Factory-like building platform and construction process thereof
The building platform comprises a guide rail vertically arranged along a building outer wall, a main scaffold board is horizontally arranged in the middle of the guide rail, a lower hanging frame is hung below the main scaffold board, an upper operation frame is arranged above the main scaffold board, and a lower hanging frame is arranged above the upper operation frame. A robot track is further arranged above the main scaffold board, the robot track is used for installing a spraying robot or a marking robot or a trowelling robot, a supporting frame is arranged above the upper operation frame, a shading spraying device and a hanging device are arranged on the supporting frame, and the hanging device is located below the shading spraying device; by arranging a robot track, a spraying robot, a marking robot, a trowelling robot and the like can be installed to assist construction, and intelligent construction is achieved; and through the improvement of the construction process, the construction efficiency can be improved and the construction quality can be ensured through the modification of the construction platform structure at different construction stages.
本发明公开了一种类工厂化建造平台及其施工工艺,建造平台包括:沿建筑外墙垂直设置的导轨,所述导轨中部水平设置有主脚手板,所述主脚手板的下方吊挂有下挂架,所述主脚手板的上方设置有上操作架,所述主脚手板的上方还设置有机器人轨道,所述机器人轨道用于安装喷涂机器人或划线机器人或抹平机器人,所述上操作架上方设置有支撑架,所述支撑架上设置有遮光喷淋装置和吊挂装置,所述吊挂装置位于遮光喷淋装置的下方;通过设置机器人轨道,可安装喷涂机器人、划线机器人和抹平机器人等协助施工,实现智能建造;并且通过施工工艺改进,在不同施工阶段的施工平台结构的修改能够提高施工效率,保证施工质量。
Factory-like building platform and construction process thereof
The building platform comprises a guide rail vertically arranged along a building outer wall, a main scaffold board is horizontally arranged in the middle of the guide rail, a lower hanging frame is hung below the main scaffold board, an upper operation frame is arranged above the main scaffold board, and a lower hanging frame is arranged above the upper operation frame. A robot track is further arranged above the main scaffold board, the robot track is used for installing a spraying robot or a marking robot or a trowelling robot, a supporting frame is arranged above the upper operation frame, a shading spraying device and a hanging device are arranged on the supporting frame, and the hanging device is located below the shading spraying device; by arranging a robot track, a spraying robot, a marking robot, a trowelling robot and the like can be installed to assist construction, and intelligent construction is achieved; and through the improvement of the construction process, the construction efficiency can be improved and the construction quality can be ensured through the modification of the construction platform structure at different construction stages.
本发明公开了一种类工厂化建造平台及其施工工艺,建造平台包括:沿建筑外墙垂直设置的导轨,所述导轨中部水平设置有主脚手板,所述主脚手板的下方吊挂有下挂架,所述主脚手板的上方设置有上操作架,所述主脚手板的上方还设置有机器人轨道,所述机器人轨道用于安装喷涂机器人或划线机器人或抹平机器人,所述上操作架上方设置有支撑架,所述支撑架上设置有遮光喷淋装置和吊挂装置,所述吊挂装置位于遮光喷淋装置的下方;通过设置机器人轨道,可安装喷涂机器人、划线机器人和抹平机器人等协助施工,实现智能建造;并且通过施工工艺改进,在不同施工阶段的施工平台结构的修改能够提高施工效率,保证施工质量。
Factory-like building platform and construction process thereof
一种类工厂化建造平台及其施工工艺
WANG YAO (Autor:in) / XU HONGGUANG (Autor:in) / TU MINJIE (Autor:in) / WU LONGSHAN (Autor:in) / ZHENG SHOU (Autor:in) / ZHENG HUI (Autor:in)
16.01.2024
Patent
Elektronische Ressource
Chinesisch
Lightweight steel structure factory building and construction process thereof
Europäisches Patentamt | 2023
|High-rise industrial factory building construction operation platform
Europäisches Patentamt | 2024
|INTELLIGENT CONSTRUCTION INTEGRATED PLATFORM AND FACTORY BUILDING CONSTRUCTION METHOD BASED ON SAME
Europäisches Patentamt | 2024
|Steel structure factory building and construction method thereof
Europäisches Patentamt | 2023
|Construction process for large steel structure factory building
Europäisches Patentamt | 2023
|