Construction method for hoisting and aligning super-long prestressed pipe pile to pile position
The invention relates to the technical field of super-long prestressed pipe pile hoisting, and discloses a super-long prestressed pipe pile hoisting and pile position aligning construction method which comprises the steps that a pile sinking limiting frame is arranged, a plurality of hoops are arranged on the pile sinking limiting frame, hollow areas are formed in the hoops, a crane is arranged, and a main lifting hook and an auxiliary lifting hook are arranged on the crane. The main lifting hook is connected with a main sling through a main lifting rope; the auxiliary lifting hook is connected with an auxiliary sling through an auxiliary lifting rope; the super-long prestressed pipe pile is horizontally hoisted to a hoisting area, the main lifting hook is pulled, the auxiliary lifting hook is stopped from being pulled until the super-long prestressed pipe pile is hoisted to be in a vertical shape, then the super-long prestressed pipe pile penetrates through the hollow areas of the multiple hoops, the pile sinking limiting frame is adjusted, and the super-long prestressed pipe pile is hoisted to be in a vertical shape. And after the center of the super-long prestressed pipe pile and the center of the pile position are aligned up and down, the main lifting hook is released to lift the super-long prestressed pipe pile. Therefore, the super-long prestressed pipe pile can be lifted to a set position, and meanwhile, the perpendicularity of the super-long prestressed pipe pile can be effectively controlled in the pile sinking process through the hoop.
本发明涉及超长预应力管桩起吊的技术领域,公开了超长预应力管桩起吊对准桩位施工方法,包括布置沉桩限位架,沉桩限位架上设有多个抱箍,抱箍中具有中空区域,布置吊车,吊车上设有主吊钩以及副吊钩,主吊钩通过主吊绳连接有主吊索,副吊钩通过副吊绳连接有副吊索;将超长预应力管桩呈水平状吊至吊装区,并通过收拉主吊钩,停止收拉副吊钩,直至超长预应力管桩起吊呈垂直状,再将超长预应力管桩穿过多个抱箍的中空区域,调节沉桩限位架,直至超长预应力管桩的中心与桩位的中心呈上下对齐布置后,松开主吊钩对超长预应力管桩的起吊。这样,即可将超长预应力管桩起吊至设定位置,同时通过抱箍可有效的控制沉桩过程中,超长预应力管桩的垂直度。
Construction method for hoisting and aligning super-long prestressed pipe pile to pile position
The invention relates to the technical field of super-long prestressed pipe pile hoisting, and discloses a super-long prestressed pipe pile hoisting and pile position aligning construction method which comprises the steps that a pile sinking limiting frame is arranged, a plurality of hoops are arranged on the pile sinking limiting frame, hollow areas are formed in the hoops, a crane is arranged, and a main lifting hook and an auxiliary lifting hook are arranged on the crane. The main lifting hook is connected with a main sling through a main lifting rope; the auxiliary lifting hook is connected with an auxiliary sling through an auxiliary lifting rope; the super-long prestressed pipe pile is horizontally hoisted to a hoisting area, the main lifting hook is pulled, the auxiliary lifting hook is stopped from being pulled until the super-long prestressed pipe pile is hoisted to be in a vertical shape, then the super-long prestressed pipe pile penetrates through the hollow areas of the multiple hoops, the pile sinking limiting frame is adjusted, and the super-long prestressed pipe pile is hoisted to be in a vertical shape. And after the center of the super-long prestressed pipe pile and the center of the pile position are aligned up and down, the main lifting hook is released to lift the super-long prestressed pipe pile. Therefore, the super-long prestressed pipe pile can be lifted to a set position, and meanwhile, the perpendicularity of the super-long prestressed pipe pile can be effectively controlled in the pile sinking process through the hoop.
本发明涉及超长预应力管桩起吊的技术领域,公开了超长预应力管桩起吊对准桩位施工方法,包括布置沉桩限位架,沉桩限位架上设有多个抱箍,抱箍中具有中空区域,布置吊车,吊车上设有主吊钩以及副吊钩,主吊钩通过主吊绳连接有主吊索,副吊钩通过副吊绳连接有副吊索;将超长预应力管桩呈水平状吊至吊装区,并通过收拉主吊钩,停止收拉副吊钩,直至超长预应力管桩起吊呈垂直状,再将超长预应力管桩穿过多个抱箍的中空区域,调节沉桩限位架,直至超长预应力管桩的中心与桩位的中心呈上下对齐布置后,松开主吊钩对超长预应力管桩的起吊。这样,即可将超长预应力管桩起吊至设定位置,同时通过抱箍可有效的控制沉桩过程中,超长预应力管桩的垂直度。
Construction method for hoisting and aligning super-long prestressed pipe pile to pile position
超长预应力管桩起吊对准桩位施工方法
WANG TONG (Autor:in) / LI XINLIN (Autor:in) / ZHENG XIAOGANG (Autor:in) / LIAO QIMING (Autor:in) / LEI BIN (Autor:in) / XIAO MU (Autor:in) / XIAO YANGBING (Autor:in) / ZHANG QIANG (Autor:in) / CAO SONG (Autor:in) / SHI JINPING (Autor:in)
05.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile planting construction method for prestressed pipe pile
Europäisches Patentamt | 2023
|Construction method of prestressed pipe pile and specially-made prestressed pipe pile thereof
Europäisches Patentamt | 2020
|Construction method of super-long prestressed pipe pile for compacting sand layer
Europäisches Patentamt | 2023
|