Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shear wall concrete protection layer and tie bar integrated device
The invention relates to the technical field of building construction, in particular to a shear wall concrete protection layer and tie bar integrated device which comprises mortise and tenon structures, two mortise and tenon structures form a group, a cross-shaped mounting groove is formed in the side wall of one end of each mortise and tenon structure, and a positioning groove is formed in the side wall of the inner end of each mounting groove; the depths of the mounting groove and the positioning groove in the vertical direction are greater than those of the mounting groove and the positioning groove in the transverse direction; mounting plates are fixedly mounted at the upper end and the lower end of the vertical mounting groove through bolts, mounting plates are fixedly mounted at the left end and the right end of the transverse mounting groove through bolts, moving plates are elastically connected to the side walls of the outer ends of the mounting plates through reset springs, and the sides, close to outer ports of the mounting grooves, of the moving plates are arc-shaped; according to the device, the defects of a traditional concrete protection layer buckle are overcome, the pull rod of the device can completely replace a shear wall tie bar, manpower, financial resources and material resources are greatly saved, the shear wall construction efficiency is improved, the construction period is shortened, and benefits are increased.
本发明涉及建筑施工技术领域,具体为一种剪力墙混凝土保护层和拉筋一体装置,包括:榫卯结构,两个榫卯结构为一组,所述榫卯结构的一端侧壁上开设有十字状的安装槽,安装槽的内端侧壁上开设有定位槽,竖直方向的安装槽和定位槽的深度大于横向的安装槽和定位槽的深度;竖直方向安装槽的上下端均通过螺栓固定安装有安装板,横向的安装槽的左右两端均通过螺栓固定安装安装板,安装板的外端侧壁上通过复位弹簧弹性连接有移动板,移动板靠近安装槽外端口的一侧为圆弧状;本装置不仅克服了传统混凝土保护层卡扣的缺点,而且该装置的拉杆可完全替代剪力墙拉筋,极大节省了人力、财力、物力,提高了剪力墙施工效率,节省工期,增加效益。
Shear wall concrete protection layer and tie bar integrated device
The invention relates to the technical field of building construction, in particular to a shear wall concrete protection layer and tie bar integrated device which comprises mortise and tenon structures, two mortise and tenon structures form a group, a cross-shaped mounting groove is formed in the side wall of one end of each mortise and tenon structure, and a positioning groove is formed in the side wall of the inner end of each mounting groove; the depths of the mounting groove and the positioning groove in the vertical direction are greater than those of the mounting groove and the positioning groove in the transverse direction; mounting plates are fixedly mounted at the upper end and the lower end of the vertical mounting groove through bolts, mounting plates are fixedly mounted at the left end and the right end of the transverse mounting groove through bolts, moving plates are elastically connected to the side walls of the outer ends of the mounting plates through reset springs, and the sides, close to outer ports of the mounting grooves, of the moving plates are arc-shaped; according to the device, the defects of a traditional concrete protection layer buckle are overcome, the pull rod of the device can completely replace a shear wall tie bar, manpower, financial resources and material resources are greatly saved, the shear wall construction efficiency is improved, the construction period is shortened, and benefits are increased.
本发明涉及建筑施工技术领域,具体为一种剪力墙混凝土保护层和拉筋一体装置,包括:榫卯结构,两个榫卯结构为一组,所述榫卯结构的一端侧壁上开设有十字状的安装槽,安装槽的内端侧壁上开设有定位槽,竖直方向的安装槽和定位槽的深度大于横向的安装槽和定位槽的深度;竖直方向安装槽的上下端均通过螺栓固定安装有安装板,横向的安装槽的左右两端均通过螺栓固定安装安装板,安装板的外端侧壁上通过复位弹簧弹性连接有移动板,移动板靠近安装槽外端口的一侧为圆弧状;本装置不仅克服了传统混凝土保护层卡扣的缺点,而且该装置的拉杆可完全替代剪力墙拉筋,极大节省了人力、财力、物力,提高了剪力墙施工效率,节省工期,增加效益。
Shear wall concrete protection layer and tie bar integrated device
一种剪力墙混凝土保护层和拉筋一体装置
GAO JINLONG (Autor:in) / LI MING (Autor:in) / ZHOU QI (Autor:in) / ZHAO PENGPENG (Autor:in) / MIAO HAILIANG (Autor:in)
05.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Concrete shear wall and protection layer thickness control device and method
Europäisches Patentamt | 2023
|Integrated prefabrication method for connecting concrete shear wall and filler wall
Europäisches Patentamt | 2015
|Shear wall hole lower concrete casting device and shear wall hole lower concrete casting method
Europäisches Patentamt | 2015
|