Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Maritime work pool group structure and construction method thereof
The invention relates to the technical field of maritime work pools, and provides a maritime work pool group structure and a construction method thereof.The maritime work pool group structure comprises a first pool, a second pool, a third pool, a first water channel structure, a second water channel structure, a third water channel structure, a sandwich plate structure, a vertical construction joint and a horizontal construction joint; the first pool is provided with a bealock structure, and the second pool is provided with a multifunctional platform structure. The third pool is provided with a lifting platform; the first water channel structure is communicated between the first pool and the second pool, the second water channel structure is communicated between the first pool and the third pool, and the third water channel structure is communicated between the second pool and the third pool; the first pool, the second pool and the third pool are connected through sandwich plate structures, and the vertical construction joints divide the sandwich plate structures, the first water channel structure and the second water channel structure; the horizontal construction joints are arranged layer by layer from bottom to top. The construction precision of the maritime work pool structure is improved, and the construction difficulty is reduced.
本申请涉及海工水池技术领域,提供了一种海工水池群结构及其施工方法,包括:第一水池、第二水池、第三水池、第一水道结构、第二水道结构、第三水道结构、夹层板结构、竖向施工缝和水平施工缝;第一水池上设置有垭口结构,第二水池设置有多功能平台结构;第三水池设置有升降平台;第一水道结构连通于第一水池与第二水池之间,第二水道结构连通于第一水池与第三水池之间,第三水道结构连通于第二水池与第三水池之间;第一水池、第二水池以及第三水池之间分别通过夹层板结构连接,竖向施工缝分割夹层板结构、第一水道结构和第二水道结构;多个水平施工缝由下至上逐层设置。本发明提高了海工水池结构的施工精度,降低施工难度。
Maritime work pool group structure and construction method thereof
The invention relates to the technical field of maritime work pools, and provides a maritime work pool group structure and a construction method thereof.The maritime work pool group structure comprises a first pool, a second pool, a third pool, a first water channel structure, a second water channel structure, a third water channel structure, a sandwich plate structure, a vertical construction joint and a horizontal construction joint; the first pool is provided with a bealock structure, and the second pool is provided with a multifunctional platform structure. The third pool is provided with a lifting platform; the first water channel structure is communicated between the first pool and the second pool, the second water channel structure is communicated between the first pool and the third pool, and the third water channel structure is communicated between the second pool and the third pool; the first pool, the second pool and the third pool are connected through sandwich plate structures, and the vertical construction joints divide the sandwich plate structures, the first water channel structure and the second water channel structure; the horizontal construction joints are arranged layer by layer from bottom to top. The construction precision of the maritime work pool structure is improved, and the construction difficulty is reduced.
本申请涉及海工水池技术领域,提供了一种海工水池群结构及其施工方法,包括:第一水池、第二水池、第三水池、第一水道结构、第二水道结构、第三水道结构、夹层板结构、竖向施工缝和水平施工缝;第一水池上设置有垭口结构,第二水池设置有多功能平台结构;第三水池设置有升降平台;第一水道结构连通于第一水池与第二水池之间,第二水道结构连通于第一水池与第三水池之间,第三水道结构连通于第二水池与第三水池之间;第一水池、第二水池以及第三水池之间分别通过夹层板结构连接,竖向施工缝分割夹层板结构、第一水道结构和第二水道结构;多个水平施工缝由下至上逐层设置。本发明提高了海工水池结构的施工精度,降低施工难度。
Maritime work pool group structure and construction method thereof
一种海工水池群结构及其施工方法
19.01.2024
Patent
Elektronische Ressource
Chinesisch
Suspension type maritime work pool structure and construction method thereof
Europäisches Patentamt | 2023
|Large-span prestressed bealock beam, bealock structure, maritime work pool and construction method
Europäisches Patentamt | 2022
|Engineering Index Backfile | 1965
Europäisches Patentamt | 2024
|Stilling pool structure and construction method thereof
Europäisches Patentamt | 2021
|