Asphalt pavement construction process
The invention discloses an asphalt pavement construction process, which belongs to the field of asphalt pavement construction, and comprises the following steps: S1, preparation before construction, and S2, roadbed construction. A preparation scheme is set, when unforeseen circumstances occur in the pavement construction process, pavement construction can be continued through the preparation scheme, the pavement construction progress is not affected, a roadbed acceptance stage is set, it can be guaranteed that the roadbed is qualified when put into use, and asphalt concrete detection and test detection are set in the asphalt concrete preparation stage; various properties of the asphalt concrete are detected before test construction, comprehensive detection can be performed on the asphalt concrete prepared according to the ratio in cooperation with test detection after test construction, it is guaranteed that the asphalt concrete meets the requirement after being put into use subsequently, multiple detections are performed in the core-pulling detection stage, and the detection accuracy is improved. And the paved asphalt concrete pavement is comprehensively detected, so that the asphalt concrete pavement after being put into use is ensured to meet the requirements and is not easily damaged.
本发明公开了一种沥青路面施工工艺,属于沥青路面施工领域,包括以下步骤:S1、施工前准备,S2、路基施工。设置预备方案,当进行路面施工的过程中出现意外情况时,可以利用预备的方案继续进行路面施工,不会影响到路面施工的进度,设置路基验收阶段,能够保证路基在投入使用时合格,在沥青混凝土制备阶段设置沥青混凝土检测和试验检测,在试验施工之前对沥青混凝土进行各项性能检测,配合着试验施工后的试验检测,可以对配比制备出来的沥青混凝土进行综合检测,保障后续沥青混凝土投入使用时符合要求,在抽芯检测阶段进行多项检测,对于摊铺后沥青混凝土路面进行综合检测,保证投入使用后沥青混凝土路面符合要求不会轻易毁坏。
Asphalt pavement construction process
The invention discloses an asphalt pavement construction process, which belongs to the field of asphalt pavement construction, and comprises the following steps: S1, preparation before construction, and S2, roadbed construction. A preparation scheme is set, when unforeseen circumstances occur in the pavement construction process, pavement construction can be continued through the preparation scheme, the pavement construction progress is not affected, a roadbed acceptance stage is set, it can be guaranteed that the roadbed is qualified when put into use, and asphalt concrete detection and test detection are set in the asphalt concrete preparation stage; various properties of the asphalt concrete are detected before test construction, comprehensive detection can be performed on the asphalt concrete prepared according to the ratio in cooperation with test detection after test construction, it is guaranteed that the asphalt concrete meets the requirement after being put into use subsequently, multiple detections are performed in the core-pulling detection stage, and the detection accuracy is improved. And the paved asphalt concrete pavement is comprehensively detected, so that the asphalt concrete pavement after being put into use is ensured to meet the requirements and is not easily damaged.
本发明公开了一种沥青路面施工工艺,属于沥青路面施工领域,包括以下步骤:S1、施工前准备,S2、路基施工。设置预备方案,当进行路面施工的过程中出现意外情况时,可以利用预备的方案继续进行路面施工,不会影响到路面施工的进度,设置路基验收阶段,能够保证路基在投入使用时合格,在沥青混凝土制备阶段设置沥青混凝土检测和试验检测,在试验施工之前对沥青混凝土进行各项性能检测,配合着试验施工后的试验检测,可以对配比制备出来的沥青混凝土进行综合检测,保障后续沥青混凝土投入使用时符合要求,在抽芯检测阶段进行多项检测,对于摊铺后沥青混凝土路面进行综合检测,保证投入使用后沥青混凝土路面符合要求不会轻易毁坏。
Asphalt pavement construction process
一种沥青路面施工工艺
SONG ZHANGLING (Autor:in) / ZHANG ZE (Autor:in) / BI PENGCHENG (Autor:in) / MOU YING (Autor:in) / FENG WENQIANG (Autor:in) / MA XIAOFANG (Autor:in)
19.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE