Night concrete floor elevation control method
The invention discloses a night concrete floor elevation control method which comprises the following steps: S1, positioning and paying off; s2, an axis projection measurement control method; s3, height measurement; s4, observing the perpendicularity; s5, settlement observation; and S6, performing engineering measurement control measures. The engineering is carried out in advance through a template, the engineering must be actually measured during construction, and the engineering cannot enter the next process for construction if the engineering is not inspected to be qualified in the previous process. The project is ensured to be qualified, and the construction quality is ensured. And the surveying personnel accurately measures the paying-off positioning of the project, and draws a construction paying-off diagram and paying-off records. Measurement personnel should take various measures in operation, measurement precision is guaranteed, standardization, normalization and programming are achieved, and engineering services are better provided.
本发明公开了一种夜间混凝土楼板标高控制方法,包括以下步骤,S1、定位放线;S2、轴线投测控制方法;S3、高程测量;S4、垂直度观测;S5、沉降观测;S6、工程测量控制措施。工程实行样板先行,施工当中必须对工程进行实测实量,未经上道工序检验合格不得进入下道工序施工。本工程将确保合格,确保施工质量。测量人员精确测量本工程的放线定位,并绘制施工放线图和放线记录。测量人员应在作业中采取各种措施,保证测量精度,做到标准化、规范化、程序化,更好地为工程服务。
Night concrete floor elevation control method
The invention discloses a night concrete floor elevation control method which comprises the following steps: S1, positioning and paying off; s2, an axis projection measurement control method; s3, height measurement; s4, observing the perpendicularity; s5, settlement observation; and S6, performing engineering measurement control measures. The engineering is carried out in advance through a template, the engineering must be actually measured during construction, and the engineering cannot enter the next process for construction if the engineering is not inspected to be qualified in the previous process. The project is ensured to be qualified, and the construction quality is ensured. And the surveying personnel accurately measures the paying-off positioning of the project, and draws a construction paying-off diagram and paying-off records. Measurement personnel should take various measures in operation, measurement precision is guaranteed, standardization, normalization and programming are achieved, and engineering services are better provided.
本发明公开了一种夜间混凝土楼板标高控制方法,包括以下步骤,S1、定位放线;S2、轴线投测控制方法;S3、高程测量;S4、垂直度观测;S5、沉降观测;S6、工程测量控制措施。工程实行样板先行,施工当中必须对工程进行实测实量,未经上道工序检验合格不得进入下道工序施工。本工程将确保合格,确保施工质量。测量人员精确测量本工程的放线定位,并绘制施工放线图和放线记录。测量人员应在作业中采取各种措施,保证测量精度,做到标准化、规范化、程序化,更好地为工程服务。
Night concrete floor elevation control method
一种夜间混凝土楼板标高控制方法
ZHAO XI (Autor:in) / WEI HUALONG (Autor:in) / CHEN SHIHAO (Autor:in)
29.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
E02D
FOUNDATIONS
,
Gründungen
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Suspended steel structure floor elevation active control method
Europäisches Patentamt | 2023
|