Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Formwork support of bridge pier concrete filled steel tubular column
The invention relates to the technical field of bridge pier formwork supports, and discloses a formwork support of a bridge pier concrete-filled steel tube column, the formwork support comprises supporting rods, positioning frames and mounting bases, the multiple positioning frames are arranged at intervals in the height direction of the bridge pier concrete-filled steel tube column, and the supporting rods are arranged at intervals in the circumferential direction of the periphery of a steel tube; the supporting rod is connected to the installation base in an inserted mode, a connecting rod is detachably installed between the positioning frame and the supporting rod, and a fixing piece used for fixing a template is installed on the positioning frame. The formwork support is installed before the formwork is installed, and the formwork can be directly fixed to the formwork support.
本申请涉及桥墩模板支架的技术领域,公开了一种桥墩钢管混凝土柱的模板支架,包括支撑杆、定位框和安装座,所述定位框沿桥墩钢管混凝土柱的高度间隔设置有多个,所述支撑杆沿钢管的外周周向间隔设置,所述支撑杆插接于所述安装座上,所述定位框和所述支撑杆上之间可拆卸安装有连杆,所述定位框上安装有用于固定模板的固定件。本申请在安装模板前先安装模板支架,模板可以直接固定在模板支架上。
Formwork support of bridge pier concrete filled steel tubular column
The invention relates to the technical field of bridge pier formwork supports, and discloses a formwork support of a bridge pier concrete-filled steel tube column, the formwork support comprises supporting rods, positioning frames and mounting bases, the multiple positioning frames are arranged at intervals in the height direction of the bridge pier concrete-filled steel tube column, and the supporting rods are arranged at intervals in the circumferential direction of the periphery of a steel tube; the supporting rod is connected to the installation base in an inserted mode, a connecting rod is detachably installed between the positioning frame and the supporting rod, and a fixing piece used for fixing a template is installed on the positioning frame. The formwork support is installed before the formwork is installed, and the formwork can be directly fixed to the formwork support.
本申请涉及桥墩模板支架的技术领域,公开了一种桥墩钢管混凝土柱的模板支架,包括支撑杆、定位框和安装座,所述定位框沿桥墩钢管混凝土柱的高度间隔设置有多个,所述支撑杆沿钢管的外周周向间隔设置,所述支撑杆插接于所述安装座上,所述定位框和所述支撑杆上之间可拆卸安装有连杆,所述定位框上安装有用于固定模板的固定件。本申请在安装模板前先安装模板支架,模板可以直接固定在模板支架上。
Formwork support of bridge pier concrete filled steel tubular column
一种桥墩钢管混凝土柱的模板支架
WU YIXIAN (Autor:in) / CHEN KANGMING (Autor:in) / QIU CHENG (Autor:in) / LIU GANLANG (Autor:in) / LIU SHENG (Autor:in)
05.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Steel-UHPC combined formwork core-filled concrete pier column and construction method thereof
Europäisches Patentamt | 2024
|Pier column fair-faced concrete construction method, pier column and steel formwork structure
Europäisches Patentamt | 2024
|