Bailey truss and construction method for hoisting and dismantling Bailey truss
The invention relates to the technical field of building construction, in particular to a bailey truss and a construction method for hoisting and dismantling the bailey truss, the bailey truss comprises an upper supporting part, a lower supporting part and a vertical rod assembly, the lower supporting part is arranged below the upper supporting part, and the vertical rod assembly is vertically arranged between the upper supporting part and the lower supporting part; the upper portion of the vertical rod assembly can be detachably connected with the upper supporting part, and the lower portion of the vertical rod assembly can be detachably connected with the lower supporting part. According to the embodiment of the invention, the transportation condition of a construction site is fully considered, the bailey truss is divided into a plurality of components such as the upper supporting part, the lower supporting part and the vertical rod assembly, the on-site assembly of each component is realized, the space occupied by transportation is reduced, and the difficulty that the bailey truss is large in size and inconvenient to use is obviously solved; and the dismounting and transportation cost can be effectively reduced, and the remarkable application and popularization value is achieved.
本发明涉及建筑施工的技术领域,具体涉及一种贝雷架以及贝雷架吊装拆除的施工方法,贝雷架包括上支承部、下支承部以及立杆组件,其中,下支承部设在上支承部的下方,立杆组件竖向地设在上支承部和下支承部之间,立杆组件的上部能够与上支承部可拆卸连接,立杆组件的下部能够与下支承部可拆卸连接。本申请实施例充分考虑了施工现场的运输情况,将贝雷架分为上支承部、下支承部以及立杆组件等若干构件,实现每个构件的现场组装,减少了运输所占用的空间,显著解决了贝雷架体积庞大而不便使用的难点,能够有效降低拆装和运输成本,具有显著的推广应用价值。
Bailey truss and construction method for hoisting and dismantling Bailey truss
The invention relates to the technical field of building construction, in particular to a bailey truss and a construction method for hoisting and dismantling the bailey truss, the bailey truss comprises an upper supporting part, a lower supporting part and a vertical rod assembly, the lower supporting part is arranged below the upper supporting part, and the vertical rod assembly is vertically arranged between the upper supporting part and the lower supporting part; the upper portion of the vertical rod assembly can be detachably connected with the upper supporting part, and the lower portion of the vertical rod assembly can be detachably connected with the lower supporting part. According to the embodiment of the invention, the transportation condition of a construction site is fully considered, the bailey truss is divided into a plurality of components such as the upper supporting part, the lower supporting part and the vertical rod assembly, the on-site assembly of each component is realized, the space occupied by transportation is reduced, and the difficulty that the bailey truss is large in size and inconvenient to use is obviously solved; and the dismounting and transportation cost can be effectively reduced, and the remarkable application and popularization value is achieved.
本发明涉及建筑施工的技术领域,具体涉及一种贝雷架以及贝雷架吊装拆除的施工方法,贝雷架包括上支承部、下支承部以及立杆组件,其中,下支承部设在上支承部的下方,立杆组件竖向地设在上支承部和下支承部之间,立杆组件的上部能够与上支承部可拆卸连接,立杆组件的下部能够与下支承部可拆卸连接。本申请实施例充分考虑了施工现场的运输情况,将贝雷架分为上支承部、下支承部以及立杆组件等若干构件,实现每个构件的现场组装,减少了运输所占用的空间,显著解决了贝雷架体积庞大而不便使用的难点,能够有效降低拆装和运输成本,具有显著的推广应用价值。
Bailey truss and construction method for hoisting and dismantling Bailey truss
贝雷架以及贝雷架吊装拆除的施工方法
XU XINXING (Autor:in) / TIAN JINGYANG (Autor:in) / LI YI (Autor:in) / LU DEHUI (Autor:in) / LIU BO (Autor:in)
09.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
High-rise Bailey truss cantilever construction method