Construction method for suspending outer wall surface
The invention discloses an outer wall surface suspension construction method which comprises the following construction steps that S1, an outer wall surface suspension mounting device is moved to the inner side of an outer wall, and a plate is adsorbed to a transport box of the outer wall surface suspension mounting device; s2, a lifting rod of the outer wall face suspended mounting device is rotated to be in a horizontal state, then a bearing box of the outer wall face suspended mounting device is placed at a window, and a transport box is located on the outer side of the outer wall; s3, a lifting rod is rotated to be in a vertical state, and then an electric hammer of the outer wall face suspended mounting device is started to drill the preset position of the outer wall; s4, the transport box is moved, a preset hole of the plate is aligned with a hole formed in the outer wall, and then an electric wrench of the outer wall face suspended installation device is started to fix the plate to the outer wall; s5, after installation is completed, the bearing box is moved to enable the lifting rod to be located on the inner side of the outer wall. By means of the construction method, manual drilling conducted by workers can be omitted, the problem that the drilling precision is not high during drilling is effectively solved, and outer wall installation is more convenient.
本发明公开了一种外墙面悬空施工方法,包括以下施工步骤:S1:将外墙面悬空安装装置移动到外墙的内侧,将板材吸附在外墙面悬空安装装置的运输箱上;S2:将外墙面悬空安装装置的升降杆转动至水平状态,然后将外墙面悬空安装装置的承载箱放置于窗口处,使运输箱位于外墙的外侧;S3:将升降杆转动至竖直状态,然后启动外墙面悬空安装装置的电锤对外墙预设位置进行钻孔;S4:移动运输箱,将板材的预设孔与外墙的开设孔对齐,然后启动外墙面悬空安装装置的电动扳手将板材固定于外墙上;S5:安装完成后,移动承载箱使升降杆位于外墙内侧。通过本施工方法可以省去工作人员进行手动钻孔,也有效避免了钻孔时钻孔精度不高的问题,外墙安装更加方便。
Construction method for suspending outer wall surface
The invention discloses an outer wall surface suspension construction method which comprises the following construction steps that S1, an outer wall surface suspension mounting device is moved to the inner side of an outer wall, and a plate is adsorbed to a transport box of the outer wall surface suspension mounting device; s2, a lifting rod of the outer wall face suspended mounting device is rotated to be in a horizontal state, then a bearing box of the outer wall face suspended mounting device is placed at a window, and a transport box is located on the outer side of the outer wall; s3, a lifting rod is rotated to be in a vertical state, and then an electric hammer of the outer wall face suspended mounting device is started to drill the preset position of the outer wall; s4, the transport box is moved, a preset hole of the plate is aligned with a hole formed in the outer wall, and then an electric wrench of the outer wall face suspended installation device is started to fix the plate to the outer wall; s5, after installation is completed, the bearing box is moved to enable the lifting rod to be located on the inner side of the outer wall. By means of the construction method, manual drilling conducted by workers can be omitted, the problem that the drilling precision is not high during drilling is effectively solved, and outer wall installation is more convenient.
本发明公开了一种外墙面悬空施工方法,包括以下施工步骤:S1:将外墙面悬空安装装置移动到外墙的内侧,将板材吸附在外墙面悬空安装装置的运输箱上;S2:将外墙面悬空安装装置的升降杆转动至水平状态,然后将外墙面悬空安装装置的承载箱放置于窗口处,使运输箱位于外墙的外侧;S3:将升降杆转动至竖直状态,然后启动外墙面悬空安装装置的电锤对外墙预设位置进行钻孔;S4:移动运输箱,将板材的预设孔与外墙的开设孔对齐,然后启动外墙面悬空安装装置的电动扳手将板材固定于外墙上;S5:安装完成后,移动承载箱使升降杆位于外墙内侧。通过本施工方法可以省去工作人员进行手动钻孔,也有效避免了钻孔时钻孔精度不高的问题,外墙安装更加方便。
Construction method for suspending outer wall surface
外墙面悬空施工方法
NIE FEI (Autor:in) / DENG ZIWANG (Autor:in) / LIU KANG (Autor:in) / PENG ZHOU (Autor:in)
05.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Europäisches Patentamt | 2017
|SUSPENDING SCAFFOLD AND CONSTRUCTION METHOD OF SUSPENDING SCAFFOLD
Europäisches Patentamt | 2019
|OUTER WALL STRUCTURE AND OUTER WALL CONSTRUCTION METHOD
Europäisches Patentamt | 2017
|OUTER WALL CONSTRUCTION METHOD AND OUTER WALL STRUCTURE