Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building construction water supply and drainage project construction device and construction method
The invention discloses a building construction water supply and drainage engineering construction device and a construction method, and belongs to the technical field of water supply and drainage construction.The key point of the technical scheme is that the building construction water supply and drainage engineering construction device comprises an advancing device and a clamping device, the advancing device is connected with a lifting assembly driving the clamping device to ascend and descend, and the clamping device comprises a driving part, a clamping assembly and a linkage assembly; the driving part and the clamping assemblies are connected with the lifting assembly, the clamping assemblies are connected with the driving part, every two adjacent clamping assemblies are connected with one linkage assembly, synchronous movement of the at least two clamping assemblies is achieved, the clamping assembly closest to an installed pipeline is connected with a positioning device for positioning the position of the installed pipeline, and the clamping assemblies are connected with the lifting assembly. And a control device for driving the positioning device to be close to the pipeline is arranged between the positioning device and the clamping assembly, the control device is connected with the clamping assembly, the control device is connected with a pushing device for pushing the to-be-installed pipeline to move, and the effect of improving the laying efficiency of the pipeline is achieved.
本申请公开了一种建筑建造给排水工程施工装置及施工方法,属于给排水施工技术领域,其技术方案要点是包括前进装置和夹持装置,前进装置连接有带动夹持装置升降的升降组件,夹持装置包括驱动件、夹持组件和联动组件,驱动件、夹持组件均与升降组件连接,夹持组件与驱动件连接,夹持组件设置有至少两组,每相邻两组夹持组件均与一个联动组件连接,实现至少两个夹持组件同步运动,最靠近已安装管道的夹持组件连接有定位已安装管道位置的定位装置,定位装置与夹持组件之间设置有带动定位装置靠近管道的控制装置,控制装置与夹持组件连接,控制装置连接有推动待安装管道移动的推动装置,达到提高管道的铺设效率的效果。
Building construction water supply and drainage project construction device and construction method
The invention discloses a building construction water supply and drainage engineering construction device and a construction method, and belongs to the technical field of water supply and drainage construction.The key point of the technical scheme is that the building construction water supply and drainage engineering construction device comprises an advancing device and a clamping device, the advancing device is connected with a lifting assembly driving the clamping device to ascend and descend, and the clamping device comprises a driving part, a clamping assembly and a linkage assembly; the driving part and the clamping assemblies are connected with the lifting assembly, the clamping assemblies are connected with the driving part, every two adjacent clamping assemblies are connected with one linkage assembly, synchronous movement of the at least two clamping assemblies is achieved, the clamping assembly closest to an installed pipeline is connected with a positioning device for positioning the position of the installed pipeline, and the clamping assemblies are connected with the lifting assembly. And a control device for driving the positioning device to be close to the pipeline is arranged between the positioning device and the clamping assembly, the control device is connected with the clamping assembly, the control device is connected with a pushing device for pushing the to-be-installed pipeline to move, and the effect of improving the laying efficiency of the pipeline is achieved.
本申请公开了一种建筑建造给排水工程施工装置及施工方法,属于给排水施工技术领域,其技术方案要点是包括前进装置和夹持装置,前进装置连接有带动夹持装置升降的升降组件,夹持装置包括驱动件、夹持组件和联动组件,驱动件、夹持组件均与升降组件连接,夹持组件与驱动件连接,夹持组件设置有至少两组,每相邻两组夹持组件均与一个联动组件连接,实现至少两个夹持组件同步运动,最靠近已安装管道的夹持组件连接有定位已安装管道位置的定位装置,定位装置与夹持组件之间设置有带动定位装置靠近管道的控制装置,控制装置与夹持组件连接,控制装置连接有推动待安装管道移动的推动装置,达到提高管道的铺设效率的效果。
Building construction water supply and drainage project construction device and construction method
一种建筑建造给排水工程施工装置及施工方法
ZHANG YU (Autor:in) / WEN WENZHAO (Autor:in) / CAO GUANG (Autor:in) / SONG WEIFENG (Autor:in) / LI ZEJUN (Autor:in) / MA JING (Autor:in) / GU FEI (Autor:in)
05.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
/
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
Building construction water supply and drainage project construction method
Europäisches Patentamt | 2023
|Building water supply and drainage project construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|Building construction water supply and drainage engineering construction method
Europäisches Patentamt | 2020
|Construction device and construction process for building water supply and drainage engineering
Europäisches Patentamt | 2024
|