Digging and filling construction method
The invention relates to the technical field of excavation and filling construction, in particular to an excavation and filling construction method which comprises the following steps: S1, site preparation: cleaning obstacles on a site to ensure that a construction area is flat; s2, measuring marks: measuring and setting the marks on the site according to design requirements, and determining the range and height of excavation and filling; s3, excavation is conducted, specifically, earthwork needing to be excavated out is excavated through an excavator, and classified and equivalent stacking is conducted; s4, filling: filling the excavated earthwork and a filling material into the excavated pit hole and the foundation, and carrying out layered filling; s5, compaction is conducted, specifically, a compaction device and vibration plate equipment are used for compacting the fill, and the compactness and stability of the fill are improved; and S6, leveling, wherein the filled earth surface is leveled, and it is ensured that the design requirement is met. And by arranging the first compaction adjustment control device and the second compaction adjustment control device, the compaction efficiency and quality are greatly improved.
本发明涉及挖填方施工技术领域,具体的说是一种挖填方施工方法,包括以下步骤:S1、场地准备:清理场地上的障碍物,确保施工区域平整;S2、测量标志:根据设计要求在场地上进行测量并设置标志,确定挖方和填方的范围和高度;S3、挖方:使用挖掘机将需要挖除的土方开挖出来,并进行分类和等量的堆放;S4、填方:将挖掘出的土方和填充材料填入挖出的坑洞和地基中,并且进行分层填筑;S5、压实:使用压实装置、振动板设备对填方进行压实,提高填方的密实度和稳定性;S6、平整整理:对填方后的地表进行平整整理,确保符合设计要求。通过设置第一压实调节控制装置和第二压实调节控制装置,大大的提高了压实的效率和质量。
Digging and filling construction method
The invention relates to the technical field of excavation and filling construction, in particular to an excavation and filling construction method which comprises the following steps: S1, site preparation: cleaning obstacles on a site to ensure that a construction area is flat; s2, measuring marks: measuring and setting the marks on the site according to design requirements, and determining the range and height of excavation and filling; s3, excavation is conducted, specifically, earthwork needing to be excavated out is excavated through an excavator, and classified and equivalent stacking is conducted; s4, filling: filling the excavated earthwork and a filling material into the excavated pit hole and the foundation, and carrying out layered filling; s5, compaction is conducted, specifically, a compaction device and vibration plate equipment are used for compacting the fill, and the compactness and stability of the fill are improved; and S6, leveling, wherein the filled earth surface is leveled, and it is ensured that the design requirement is met. And by arranging the first compaction adjustment control device and the second compaction adjustment control device, the compaction efficiency and quality are greatly improved.
本发明涉及挖填方施工技术领域,具体的说是一种挖填方施工方法,包括以下步骤:S1、场地准备:清理场地上的障碍物,确保施工区域平整;S2、测量标志:根据设计要求在场地上进行测量并设置标志,确定挖方和填方的范围和高度;S3、挖方:使用挖掘机将需要挖除的土方开挖出来,并进行分类和等量的堆放;S4、填方:将挖掘出的土方和填充材料填入挖出的坑洞和地基中,并且进行分层填筑;S5、压实:使用压实装置、振动板设备对填方进行压实,提高填方的密实度和稳定性;S6、平整整理:对填方后的地表进行平整整理,确保符合设计要求。通过设置第一压实调节控制装置和第二压实调节控制装置,大大的提高了压实的效率和质量。
Digging and filling construction method
一种挖填方施工方法
LIU QILIANG (Autor:in) / SHI WEIMIN (Autor:in) / YANG YUNFU (Autor:in) / HU XIHUA (Autor:in) / SHI JINGXUAN (Autor:in) / ZHENG LINTAO (Autor:in) / GAO HUAN (Autor:in)
06.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Earthwork digging and filling device for building construction
Europäisches Patentamt | 2024
|Road repairing construction process for filling-digging junction roadbed section
Europäisches Patentamt | 2020
|Device and construction method for assisting sand filling method in hole digging
Europäisches Patentamt | 2021
|Roadbed structure at road filling and digging junction and construction method thereof
Europäisches Patentamt | 2023
|