Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Digital construction method for abutment back backfilling hydraulic rammer
The invention belongs to the technical field of abutment back backfilling, and particularly relates to an abutment back backfilling hydraulic rammer digital construction method which comprises the following steps: step 1, mounting and fixing an abutment body and conveying and placing a laying material, mounting the abutment body on the construction ground firmly, arranging a pressure measuring mechanism on one side of the abutment body, and measuring the pressure of the pressure measuring mechanism; the pressure measuring mechanism comprises a pressure sensor, and after the platform body is installed and fixed firmly, laid materials are controlled by a conveying vehicle to topple over the construction ground. According to the digital construction method of the abutment back backfilling hydraulic tamper, the pressure measuring mechanism is arranged on the surface of the abutment body in the abutment back backfilling process, so that the tamping pressure is detected in real time, the power of the hydraulic tamper is controlled and adjusted, the extra power loss is reduced, and the power is controlled to be just tamping power; the influence on the surrounding environment, the bridge foundation and the column is reduced as much as possible, and the damage to the platform body due to extrusion caused by overlarge compacting force is prevented.
本发明属于台背回填技术领域,尤其是一种台背回填液压夯数字化施工方法,包括以下步骤,步骤一、台身安装固定以及铺设材料输送放置,台身安装在施工地面上,安装牢靠,且在台身的一侧设置压力测量机构,压力测量机构包括有压力传感器,台身安装固定牢靠后进行利用输送车辆控制铺设的材料倾倒在施工地面上方。该台背回填液压夯数字化施工方法,本发明通过在台背回填过程中利用台身的表面设置压力测量机构,来实时检测夯实的压力,控制调节液压夯的功率,减少额外功率损耗,并且将功率控制在刚好夯实的功率,尽量减少对周边环境和桥梁基础和柱子的影响,以及防止压实力过大对台身挤压造成损坏。
Digital construction method for abutment back backfilling hydraulic rammer
The invention belongs to the technical field of abutment back backfilling, and particularly relates to an abutment back backfilling hydraulic rammer digital construction method which comprises the following steps: step 1, mounting and fixing an abutment body and conveying and placing a laying material, mounting the abutment body on the construction ground firmly, arranging a pressure measuring mechanism on one side of the abutment body, and measuring the pressure of the pressure measuring mechanism; the pressure measuring mechanism comprises a pressure sensor, and after the platform body is installed and fixed firmly, laid materials are controlled by a conveying vehicle to topple over the construction ground. According to the digital construction method of the abutment back backfilling hydraulic tamper, the pressure measuring mechanism is arranged on the surface of the abutment body in the abutment back backfilling process, so that the tamping pressure is detected in real time, the power of the hydraulic tamper is controlled and adjusted, the extra power loss is reduced, and the power is controlled to be just tamping power; the influence on the surrounding environment, the bridge foundation and the column is reduced as much as possible, and the damage to the platform body due to extrusion caused by overlarge compacting force is prevented.
本发明属于台背回填技术领域,尤其是一种台背回填液压夯数字化施工方法,包括以下步骤,步骤一、台身安装固定以及铺设材料输送放置,台身安装在施工地面上,安装牢靠,且在台身的一侧设置压力测量机构,压力测量机构包括有压力传感器,台身安装固定牢靠后进行利用输送车辆控制铺设的材料倾倒在施工地面上方。该台背回填液压夯数字化施工方法,本发明通过在台背回填过程中利用台身的表面设置压力测量机构,来实时检测夯实的压力,控制调节液压夯的功率,减少额外功率损耗,并且将功率控制在刚好夯实的功率,尽量减少对周边环境和桥梁基础和柱子的影响,以及防止压实力过大对台身挤压造成损坏。
Digital construction method for abutment back backfilling hydraulic rammer
一种台背回填液压夯数字化施工方法
WANG ZENGBIN (Autor:in) / LI KEEN (Autor:in) / WANG BINGBING (Autor:in) / SUN SHUHUI (Autor:in) / XU XIANGKUI (Autor:in) / WANG YU (Autor:in) / HAN LANGTAO (Autor:in)
06.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Hydraulic rammer construction device and method for backfill soil on abutment back
Europäisches Patentamt | 2023
|Standardized construction method for backfilling abutment back
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Method for controlling abutment back backfilling construction quality
Europäisches Patentamt | 2023
|Construction method for backfilling abutment back of light foam concrete bridge abutment
Europäisches Patentamt | 2023
|