Night concrete floor elevation control method
The invention relates to the technical field of building construction, in particular to a night concrete floor elevation control method. Fixing plates are arranged on the wood formwork every 3-5 meters, and the fixing plates are fixed to the wood formwork through screws; supporting legs are welded to the top of the fixing plate, and a fixing barrel with the top open is welded to the tops of the supporting legs. A fluorescent column is placed in the fixed barrel, the top surface of the fluorescent column is equal to the elevation and higher than the fixed barrel, tinfoil is adhered to the top of the fluorescent column, and light at the upper part of the fluorescent column is diffused to the periphery; and concrete pouring is conducted, and elevation control is conducted through light of the fluorescent columns. The concrete pouring elevation is controlled according to emitted light, the concrete pouring elevation can be accurately controlled, constructors are liberated to control the elevation through a measuring scale, the concrete pouring thickness and flatness can be effectively guaranteed, measuring scale workers are liberated, pouring and elevation control are conducted at any time, and the construction speed is increased.
本发明涉及建筑施工技术领域,具体是一种夜间混凝土楼板标高控制方法。在木模板上每间隔3‑5米设置一个固定板,固定板通过螺钉固定在木模板上;固定板顶部焊接有支腿,支腿的顶部焊接有顶部敞口的固定桶;固定桶内放置有荧光柱,荧光柱顶面与标高相等且高于固定桶,荧光柱的顶部粘贴有锡纸,荧光柱上部的光线向外周扩散;进行混凝土浇筑,通过荧光柱的光线进行标高控制。混凝土浇筑根据散发的光线控制标高,能精准控制混凝土浇筑标高,解放施工人员量尺控制标高,又能有效保证混凝土浇筑厚度及平整度,解放量尺工人,随时浇筑随时控制标高,提高施工速度。
Night concrete floor elevation control method
The invention relates to the technical field of building construction, in particular to a night concrete floor elevation control method. Fixing plates are arranged on the wood formwork every 3-5 meters, and the fixing plates are fixed to the wood formwork through screws; supporting legs are welded to the top of the fixing plate, and a fixing barrel with the top open is welded to the tops of the supporting legs. A fluorescent column is placed in the fixed barrel, the top surface of the fluorescent column is equal to the elevation and higher than the fixed barrel, tinfoil is adhered to the top of the fluorescent column, and light at the upper part of the fluorescent column is diffused to the periphery; and concrete pouring is conducted, and elevation control is conducted through light of the fluorescent columns. The concrete pouring elevation is controlled according to emitted light, the concrete pouring elevation can be accurately controlled, constructors are liberated to control the elevation through a measuring scale, the concrete pouring thickness and flatness can be effectively guaranteed, measuring scale workers are liberated, pouring and elevation control are conducted at any time, and the construction speed is increased.
本发明涉及建筑施工技术领域,具体是一种夜间混凝土楼板标高控制方法。在木模板上每间隔3‑5米设置一个固定板,固定板通过螺钉固定在木模板上;固定板顶部焊接有支腿,支腿的顶部焊接有顶部敞口的固定桶;固定桶内放置有荧光柱,荧光柱顶面与标高相等且高于固定桶,荧光柱的顶部粘贴有锡纸,荧光柱上部的光线向外周扩散;进行混凝土浇筑,通过荧光柱的光线进行标高控制。混凝土浇筑根据散发的光线控制标高,能精准控制混凝土浇筑标高,解放施工人员量尺控制标高,又能有效保证混凝土浇筑厚度及平整度,解放量尺工人,随时浇筑随时控制标高,提高施工速度。
Night concrete floor elevation control method
夜间混凝土楼板标高控制方法
GAO CHAO (Autor:in) / MA ZEZE (Autor:in) / BU SHUAI (Autor:in) / WANG XIAOCHUAN (Autor:in)
22.12.2023
Patent
Elektronische Ressource
Chinesisch
Suspended steel structure floor elevation active control method
Europäisches Patentamt | 2023
|