Reusable operation immersed tube tunnel foundation settlement disposal device and construction method
The invention relates to the technical field of immersed tunnels, in particular to a reusable operation immersed tunnel foundation settlement disposal device and a construction method.The reusable operation immersed tunnel foundation settlement disposal device comprises orifice pipes, slurry conveying pipes, check valves and grouting pipes, grouting holes are formed in a row in the longitudinal direction of a pipe joint at intervals of 10 m, the orifice pipes are arranged on a bottom plate after part of pressure bin concrete is chiseled away, and the grouting holes are formed in the bottom plate after part of pressure bin concrete is chiseled away; the orifice pipe is arranged above the pipe joint bottom steel plate by 200 mm, the orifice pipe is provided with a stirrup with the diameter of 8 mm, and hemp threads are wound on the pipe section below the stirrup. According to the method, a large grouting platform does not need to be erected beside a tunnel water area, and the influence on the surrounding environment and the channel is reduced; the grouting holes can be repeatedly used, so that the differential settlement disease prevention and control of the immersed tunnel foundation are facilitated; totally-closed construction is not needed, and the traffic influence is small; the precision of grouting construction is high, and improvement of the disease treatment efficiency is facilitated; the construction technology is simple, operation is convenient, labor cost is low, manufacturing cost is low, and the service life of the tunnel can be effectively prolonged.
本发明涉及沉管隧道技术领域,具体为可重复使用的运营沉管隧道基础沉降处置装置及施工方法,包括孔口管、输浆管、止回阀及注浆管四部分,其中,注浆孔沿管节纵向每间隔10m布置一排,所述孔口管在凿除部分压仓混凝土后在底板打设,所述孔口管打设至管节底钢板以上200mm,所述孔口管设有直径8mm箍筋,所述箍筋以下管段缠绕有麻丝。本发明,无需在隧道水域旁搭设大型注浆平台,减少了对周边环境及航道的影响;注浆孔可重复利用,有利于沉管隧道基础不均匀沉降病害防治;不需要全封闭施工,交通影响小;注浆施工的精度高,有利于提升病害整治效率;施工工艺简单,操作便捷,人工成本低,造价少,可有效延长隧道使用寿命。
Reusable operation immersed tube tunnel foundation settlement disposal device and construction method
The invention relates to the technical field of immersed tunnels, in particular to a reusable operation immersed tunnel foundation settlement disposal device and a construction method.The reusable operation immersed tunnel foundation settlement disposal device comprises orifice pipes, slurry conveying pipes, check valves and grouting pipes, grouting holes are formed in a row in the longitudinal direction of a pipe joint at intervals of 10 m, the orifice pipes are arranged on a bottom plate after part of pressure bin concrete is chiseled away, and the grouting holes are formed in the bottom plate after part of pressure bin concrete is chiseled away; the orifice pipe is arranged above the pipe joint bottom steel plate by 200 mm, the orifice pipe is provided with a stirrup with the diameter of 8 mm, and hemp threads are wound on the pipe section below the stirrup. According to the method, a large grouting platform does not need to be erected beside a tunnel water area, and the influence on the surrounding environment and the channel is reduced; the grouting holes can be repeatedly used, so that the differential settlement disease prevention and control of the immersed tunnel foundation are facilitated; totally-closed construction is not needed, and the traffic influence is small; the precision of grouting construction is high, and improvement of the disease treatment efficiency is facilitated; the construction technology is simple, operation is convenient, labor cost is low, manufacturing cost is low, and the service life of the tunnel can be effectively prolonged.
本发明涉及沉管隧道技术领域,具体为可重复使用的运营沉管隧道基础沉降处置装置及施工方法,包括孔口管、输浆管、止回阀及注浆管四部分,其中,注浆孔沿管节纵向每间隔10m布置一排,所述孔口管在凿除部分压仓混凝土后在底板打设,所述孔口管打设至管节底钢板以上200mm,所述孔口管设有直径8mm箍筋,所述箍筋以下管段缠绕有麻丝。本发明,无需在隧道水域旁搭设大型注浆平台,减少了对周边环境及航道的影响;注浆孔可重复利用,有利于沉管隧道基础不均匀沉降病害防治;不需要全封闭施工,交通影响小;注浆施工的精度高,有利于提升病害整治效率;施工工艺简单,操作便捷,人工成本低,造价少,可有效延长隧道使用寿命。
Reusable operation immersed tube tunnel foundation settlement disposal device and construction method
可重复使用的运营沉管隧道基础沉降处置装置及施工方法
HU BIN (Autor:in) / XING YONGHUI (Autor:in) / LYU JIANYING (Autor:in) / JIANG BAOCHEN (Autor:in) / SUN CHAO (Autor:in) / LUO CHENGZHENG (Autor:in) / WEI YUXING (Autor:in) / REN TIANYU (Autor:in) / GUO QING (Autor:in) / XIAO PINGPING (Autor:in)
29.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Settlement prediction on an operational immersed tube tunnel
British Library Conference Proceedings | 2002
|Europäisches Patentamt | 2023
|Combined immersed tube joint for immersed tube tunnel and construction method
Europäisches Patentamt | 2023
|Construction method of immersed tube joint in immersed tube tunnel and immersed tube joint structure
Europäisches Patentamt | 2021
|