Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Formwork mounting structure with adjustable shaping combination and construction method
The invention relates to the field of building construction, and particularly discloses a shaping combination adjustable formwork mounting structure and a construction method.The mounting structure comprises a base, a sliding groove is formed in the base, four clamping pieces are arranged in the sliding groove in a sliding mode, the four clamping pieces are divided into two sets, and each set comprises two clamping pieces; a gap used for containing the formworks is formed between the two clamping pieces of each set, and a space for pouring concrete is formed between the two formworks. A positioning assembly is arranged in the sliding groove and used for locking the position of the clamping piece in the sliding groove. A fastening assembly is arranged between the two clamping pieces of each set and used for enabling the two clamping pieces located on the two sides of the formwork to clamp the formwork. The device is suitable for pouring of concrete members of different sizes, convenient to disassemble and assemble, beneficial to improving the construction efficiency and easy to achieve standardized construction.
本申请涉及建筑施工领域,具体公开了一种定型组合可调节的模板安装结构和施工方法,安装结构包括底座,底座上开设有滑槽,滑槽中滑动设置有四个夹持件,四个夹持件分为两组,每组包括两个夹持件,每组的两个夹持件之间设置有用于容纳模板的间隙,两个模板之间设置有浇筑混凝土的空间;滑槽中设置有定位组件,用于锁定夹持件在滑槽中的位置;每组的两个夹持件之间设置有紧固组件,用于使位于模板两侧的两个夹持件将模板夹紧。本申请适用于不同尺寸混凝土构件的浇筑,便于拆装,有助于提高施工效率,易实现标准化施工。
Formwork mounting structure with adjustable shaping combination and construction method
The invention relates to the field of building construction, and particularly discloses a shaping combination adjustable formwork mounting structure and a construction method.The mounting structure comprises a base, a sliding groove is formed in the base, four clamping pieces are arranged in the sliding groove in a sliding mode, the four clamping pieces are divided into two sets, and each set comprises two clamping pieces; a gap used for containing the formworks is formed between the two clamping pieces of each set, and a space for pouring concrete is formed between the two formworks. A positioning assembly is arranged in the sliding groove and used for locking the position of the clamping piece in the sliding groove. A fastening assembly is arranged between the two clamping pieces of each set and used for enabling the two clamping pieces located on the two sides of the formwork to clamp the formwork. The device is suitable for pouring of concrete members of different sizes, convenient to disassemble and assemble, beneficial to improving the construction efficiency and easy to achieve standardized construction.
本申请涉及建筑施工领域,具体公开了一种定型组合可调节的模板安装结构和施工方法,安装结构包括底座,底座上开设有滑槽,滑槽中滑动设置有四个夹持件,四个夹持件分为两组,每组包括两个夹持件,每组的两个夹持件之间设置有用于容纳模板的间隙,两个模板之间设置有浇筑混凝土的空间;滑槽中设置有定位组件,用于锁定夹持件在滑槽中的位置;每组的两个夹持件之间设置有紧固组件,用于使位于模板两侧的两个夹持件将模板夹紧。本申请适用于不同尺寸混凝土构件的浇筑,便于拆装,有助于提高施工效率,易实现标准化施工。
Formwork mounting structure with adjustable shaping combination and construction method
一种定型组合可调节的模板安装结构和施工方法
HAN CHENG (Autor:in) / ZHANG ZHIHAI (Autor:in) / ZHANG HONGBO (Autor:in) / ZHAO HAILIAN (Autor:in) / ZHANG FAN (Autor:in) / XIE JUN (Autor:in)
19.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Formwork column mounting construction structure and formwork column mounting construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Reserved hole modular combination adjustable formwork structure and construction method
Europäisches Patentamt | 2024
|Formwork combination and formwork combination construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|