Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Step-by-step replacement method for sliding door in platform door system
The invention discloses a step-by-step replacement method for a sliding door in a platform door system, which comprises the following steps of: firstly, analyzing a transmission part of the sliding door, analyzing whether the transmission part can be replaced on the premise that the absolute position of a lead screw of a transmission belt OR is not changed, and if the condition is met, replacing the transmission part; the replacement of each transmission part can be set as an independent construction node, if the condition cannot be met, whether a part can not be influenced when the absolute position of the belt OR lead screw is changed is analyzed, and the replacement of the transmission part meeting the condition can be set as an independent construction node. The part incompatible with the change of the absolute position of the belt OR lead screw and the belt OR lead screw are arranged as a construction node, and a sliding door control part is analyzed to judge whether compatible control can be achieved between an original system control part and a new replacement control part or not. The problem that the next-day operation of equipment is possibly influenced in the replacement process of the sliding door component in the platform door system is effectively solved, and the influence of the replacement process on subway operation is effectively reduced.
本发明公开了一种站台门系统中滑动门的分步式替换方法,首先对滑动门传动部件进行分析,分析是否可以在传动皮带OR丝杠绝对位置不产生变化的前提下完成传动部件的更换,若满足条件时,各传动部件的替换均可设置为单独的施工节点,若无法满足条件时,分析是否有部件可在皮带OR丝杠绝对位置发生变化时不受影响,满足条件传动部件的替换均可设置为单独的施工节点,皮带OR丝杠绝对位置发生改变无法兼容部件和皮带OR丝杠设置为一个施工节点,对滑动门控制部件进行分析判断原系统控制部件和新替换控制部件间是否可以实现兼容控制。本发明有效解决了站台门系统中滑动门部件替换过程中可能影响设备第二天运行的问题,有效降低替换过程对地铁运营的影响。
Step-by-step replacement method for sliding door in platform door system
The invention discloses a step-by-step replacement method for a sliding door in a platform door system, which comprises the following steps of: firstly, analyzing a transmission part of the sliding door, analyzing whether the transmission part can be replaced on the premise that the absolute position of a lead screw of a transmission belt OR is not changed, and if the condition is met, replacing the transmission part; the replacement of each transmission part can be set as an independent construction node, if the condition cannot be met, whether a part can not be influenced when the absolute position of the belt OR lead screw is changed is analyzed, and the replacement of the transmission part meeting the condition can be set as an independent construction node. The part incompatible with the change of the absolute position of the belt OR lead screw and the belt OR lead screw are arranged as a construction node, and a sliding door control part is analyzed to judge whether compatible control can be achieved between an original system control part and a new replacement control part or not. The problem that the next-day operation of equipment is possibly influenced in the replacement process of the sliding door component in the platform door system is effectively solved, and the influence of the replacement process on subway operation is effectively reduced.
本发明公开了一种站台门系统中滑动门的分步式替换方法,首先对滑动门传动部件进行分析,分析是否可以在传动皮带OR丝杠绝对位置不产生变化的前提下完成传动部件的更换,若满足条件时,各传动部件的替换均可设置为单独的施工节点,若无法满足条件时,分析是否有部件可在皮带OR丝杠绝对位置发生变化时不受影响,满足条件传动部件的替换均可设置为单独的施工节点,皮带OR丝杠绝对位置发生改变无法兼容部件和皮带OR丝杠设置为一个施工节点,对滑动门控制部件进行分析判断原系统控制部件和新替换控制部件间是否可以实现兼容控制。本发明有效解决了站台门系统中滑动门部件替换过程中可能影响设备第二天运行的问题,有效降低替换过程对地铁运营的影响。
Step-by-step replacement method for sliding door in platform door system
一种站台门系统中滑动门的分步式替换方法
NIU YUTAO (Autor:in) / LI YUAN (Autor:in) / WANG DUO (Autor:in) / HU WEI (Autor:in) / YE YIZHE (Autor:in) / WANG ZHENHUA (Autor:in) / TAN JING (Autor:in) / WANG LEI (Autor:in) / SUN HAIDENG (Autor:in) / QIN ZELONG (Autor:in)
23.01.2024
Patent
Elektronische Ressource
Chinesisch
Emergency door of Platform screen door system and emergency door replacement method
Europäisches Patentamt | 2018