Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated building decoration and heat preservation integrated outer wall and construction method
The fabricated building decoration and heat preservation integrated outer wall comprises a wall body, the surface of the wall body is connected with a steel pipe through an opening, one end of the outer wall of the steel pipe is connected with a decoration wall, the inner layer of the steel pipe is connected with a first heat insulation pipe, the bottom of the steel pipe is connected with an elastic rod, and one end of the elastic rod is connected with a metal net. The bottom of the metal net is connected with memory metal. The characteristic that the memory metal can return to the original state after being heated is utilized, so that the ventilation mode and the heating mode are switched in summer and winter, in summer, the memory metal is in a standing state, and at the moment, a large amount of air exists in the first heat insulation pipe; the ventilation effect of the inner side of the whole wall body can be improved through air flowing, the better the ventilation effect is, the higher the heat dissipation speed is, and therefore the heat of the innermost layer of the wall body is further reduced.
本发明公开了一种装配式建筑装饰保温一体化外墙及施工方法,包括墙体,所述墙体表面通过开孔连接有钢管,所述钢管外壁一端连接有装饰墙,所述钢管内层连接有第一隔热管,所述钢管底部连接有弹性杆,所述弹性杆一端连接有金属网,所述金属网底部连接有记忆金属。本申请利用了记忆金属受热后会使得记忆金属回复到原有状态的特性,从而在夏天和冬天两个季节内切换通风和加热模式,在夏天时,记忆金属属于站立的状态,此时第一隔热管内会存在大量空气,空气的流动可以提高整个墙体内侧的通风效果,通风的效果越好散热的速度也就越快,从而进一步降低墙体最内层的热量。
Fabricated building decoration and heat preservation integrated outer wall and construction method
The fabricated building decoration and heat preservation integrated outer wall comprises a wall body, the surface of the wall body is connected with a steel pipe through an opening, one end of the outer wall of the steel pipe is connected with a decoration wall, the inner layer of the steel pipe is connected with a first heat insulation pipe, the bottom of the steel pipe is connected with an elastic rod, and one end of the elastic rod is connected with a metal net. The bottom of the metal net is connected with memory metal. The characteristic that the memory metal can return to the original state after being heated is utilized, so that the ventilation mode and the heating mode are switched in summer and winter, in summer, the memory metal is in a standing state, and at the moment, a large amount of air exists in the first heat insulation pipe; the ventilation effect of the inner side of the whole wall body can be improved through air flowing, the better the ventilation effect is, the higher the heat dissipation speed is, and therefore the heat of the innermost layer of the wall body is further reduced.
本发明公开了一种装配式建筑装饰保温一体化外墙及施工方法,包括墙体,所述墙体表面通过开孔连接有钢管,所述钢管外壁一端连接有装饰墙,所述钢管内层连接有第一隔热管,所述钢管底部连接有弹性杆,所述弹性杆一端连接有金属网,所述金属网底部连接有记忆金属。本申请利用了记忆金属受热后会使得记忆金属回复到原有状态的特性,从而在夏天和冬天两个季节内切换通风和加热模式,在夏天时,记忆金属属于站立的状态,此时第一隔热管内会存在大量空气,空气的流动可以提高整个墙体内侧的通风效果,通风的效果越好散热的速度也就越快,从而进一步降低墙体最内层的热量。
Fabricated building decoration and heat preservation integrated outer wall and construction method
一种装配式建筑装饰保温一体化外墙及施工方法
CHEN HUIYU (Autor:in) / LI HAO (Autor:in) / WANG JUNWU (Autor:in) / WU MEIQIONG (Autor:in) / YU NA (Autor:in) / TANG SHANDE (Autor:in) / PANG HAIYU (Autor:in) / TANG LIBO (Autor:in) / ZHANG XULEI (Autor:in) / PENG CONG (Autor:in)
02.02.2024
Patent
Elektronische Ressource
Chinesisch
Building outer wall heat preservation and decoration integrated construction device
Europäisches Patentamt | 2021
|Construction method of building outer wall heat preservation and decoration integrated plate
Europäisches Patentamt | 2021
|Building outer wall heat preservation and decoration integrated construction device and method
Europäisches Patentamt | 2024
|Novel heat preservation decoration construction process for building outer wall
Europäisches Patentamt | 2021
|Novel heat-preservation decoration construction technology for building outer wall
Europäisches Patentamt | 2020
|