI (Autor:in) / LI MINGSHENG (Autor:in) / CHEN XINQUAN (Autor:in) / YIN XUNDONG (Autor:in) / LI SHEN (Autor:in)
05.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Recycled roadbed base layer filler and recycled roadbed construction method
Europäisches Patentamt | 2021
|Construction method of heat preservation roadbed base layer
Europäisches Patentamt | 2023
|Roadbed splicing structure for road widening construction
Europäisches Patentamt | 2022
|Roadbed and pavement splicing structure for roadbed engineering
Europäisches Patentamt | 2024
|