Construction structure and method for reinforcing manhole cover of inspection well
The construction structure comprises a shaft, a reinforcing check ring, a plastic plate, a reinforcing plate, an asphalt surface layer, a steel fiber concrete layer, a six-prevention well lid, epoxy mortar, annular steel bars, embedded bars and a concrete base layer, the plastic plate is laid at the upper end of the shaft, and the upper portion of the shaft and the circumferential portion of the plastic plate are sleeved with the reinforcing check ring; a reinforcing plate is arranged between the upper end of the plastic plate and the concrete base layer, an asphalt surface layer is laid at the upper end of the reinforcing plate and the upper end of the concrete base layer, a steel fiber concrete layer is arranged on the inner side of the upper portion of the reinforcing plate, a layer of epoxy mortar is laid on the steel fiber concrete layer, and the six-prevention well lid covers the epoxy mortar. The six-prevention well lid has the beneficial effects that the periphery of the six-prevention well lid is flat, the effect of firmly bonding the base of the six-prevention well lid and the steel fiber concrete layer is achieved through the epoxy mortar, the stress distribution of the base of the six-prevention well lid is more uniform, the strength is higher, the six-prevention well lid of the inspection well is reinforced, and bumping caused by passing of vehicles is prevented.
本发明公开了一种检查井井盖加固的施工结构及施工方法,包括井筒、加强挡圈、塑料板、加强板、沥青面层、钢纤维混凝土层、六防井盖、环氧砂浆、环向钢筋、预埋筋和混凝土基层,井筒的上端铺装塑料板,加强挡圈套装在井筒上部和塑料板圆周部,塑料板的上端与混凝土基层之间设置有加强板,加强板和混凝土基层的上端铺装有沥青面层,加强板上部内侧设置有钢纤维混凝土层,钢纤维混凝土层上铺装一层环氧砂浆,六防井盖盖在环氧砂浆上部。本发明有益效果:本发明六防井盖周围平整,使用环氧砂浆达到将六防井盖的基座与钢纤维混凝土层牢牢粘结的效果,使得六防井盖的基座应力分布更均匀、强度更高,加固检查井的六防井盖,防止车辆经过出现颠簸。
Construction structure and method for reinforcing manhole cover of inspection well
The construction structure comprises a shaft, a reinforcing check ring, a plastic plate, a reinforcing plate, an asphalt surface layer, a steel fiber concrete layer, a six-prevention well lid, epoxy mortar, annular steel bars, embedded bars and a concrete base layer, the plastic plate is laid at the upper end of the shaft, and the upper portion of the shaft and the circumferential portion of the plastic plate are sleeved with the reinforcing check ring; a reinforcing plate is arranged between the upper end of the plastic plate and the concrete base layer, an asphalt surface layer is laid at the upper end of the reinforcing plate and the upper end of the concrete base layer, a steel fiber concrete layer is arranged on the inner side of the upper portion of the reinforcing plate, a layer of epoxy mortar is laid on the steel fiber concrete layer, and the six-prevention well lid covers the epoxy mortar. The six-prevention well lid has the beneficial effects that the periphery of the six-prevention well lid is flat, the effect of firmly bonding the base of the six-prevention well lid and the steel fiber concrete layer is achieved through the epoxy mortar, the stress distribution of the base of the six-prevention well lid is more uniform, the strength is higher, the six-prevention well lid of the inspection well is reinforced, and bumping caused by passing of vehicles is prevented.
本发明公开了一种检查井井盖加固的施工结构及施工方法,包括井筒、加强挡圈、塑料板、加强板、沥青面层、钢纤维混凝土层、六防井盖、环氧砂浆、环向钢筋、预埋筋和混凝土基层,井筒的上端铺装塑料板,加强挡圈套装在井筒上部和塑料板圆周部,塑料板的上端与混凝土基层之间设置有加强板,加强板和混凝土基层的上端铺装有沥青面层,加强板上部内侧设置有钢纤维混凝土层,钢纤维混凝土层上铺装一层环氧砂浆,六防井盖盖在环氧砂浆上部。本发明有益效果:本发明六防井盖周围平整,使用环氧砂浆达到将六防井盖的基座与钢纤维混凝土层牢牢粘结的效果,使得六防井盖的基座应力分布更均匀、强度更高,加固检查井的六防井盖,防止车辆经过出现颠簸。
Construction structure and method for reinforcing manhole cover of inspection well
一种检查井井盖加固的施工结构及方法
LI BIJUN (Autor:in) / SUN LEI (Autor:in) / SHEN HONGZHENG (Autor:in) / WU FANGJIE (Autor:in) / TIAN HAO (Autor:in) / LI JIAPENG (Autor:in) / ZHANG CHAOJUN (Autor:in)
05.01.2024
Patent
Elektronische Ressource
Chinesisch
Construction method for manhole cover of inspection well in urban road
Europäisches Patentamt | 2024
|REINFORCING METHOD AND REINFORCING STRUCTURE FOR MANHOLE
Europäisches Patentamt | 2019
|Road inspection well periphery reinforcing construction method and reinforcing structure
Europäisches Patentamt | 2024
|