Construction process for large steel structure factory building
The invention provides a construction process for a large-scale steel structure plant. The construction process comprises the following steps: installing steel columns and wind-resistant columns, installing side supporting beams, combining and installing main beams, combining and installing wall beams and purlines, installing supporting strips, selecting cushion layer concrete pre-buried in the ground, first connecting grooves and bolt holes in all structural components, and hoisting the combined plant in sequence. By the adoption of the technical scheme, all structural components of the large factory building are assembled in advance, fixed through bolts and welding and then hoisted to be spliced and fixed, the construction speed is greatly increased, the construction quality is guaranteed, the width of an entrance of a factory building door is increased by additionally arranging the movable telescopic wind-resistant columns, and the construction efficiency is improved. The damping device is installed on the supporting strip, damping can be achieved, the length of the supporting strip can be conveniently adjusted during construction, and the tightness of the supporting strip can be conveniently adjusted.
本发明提供一种大型钢结构厂房施工工艺,包括安装钢柱和抗风柱、安装侧撑梁、组合安装主梁、组合安装墙梁和檩条和安装支撑条,选取地面预埋的垫层砼、第一连接槽、各个结构部件上的螺栓孔,按照顺序吊装组合厂房。采用本发明的技术方案,将大型厂房的各个结构组件,提前组装进行螺栓和焊接固定,再吊装进行拼接固定,大大提高了施工的速度,保证了施工的质量,并通过增设可移动伸缩的抗风柱,增大了厂房门入口的宽度,通过在支撑条上安装减震装置,不仅可减震,还可在施工时方便调节支撑条的长短,以便调节支撑条的松紧。
Construction process for large steel structure factory building
The invention provides a construction process for a large-scale steel structure plant. The construction process comprises the following steps: installing steel columns and wind-resistant columns, installing side supporting beams, combining and installing main beams, combining and installing wall beams and purlines, installing supporting strips, selecting cushion layer concrete pre-buried in the ground, first connecting grooves and bolt holes in all structural components, and hoisting the combined plant in sequence. By the adoption of the technical scheme, all structural components of the large factory building are assembled in advance, fixed through bolts and welding and then hoisted to be spliced and fixed, the construction speed is greatly increased, the construction quality is guaranteed, the width of an entrance of a factory building door is increased by additionally arranging the movable telescopic wind-resistant columns, and the construction efficiency is improved. The damping device is installed on the supporting strip, damping can be achieved, the length of the supporting strip can be conveniently adjusted during construction, and the tightness of the supporting strip can be conveniently adjusted.
本发明提供一种大型钢结构厂房施工工艺,包括安装钢柱和抗风柱、安装侧撑梁、组合安装主梁、组合安装墙梁和檩条和安装支撑条,选取地面预埋的垫层砼、第一连接槽、各个结构部件上的螺栓孔,按照顺序吊装组合厂房。采用本发明的技术方案,将大型厂房的各个结构组件,提前组装进行螺栓和焊接固定,再吊装进行拼接固定,大大提高了施工的速度,保证了施工的质量,并通过增设可移动伸缩的抗风柱,增大了厂房门入口的宽度,通过在支撑条上安装减震装置,不仅可减震,还可在施工时方便调节支撑条的长短,以便调节支撑条的松紧。
Construction process for large steel structure factory building
一种大型钢结构厂房施工工艺
SONG SHIJIE (Autor:in) / WANG SHUAIWEI (Autor:in) / YANG XIAOLI (Autor:in) / PANG HUIBIAO (Autor:in) / ZHAO JIANBIN (Autor:in)
22.12.2023
Patent
Elektronische Ressource
Chinesisch
Construction process of large steel structure factory building
Europäisches Patentamt | 2023
|Steel structure factory building construction structure
Europäisches Patentamt | 2022
|Lightweight steel structure factory building and construction process thereof
Europäisches Patentamt | 2023
|Large-span steel structure factory building main body engineering construction method
Europäisches Patentamt | 2023
|Construction method of heightened steel structure factory building
Europäisches Patentamt | 2024
|