Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building facade updating construction integrated device
The invention discloses a building facade updating construction integrated device which comprises a plurality of lifting guide rails vertically extending in the vertical direction, a horizontal truss is installed on the lifting guide rails, and the horizontal truss is connected with the lifting guide rails through a lifting driving unit to form a lifting construction platform. The lifting construction platform is further provided with a sliding rail extending horizontally, the sliding rail is provided with a dismantling mechanism used for removing a facing layer of the outer vertical face of the building, and the side, close to the outer vertical face of the building, of the lifting construction platform is further provided with a collecting plate. The collecting plate is obliquely arranged, the width of the collecting plate is larger than the distance between the lifting construction platform and the building facade, and a conveying channel extending in the vertical direction is further arranged at one end of the lifting construction platform. The problems that a traditional construction platform is limited in operation space and bearing capacity and has the risk of falling objects from high altitudes are solved, and the dismounting efficiency of the building facing layer is improved.
本发明公开了一种建筑外立面更新施工一体化装置,包括多个沿竖直方向垂直延伸的升降导轨,所述升降导轨上安装有水平桁架,所述水平桁架与所述升降导轨之间通过升降驱动单元连接,以形成升降施工平台,所述升降施工平台上还设置有水平延伸的滑轨,所述滑轨上安装有用于清除建筑外立面饰面层的拆除机构,所述升降施工平台靠近建筑外立面的一侧还设置有收集板,所述收集板倾斜设置且其宽度大于所述升降施工平台与所述建筑外立面之间的间距,所述升降施工平台的一端还设置有沿竖直方向延伸的运输通道。本发明解决了传统施工平台作业空间有限、承载能力有限以及存在高空坠物风险的问题,提高了建筑饰面层的拆卸效率。
Building facade updating construction integrated device
The invention discloses a building facade updating construction integrated device which comprises a plurality of lifting guide rails vertically extending in the vertical direction, a horizontal truss is installed on the lifting guide rails, and the horizontal truss is connected with the lifting guide rails through a lifting driving unit to form a lifting construction platform. The lifting construction platform is further provided with a sliding rail extending horizontally, the sliding rail is provided with a dismantling mechanism used for removing a facing layer of the outer vertical face of the building, and the side, close to the outer vertical face of the building, of the lifting construction platform is further provided with a collecting plate. The collecting plate is obliquely arranged, the width of the collecting plate is larger than the distance between the lifting construction platform and the building facade, and a conveying channel extending in the vertical direction is further arranged at one end of the lifting construction platform. The problems that a traditional construction platform is limited in operation space and bearing capacity and has the risk of falling objects from high altitudes are solved, and the dismounting efficiency of the building facing layer is improved.
本发明公开了一种建筑外立面更新施工一体化装置,包括多个沿竖直方向垂直延伸的升降导轨,所述升降导轨上安装有水平桁架,所述水平桁架与所述升降导轨之间通过升降驱动单元连接,以形成升降施工平台,所述升降施工平台上还设置有水平延伸的滑轨,所述滑轨上安装有用于清除建筑外立面饰面层的拆除机构,所述升降施工平台靠近建筑外立面的一侧还设置有收集板,所述收集板倾斜设置且其宽度大于所述升降施工平台与所述建筑外立面之间的间距,所述升降施工平台的一端还设置有沿竖直方向延伸的运输通道。本发明解决了传统施工平台作业空间有限、承载能力有限以及存在高空坠物风险的问题,提高了建筑饰面层的拆卸效率。
Building facade updating construction integrated device
一种建筑外立面更新施工一体化装置
ZHAO ZEMING (Autor:in) / WANG XIANZHI (Autor:in) / SUN YU (Autor:in) / JIN YONGQIANG (Autor:in) / LYU WENZHI (Autor:in) / LI XIAO (Autor:in) / GAO CHANGLING (Autor:in) / WANG XUDONG (Autor:in) / FU ZENGLONG (Autor:in) / YANG YUAN (Autor:in)
22.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Facade protection device for steel structure building construction
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2015
|Facade assembly, building construction and method for mounting the facade assembly
Europäisches Patentamt | 2019
|