Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of prefabricated cement culvert pipe for power supply
The invention relates to a construction method of a prefabricated cement culvert pipe for power supply, and belongs to the field of electric power infrastructure construction. The technical problems that an existing power supply cement culvert pipe adopts a traditional on-site concrete cast-in-place construction method, the construction efficiency is low, the process connection time of all the steps is long, and construction safety and construction quality are difficult to guarantee are solved. According to the technical scheme, the construction method for prefabricating the cement culvert pipe comprises the steps that firstly, a formwork is assembled, concrete is poured, and a pedestal is constructed; 2, binding cement culvert pipe core steel bars; thirdly, a pipe core of the cement culvert pipe is manufactured; fourthly, a cement culvert pipe is manufactured; step 5, pre-chiseling treatment; sixthly, hoisting construction is conducted; seventhly, waterproof construction and chiseling detection are conducted; and 8, layered symmetrical backfilling is conducted, and construction is completed. And compared with on-site pouring construction, the construction steps are saved, the construction difficulty is reduced, and the construction efficiency is improved. The method is used for construction of the prefabricated cement culvert pipe for power supply.
本发明涉及一种用于供电的预制水泥涵管的施工方法,属于电力基础设施施工领域。本发明解决了现有供电水泥涵管采用传统现场混凝土现浇施工方法存在施工效率低,各个步骤工艺衔接时间长,难以保证施工安全和施工质量的技术问题。本发明的技术方案是一种预制水泥涵管的施工方法,包括步骤一,组装模板,浇筑混凝土,台座施工;步骤二,绑扎水泥涵管管芯钢筋;步骤三,制作水泥涵管的管芯;步骤四,制作水泥涵管;步骤五,预凿毛处理;步骤六,吊装施工;步骤七,防水施工、凿毛检测;步骤八,分层对称回填,完成施工。相比与现场的浇筑施工节省施工步骤,降低施工难度,提高施工效率。本发明用于供电的预制水泥涵管的施工。
Construction method of prefabricated cement culvert pipe for power supply
The invention relates to a construction method of a prefabricated cement culvert pipe for power supply, and belongs to the field of electric power infrastructure construction. The technical problems that an existing power supply cement culvert pipe adopts a traditional on-site concrete cast-in-place construction method, the construction efficiency is low, the process connection time of all the steps is long, and construction safety and construction quality are difficult to guarantee are solved. According to the technical scheme, the construction method for prefabricating the cement culvert pipe comprises the steps that firstly, a formwork is assembled, concrete is poured, and a pedestal is constructed; 2, binding cement culvert pipe core steel bars; thirdly, a pipe core of the cement culvert pipe is manufactured; fourthly, a cement culvert pipe is manufactured; step 5, pre-chiseling treatment; sixthly, hoisting construction is conducted; seventhly, waterproof construction and chiseling detection are conducted; and 8, layered symmetrical backfilling is conducted, and construction is completed. And compared with on-site pouring construction, the construction steps are saved, the construction difficulty is reduced, and the construction efficiency is improved. The method is used for construction of the prefabricated cement culvert pipe for power supply.
本发明涉及一种用于供电的预制水泥涵管的施工方法,属于电力基础设施施工领域。本发明解决了现有供电水泥涵管采用传统现场混凝土现浇施工方法存在施工效率低,各个步骤工艺衔接时间长,难以保证施工安全和施工质量的技术问题。本发明的技术方案是一种预制水泥涵管的施工方法,包括步骤一,组装模板,浇筑混凝土,台座施工;步骤二,绑扎水泥涵管管芯钢筋;步骤三,制作水泥涵管的管芯;步骤四,制作水泥涵管;步骤五,预凿毛处理;步骤六,吊装施工;步骤七,防水施工、凿毛检测;步骤八,分层对称回填,完成施工。相比与现场的浇筑施工节省施工步骤,降低施工难度,提高施工效率。本发明用于供电的预制水泥涵管的施工。
Construction method of prefabricated cement culvert pipe for power supply
一种用于供电的预制水泥涵管的施工方法
FU QIANG (Autor:in) / DU JINCAI (Autor:in) / ZHAO JIANPING (Autor:in) / WU ZHIYONG (Autor:in) / LI WENWEI (Autor:in) / QIN LIJUN (Autor:in) / WANG ZUNYOU (Autor:in) / WEI BIN (Autor:in) / LI SHIWEI (Autor:in) / SUN JIANYU (Autor:in)
29.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
F16L
PIPES
,
Rohre
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Construction and installation equipment for highway prefabricated culvert pipe
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|