Lifting-adjustable drainage inspection well and construction method thereof
The invention discloses an adjustable lifting drainage inspection well and a construction method thereof.The inspection well comprises a well lid and a prefabricated shaft, and through the special design of threading of the outer wall of a first circular iron drum additionally arranged on the lower portion of a common well lid and threading of the inner wall of a third circular iron drum pre-buried in the first prefabricated shaft, the inspection well can be lifted and lowered; after the well lid is installed on a shaft, the height of the inspection well can be freely adjusted and controlled under the condition that other masonry materials or procedures are not needed, and the problems that due to the fact that the exposed roadbed top of the shaft of the inspection well is too high or too low, the construction difficulty of a pavement water stable layer is large, and the periphery of the inspection well is settled are solved; the compaction effect of the pavement base around the shaft is ensured; and meanwhile, the strip-shaped holes for drainage are designed, so that the well lid has the drainage function, the efficiency of an urban drainage system is improved, and a municipal pipe network can better play a role in the using process of a municipal road.
本发明公开了一种可调节升降的排水检查井及其施工方法,检查井包括井盖和预制井筒,通过对普通井盖下部增加的第一圆形铁桶的外壁车丝及在第一预制井筒上预埋的第三圆形铁桶的内壁车丝的特殊设计,实现了在井盖安装到井筒上后,可在无需借助其他砌筑材料或工序的情况下,实现自由调节控制检查井的高度,避免了因检查井井筒外露路床顶过高或过低导致的路面水稳层施工难度大及检查井周边出现沉降的问题,保证了井筒周边路面基层的压实效果;同时通过设计排水用条形孔,使井盖兼顾排水功能,增加了城市排水系统的效率,使市政管网在市政道路的使用过程中能更好的发挥其作用。
Lifting-adjustable drainage inspection well and construction method thereof
The invention discloses an adjustable lifting drainage inspection well and a construction method thereof.The inspection well comprises a well lid and a prefabricated shaft, and through the special design of threading of the outer wall of a first circular iron drum additionally arranged on the lower portion of a common well lid and threading of the inner wall of a third circular iron drum pre-buried in the first prefabricated shaft, the inspection well can be lifted and lowered; after the well lid is installed on a shaft, the height of the inspection well can be freely adjusted and controlled under the condition that other masonry materials or procedures are not needed, and the problems that due to the fact that the exposed roadbed top of the shaft of the inspection well is too high or too low, the construction difficulty of a pavement water stable layer is large, and the periphery of the inspection well is settled are solved; the compaction effect of the pavement base around the shaft is ensured; and meanwhile, the strip-shaped holes for drainage are designed, so that the well lid has the drainage function, the efficiency of an urban drainage system is improved, and a municipal pipe network can better play a role in the using process of a municipal road.
本发明公开了一种可调节升降的排水检查井及其施工方法,检查井包括井盖和预制井筒,通过对普通井盖下部增加的第一圆形铁桶的外壁车丝及在第一预制井筒上预埋的第三圆形铁桶的内壁车丝的特殊设计,实现了在井盖安装到井筒上后,可在无需借助其他砌筑材料或工序的情况下,实现自由调节控制检查井的高度,避免了因检查井井筒外露路床顶过高或过低导致的路面水稳层施工难度大及检查井周边出现沉降的问题,保证了井筒周边路面基层的压实效果;同时通过设计排水用条形孔,使井盖兼顾排水功能,增加了城市排水系统的效率,使市政管网在市政道路的使用过程中能更好的发挥其作用。
Lifting-adjustable drainage inspection well and construction method thereof
一种可调节升降的排水检查井及其施工方法
LI HONGHAI (Autor:in) / LIU YONGCHAO (Autor:in)
02.02.2024
Patent
Elektronische Ressource
Chinesisch
Inspection well with adjustable lifting top and construction and operation method thereof
Europäisches Patentamt | 2023
|Assembled drainage inspection well and construction method thereof