Construction method for post-cast strip of building technical layer
The invention relates to a post-cast strip construction method of a building technical layer, which is applied to post-cast strip positions of a top plate and a bottom plate of the building technical layer, and comprises the following steps of: 1, pouring the bottom plate, and reserving the post-cast strip position without pouring; secondly, a scaffold is erected upwards from the bottom plate, the scaffold is formed by erecting cross rods and vertical rods of the standard size, an adjustable base is arranged at the top of the scaffold, square tube cushion block assemblies are fixed to the upper end of the adjustable base, and the multiple layers of square tube cushion block assemblies are accumulated upwards till the elevation of the bottom face of the top plate is reached; thirdly, concrete of the top plate is poured, and the position of a post-cast strip of the top plate is reserved and not poured; fourthly, a pouring hole is formed in the post-cast strip formwork of the top plate, and the position of the pouring hole is located over the post-cast strip of the bottom plate; fifthly, on the top plate, a grouting pipe penetrates through the pouring hole to extend to the position of the post-pouring belt of the bottom plate, and the post-pouring belt of the bottom plate is poured; and sixthly, after the pouring hole is plugged through a sealing device, the top plate post-pouring belt is poured.
本发明涉及建筑技术层的后浇带施工方法,应用于建筑技术层顶板和建筑技术层底板的后浇带位置,步骤一、浇筑底板,预留后浇带位置不浇筑;步骤二、自底板向上搭建脚手架,脚手架由标准尺寸的横杆和立杆搭建而成,脚手架顶部设置可调底座,可调底座上端固定方管垫块组件,多层方管垫块组件向上累加,直至达到顶板底面标高;步骤三、浇筑顶板的混凝土,预留顶板的后浇带位置不浇筑;步骤四、在顶板的后浇带模板上开设浇筑孔,浇筑孔的位置处于底板的后浇带的正上方;步骤五、在顶板上,将注浆管穿过浇筑孔延伸至底板后浇带位置,浇筑底板的后浇带;步骤六、用封口装置对浇筑孔进行封堵后,浇筑顶板后浇带。
Construction method for post-cast strip of building technical layer
The invention relates to a post-cast strip construction method of a building technical layer, which is applied to post-cast strip positions of a top plate and a bottom plate of the building technical layer, and comprises the following steps of: 1, pouring the bottom plate, and reserving the post-cast strip position without pouring; secondly, a scaffold is erected upwards from the bottom plate, the scaffold is formed by erecting cross rods and vertical rods of the standard size, an adjustable base is arranged at the top of the scaffold, square tube cushion block assemblies are fixed to the upper end of the adjustable base, and the multiple layers of square tube cushion block assemblies are accumulated upwards till the elevation of the bottom face of the top plate is reached; thirdly, concrete of the top plate is poured, and the position of a post-cast strip of the top plate is reserved and not poured; fourthly, a pouring hole is formed in the post-cast strip formwork of the top plate, and the position of the pouring hole is located over the post-cast strip of the bottom plate; fifthly, on the top plate, a grouting pipe penetrates through the pouring hole to extend to the position of the post-pouring belt of the bottom plate, and the post-pouring belt of the bottom plate is poured; and sixthly, after the pouring hole is plugged through a sealing device, the top plate post-pouring belt is poured.
本发明涉及建筑技术层的后浇带施工方法,应用于建筑技术层顶板和建筑技术层底板的后浇带位置,步骤一、浇筑底板,预留后浇带位置不浇筑;步骤二、自底板向上搭建脚手架,脚手架由标准尺寸的横杆和立杆搭建而成,脚手架顶部设置可调底座,可调底座上端固定方管垫块组件,多层方管垫块组件向上累加,直至达到顶板底面标高;步骤三、浇筑顶板的混凝土,预留顶板的后浇带位置不浇筑;步骤四、在顶板的后浇带模板上开设浇筑孔,浇筑孔的位置处于底板的后浇带的正上方;步骤五、在顶板上,将注浆管穿过浇筑孔延伸至底板后浇带位置,浇筑底板的后浇带;步骤六、用封口装置对浇筑孔进行封堵后,浇筑顶板后浇带。
Construction method for post-cast strip of building technical layer
建筑技术层的后浇带施工方法
LI CHENHAO (Autor:in) / YU ZHIFU (Autor:in) / YANG SHUO (Autor:in) / LI JIAQI (Autor:in)
15.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Expansion post-cast strip building surface layer dewatering construction method
Europäisches Patentamt | 2024
|Post-cast strip formwork and construction method for pouring post-cast strip
Europäisches Patentamt | 2021
|