Expansion post-cast strip building surface layer dewatering construction method
The invention discloses an expansion post-cast strip building surface layer dewatering construction method, and relates to the technical field of building construction.The construction method comprises the following steps that S10, concrete structures at the two ends of a post-cast strip are subjected to chiseling treatment, and sundries are removed in time; s20, a post-cast strip is cleaned, and C15 concrete is poured after it is ensured that no accumulated water exists; s30, sealing treatment is conducted after waterproof coiled materials are laid; s40, the reserved steel bars are subjected to lap joint after being straightened and derusted; s50, micro-expansive concrete is poured on the post-cast strip; and S60, after line snapping and positioning are conducted according to the size of the steel tank, the concrete is cut and chiseled away. S70, the channel steel is reversely buckled and installed in the groove, and waterproof mortar is used for conducting waterproof treatment; and S80, fine aggregate concrete is poured. The construction method has the beneficial effects that the channel steel is arranged on the structural construction joint to serve as a drainage channel, water is guided into the water collecting well, leaked water is effectively evacuated in time, and the problem that a basement is humid is effectively solved.
本发明公开了一种膨胀后浇带建筑面层疏水施工方法,涉及建筑施工技术领域,该施工方法包括以下步骤:S10:对后浇带两端的混凝土结构进行凿毛处理,并及时清理杂物;S20:清理后浇带,确保无积水后浇筑C15混凝土;S30:铺设防水卷材后进行密封处理;S40:对预留钢筋进行调直和除锈后进行搭接;S50:后浇带浇筑微膨胀混凝土;S60:按钢槽大小进行弹线定位后,对混凝土进行切割与凿除。S70:将槽钢倒扣安装在凹槽处,使用防水砂浆进行防水处理;S80:浇筑细石混凝土。本发明的有益效果是:该施工方法通过在结构施工缝上面设置槽钢作为排水通道,将水分引导到集水井中,及时对渗漏水进行有效疏散,有效解决了地下室潮湿的问题。
Expansion post-cast strip building surface layer dewatering construction method
The invention discloses an expansion post-cast strip building surface layer dewatering construction method, and relates to the technical field of building construction.The construction method comprises the following steps that S10, concrete structures at the two ends of a post-cast strip are subjected to chiseling treatment, and sundries are removed in time; s20, a post-cast strip is cleaned, and C15 concrete is poured after it is ensured that no accumulated water exists; s30, sealing treatment is conducted after waterproof coiled materials are laid; s40, the reserved steel bars are subjected to lap joint after being straightened and derusted; s50, micro-expansive concrete is poured on the post-cast strip; and S60, after line snapping and positioning are conducted according to the size of the steel tank, the concrete is cut and chiseled away. S70, the channel steel is reversely buckled and installed in the groove, and waterproof mortar is used for conducting waterproof treatment; and S80, fine aggregate concrete is poured. The construction method has the beneficial effects that the channel steel is arranged on the structural construction joint to serve as a drainage channel, water is guided into the water collecting well, leaked water is effectively evacuated in time, and the problem that a basement is humid is effectively solved.
本发明公开了一种膨胀后浇带建筑面层疏水施工方法,涉及建筑施工技术领域,该施工方法包括以下步骤:S10:对后浇带两端的混凝土结构进行凿毛处理,并及时清理杂物;S20:清理后浇带,确保无积水后浇筑C15混凝土;S30:铺设防水卷材后进行密封处理;S40:对预留钢筋进行调直和除锈后进行搭接;S50:后浇带浇筑微膨胀混凝土;S60:按钢槽大小进行弹线定位后,对混凝土进行切割与凿除。S70:将槽钢倒扣安装在凹槽处,使用防水砂浆进行防水处理;S80:浇筑细石混凝土。本发明的有益效果是:该施工方法通过在结构施工缝上面设置槽钢作为排水通道,将水分引导到集水井中,及时对渗漏水进行有效疏散,有效解决了地下室潮湿的问题。
Expansion post-cast strip building surface layer dewatering construction method
一种膨胀后浇带建筑面层疏水施工方法
ZHOU FENG (Autor:in) / YANG ZHEN (Autor:in) / CHEN PENG (Autor:in) / XU WENBING (Autor:in) / ZHANG YAYUN (Autor:in)
06.02.2024
Patent
Elektronische Ressource
Chinesisch
Sunken post-cast strip dewatering construction process
Europäisches Patentamt | 2023
|Basement bottom plate post-cast strip dewatering construction method
Europäisches Patentamt | 2024
|Construction method for post-cast strip of building technical layer
Europäisches Patentamt | 2024
|