The invention discloses a split sliding construction method and system for a truss type building. A lower truss is built on a ground foundation; in the lower truss construction process, an upper truss is assembled on a first assembly platform outside a ground foundation, the upper truss is driven by a first sliding mechanism to slide to the position above the lower truss along a first sliding way, and the upper truss and the lower truss are fixedly connected; and in the construction process of the lower truss and/or the upper truss, the roof is assembled on a second assembling platform outside the ground foundation, the roof is driven by a second sliding mechanism to slide to the position above the upper truss along the second sliding way, and the roof and the upper truss are connected and fixed. By means of the construction method and system, the lower truss, the upper truss and the roof can be assembled and built in different spaces in the same time period, the lower truss, the upper truss and the roof are connected and fixed after sliding of the synchronous sliding mechanism, and the building speed, quality and building safety are effectively improved.
本发明公开了一种桁架式建筑的分体滑移施工方法及系统,在地面基础上建造下部桁架;在下部桁架建造过程中,在地面基础外的第一组装平台组装上部桁架,通过第一滑移机构驱动上部桁架沿着第一滑道滑移至下部桁架上方,将上部桁架与下部桁架连接固定;在下部桁架和/或上部桁架建造过程中,在地面基础外的第二组装平台组装屋盖,通过第二滑移机构驱动屋盖沿着第二滑道滑移至上部桁架上方,将屋盖与上部桁架连接固定。通过这施工方法及系统,能够分别在不同的空间、同一时间段内完成下部桁架、上部桁架和屋盖的组装建造,通过同步滑移机构滑移后连接固定,有效提高建造速度、质量和建造的安全性。
Split sliding construction method and system for truss type building
The invention discloses a split sliding construction method and system for a truss type building. A lower truss is built on a ground foundation; in the lower truss construction process, an upper truss is assembled on a first assembly platform outside a ground foundation, the upper truss is driven by a first sliding mechanism to slide to the position above the lower truss along a first sliding way, and the upper truss and the lower truss are fixedly connected; and in the construction process of the lower truss and/or the upper truss, the roof is assembled on a second assembling platform outside the ground foundation, the roof is driven by a second sliding mechanism to slide to the position above the upper truss along the second sliding way, and the roof and the upper truss are connected and fixed. By means of the construction method and system, the lower truss, the upper truss and the roof can be assembled and built in different spaces in the same time period, the lower truss, the upper truss and the roof are connected and fixed after sliding of the synchronous sliding mechanism, and the building speed, quality and building safety are effectively improved.
本发明公开了一种桁架式建筑的分体滑移施工方法及系统,在地面基础上建造下部桁架;在下部桁架建造过程中,在地面基础外的第一组装平台组装上部桁架,通过第一滑移机构驱动上部桁架沿着第一滑道滑移至下部桁架上方,将上部桁架与下部桁架连接固定;在下部桁架和/或上部桁架建造过程中,在地面基础外的第二组装平台组装屋盖,通过第二滑移机构驱动屋盖沿着第二滑道滑移至上部桁架上方,将屋盖与上部桁架连接固定。通过这施工方法及系统,能够分别在不同的空间、同一时间段内完成下部桁架、上部桁架和屋盖的组装建造,通过同步滑移机构滑移后连接固定,有效提高建造速度、质量和建造的安全性。
Split sliding construction method and system for truss type building
一种桁架式建筑的分体滑移施工方法及系统
HAO YIDE (Autor:in) / GAO XIONGJIAN (Autor:in)
05.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method for high-altitude sliding type truss platform
Europäisches Patentamt | 2022
|Truss sliding leveling device and construction method
Europäisches Patentamt | 2021
|Steel structure roof truss sliding construction method
Europäisches Patentamt | 2020
|SLIDING CONSTRUCTION METHOD AND TRUSS CONSTRUCTION METHOD HAVING SAME
Europäisches Patentamt | 2023
|