Rough pavement construction method
The invention discloses a rough pavement construction method which comprises the following steps: firstly, completing the selection of stones, specifically selecting two groups of basalt from the stones, and enabling material particles to be uniform through manual screening; taking two groups of polyurethane adhesives, and setting the two groups of polyurethane adhesives as an adhesive A and an adhesive B; the construction method specifically comprises the following steps that firstly, sundries such as tree roots, grass roots and garbage in the area range to be constructed are removed; weighing the glue A and the glue B according to a certain proportion, and then fully stirring and mixing to enable the glue A and the glue B to be viscous; the concrete process is as follows: impurity removal, virtual height reservation and leveling operation of the test section construction are completed, 6-8 people are used as one group for construction, and then paving is carried out according to the test section; the rough pavement construction method has a subsequent repairing process, and the construction effect is better; two groups of stones with different particle sizes are adopted, and the adhesive is supplemented to complete paving, so that compared with an existing rough pavement construction mode, the pavement is effectively optimized.
本发明公开了一种粗糙路面施工方法,包括如下步骤:首先完成石料的选择,石料具体选用两组玄武岩,且通过人工筛选,使得材料料粒均匀;取两组聚氨酯胶黏剂,设为A胶及B胶;完成试验段的施工,其具体流程如下:首先清除待施工区域范围内的树根、草根以及垃圾等杂物;将A胶与B胶按照一定的比例进行称重,随后进行充分的搅拌混合,使得二者呈粘稠状;完成正式施工,其具体流程如下:完成上述试验段施工的除杂、预留虚高及找平操作,以6‑8人为一个小组施工,随后按照上述试验段摊铺即可;该一种粗糙路面施工方法具备后续修缮流程,施工效果更好;采用两组不同粒径的石料,辅以胶粘剂完成铺设,相较于现有的粗糙路面施工方式,得到了有效优化。
Rough pavement construction method
The invention discloses a rough pavement construction method which comprises the following steps: firstly, completing the selection of stones, specifically selecting two groups of basalt from the stones, and enabling material particles to be uniform through manual screening; taking two groups of polyurethane adhesives, and setting the two groups of polyurethane adhesives as an adhesive A and an adhesive B; the construction method specifically comprises the following steps that firstly, sundries such as tree roots, grass roots and garbage in the area range to be constructed are removed; weighing the glue A and the glue B according to a certain proportion, and then fully stirring and mixing to enable the glue A and the glue B to be viscous; the concrete process is as follows: impurity removal, virtual height reservation and leveling operation of the test section construction are completed, 6-8 people are used as one group for construction, and then paving is carried out according to the test section; the rough pavement construction method has a subsequent repairing process, and the construction effect is better; two groups of stones with different particle sizes are adopted, and the adhesive is supplemented to complete paving, so that compared with an existing rough pavement construction mode, the pavement is effectively optimized.
本发明公开了一种粗糙路面施工方法,包括如下步骤:首先完成石料的选择,石料具体选用两组玄武岩,且通过人工筛选,使得材料料粒均匀;取两组聚氨酯胶黏剂,设为A胶及B胶;完成试验段的施工,其具体流程如下:首先清除待施工区域范围内的树根、草根以及垃圾等杂物;将A胶与B胶按照一定的比例进行称重,随后进行充分的搅拌混合,使得二者呈粘稠状;完成正式施工,其具体流程如下:完成上述试验段施工的除杂、预留虚高及找平操作,以6‑8人为一个小组施工,随后按照上述试验段摊铺即可;该一种粗糙路面施工方法具备后续修缮流程,施工效果更好;采用两组不同粒径的石料,辅以胶粘剂完成铺设,相较于现有的粗糙路面施工方式,得到了有效优化。
Rough pavement construction method
一种粗糙路面施工方法
ZHANG XINGSHENG (Autor:in) / GU XIAORONG (Autor:in) / XIE ZHONGYUAN (Autor:in) / GU XIANG (Autor:in) / CHEN XIAO (Autor:in) / GUO CHAO (Autor:in)
08.12.2023
Patent
Elektronische Ressource
Chinesisch
PAVEMENT MATERIAL, PAVEMENT BODY, AND PAVEMENT BODY CONSTRUCTION METHOD
Europäisches Patentamt | 2021
|