Precise embedding method for T-shaped beam embedded part
The invention relates to the technical field of embedded parts, in particular to a T-shaped beam embedded part precise embedding method which comprises the following construction steps that 1, an embedded assembly is connected to a base; 2, a formwork is installed; 3, a reinforcement cage is installed; 4, the threaded pipe and the prefabricated steel frame are installed on the fixing plate; 5, the fixing plate is installed on the multiple formworks; 6, concrete is poured; and step 7, removing the mold. The pre-embedded assembly is positioned through the base, the threaded pipes are positioned after the fixing plate and the formwork are connected, so that the probability that the positions of the pre-embedded assembly and the threaded pipes deviate is reduced, the construction quality is improved, meanwhile, the multiple threaded pipes are fixedly installed on the prefabricated steel frame, the stability of the threaded pipes is improved, and the construction efficiency is improved. And the construction quality is further improved, the convenience during installation is also improved, and the construction efficiency is improved.
本申请涉及T型梁预埋件精准预埋方法,涉及预埋件的技术领域,包括以下施工步骤:步骤1:将预埋组件连接到基座上;步骤2:安装模板;步骤3:安装钢筋笼;步骤4:将螺纹管和预制钢架安装到固定板上;步骤5:将固定板安装到多个模板上;步骤6:浇注混凝土;步骤7:拆模。本申请通过基座对预埋组件进行定位,而固定板和模板连接后对螺纹管位置进行定位,从而降低了预埋组件和螺纹管位置发生偏移的概率,提高了施工质量,同时将多个螺纹管固定安装在预制钢架上,以此来提高了螺纹管的稳定性,进一步提高了施工质量,而且也提高了安装时的便利性,提高了施工效率。
Precise embedding method for T-shaped beam embedded part
The invention relates to the technical field of embedded parts, in particular to a T-shaped beam embedded part precise embedding method which comprises the following construction steps that 1, an embedded assembly is connected to a base; 2, a formwork is installed; 3, a reinforcement cage is installed; 4, the threaded pipe and the prefabricated steel frame are installed on the fixing plate; 5, the fixing plate is installed on the multiple formworks; 6, concrete is poured; and step 7, removing the mold. The pre-embedded assembly is positioned through the base, the threaded pipes are positioned after the fixing plate and the formwork are connected, so that the probability that the positions of the pre-embedded assembly and the threaded pipes deviate is reduced, the construction quality is improved, meanwhile, the multiple threaded pipes are fixedly installed on the prefabricated steel frame, the stability of the threaded pipes is improved, and the construction efficiency is improved. And the construction quality is further improved, the convenience during installation is also improved, and the construction efficiency is improved.
本申请涉及T型梁预埋件精准预埋方法,涉及预埋件的技术领域,包括以下施工步骤:步骤1:将预埋组件连接到基座上;步骤2:安装模板;步骤3:安装钢筋笼;步骤4:将螺纹管和预制钢架安装到固定板上;步骤5:将固定板安装到多个模板上;步骤6:浇注混凝土;步骤7:拆模。本申请通过基座对预埋组件进行定位,而固定板和模板连接后对螺纹管位置进行定位,从而降低了预埋组件和螺纹管位置发生偏移的概率,提高了施工质量,同时将多个螺纹管固定安装在预制钢架上,以此来提高了螺纹管的稳定性,进一步提高了施工质量,而且也提高了安装时的便利性,提高了施工效率。
Precise embedding method for T-shaped beam embedded part
T型梁预埋件精准预埋方法
FENG QINGWEI (Autor:in) / ZHAO SHITOU (Autor:in) / KE ZHIXUE (Autor:in) / HOU HONGQIANG (Autor:in) / LYU ZHENGLIN (Autor:in) / ZUO WENCHENG (Autor:in) / OU SHENGPENG (Autor:in) / ZHOU XUE (Autor:in) / XIANG GUANHUA (Autor:in) / LIU XIN (Autor:in)
15.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
High-pier load-bearing embedded hole embedded part and embedding method
Europäisches Patentamt | 2023
|Prefabricated building pipeline embedded part and embedding method thereof
Europäisches Patentamt | 2023
|