Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated bottom-sealing-free steel-concrete combined hanging box structure and assembling method
The invention discloses an assembly type steel-concrete combined hanging box structure without a back cover and an assembly method, and relates to the technical field of bridge building construction.The assembly type steel-concrete combined hanging box structure comprises a pile foundation, and a connecting and fixing framework is welded to the top of the pile foundation. Under the cooperation of the elastic spring columns and the movable connecting pieces, the whole structure can be driven to be adjusted and stabilized along with water wave power of rising tide and falling tide, it is guaranteed that buoyancy borne by the whole structure is the same as resultant force of cohesive force between the structures, assembly type installation is formed by the connection mode of the steel-concrete hanging box frame and the bottom plate on the whole structure, rapid assembly and disassembly are convenient, and the service life of the steel-concrete hanging box frame is prolonged. Non-bottom-sealing construction is achieved, the construction cost is effectively saved, the construction period is shortened, the construction period of a single bearing platform is predicted to be shortened by about day, the construction cost is reduced by about 10%, meanwhile, the overall structure can enhance the overall anti-floating and anti-sinking capacity of the steel-concrete combined hanging box, and quality safety accidents are prevented.
本发明公开了一种装配式无封底钢混组合吊箱结构及装配方法,涉及桥梁建筑施工技术领域,包括桩基,桩基的顶部焊接安装有衔接固定架构,通过在第一钢架构组件和第二钢架构组件配合下,当涨潮时,可以在弹性簧柱和活动衔接件配合下,带动整体结构随涨潮、落潮的水波动力进行调节稳固,保障整体结构所受到的浮力和结构间粘聚力的合力相同,且使得在整体结构上让钢混吊箱架与底板的连接方式形成装配式安装,便于快速安拆,实现无封底施工,有效的节约施工成本,节省施工周期,单个承台施工周期预计缩短约天,降低施工成本约10%,同时整体结构,可增强钢混组合吊箱整体抗浮、抗下沉能力,预防质量安全事故的发生。
Fabricated bottom-sealing-free steel-concrete combined hanging box structure and assembling method
The invention discloses an assembly type steel-concrete combined hanging box structure without a back cover and an assembly method, and relates to the technical field of bridge building construction.The assembly type steel-concrete combined hanging box structure comprises a pile foundation, and a connecting and fixing framework is welded to the top of the pile foundation. Under the cooperation of the elastic spring columns and the movable connecting pieces, the whole structure can be driven to be adjusted and stabilized along with water wave power of rising tide and falling tide, it is guaranteed that buoyancy borne by the whole structure is the same as resultant force of cohesive force between the structures, assembly type installation is formed by the connection mode of the steel-concrete hanging box frame and the bottom plate on the whole structure, rapid assembly and disassembly are convenient, and the service life of the steel-concrete hanging box frame is prolonged. Non-bottom-sealing construction is achieved, the construction cost is effectively saved, the construction period is shortened, the construction period of a single bearing platform is predicted to be shortened by about day, the construction cost is reduced by about 10%, meanwhile, the overall structure can enhance the overall anti-floating and anti-sinking capacity of the steel-concrete combined hanging box, and quality safety accidents are prevented.
本发明公开了一种装配式无封底钢混组合吊箱结构及装配方法,涉及桥梁建筑施工技术领域,包括桩基,桩基的顶部焊接安装有衔接固定架构,通过在第一钢架构组件和第二钢架构组件配合下,当涨潮时,可以在弹性簧柱和活动衔接件配合下,带动整体结构随涨潮、落潮的水波动力进行调节稳固,保障整体结构所受到的浮力和结构间粘聚力的合力相同,且使得在整体结构上让钢混吊箱架与底板的连接方式形成装配式安装,便于快速安拆,实现无封底施工,有效的节约施工成本,节省施工周期,单个承台施工周期预计缩短约天,降低施工成本约10%,同时整体结构,可增强钢混组合吊箱整体抗浮、抗下沉能力,预防质量安全事故的发生。
Fabricated bottom-sealing-free steel-concrete combined hanging box structure and assembling method
一种装配式无封底钢混组合吊箱结构及装配方法
ZHUANG ZHIZHENG (Autor:in) / WANG WENQING (Autor:in) / WEI ZHIHAO (Autor:in)
05.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2024
|Construction method of reusable steel hanging box without bottom sealing concrete
Europäisches Patentamt | 2022
|Fabricated steel-concrete combined hanging box lowering and positioning system
Europäisches Patentamt | 2024
|Large steel cofferdam bottom sealing hanging system and using method thereof
Europäisches Patentamt | 2021
|Bottom-sealing-free quickly-assembled hanging box cofferdam and mounting method
Europäisches Patentamt | 2023
|