Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of multi-curvature large footpath structure
The invention discloses a construction method of a multi-curvature large footpath structure. The footpath structure comprises a frame building body, a footpath arranged on the frame building body, a vertical supporting structure and an inclined supporting structure, wherein the vertical supporting structure and the inclined supporting structure are arranged on the footpath. When a footpath is installed, a jig frame is used as a support on the ground, a first unit truss structure, a second unit truss structure, a third unit truss structure, a fourth unit truss structure, a fifth unit truss structure and a sixth unit truss structure are welded and manufactured respectively, and column top connecting rods are welded and fixed to corresponding positions on the unit truss structures; then the first unit truss structure, the second unit truss structure and the third unit truss structure are spliced into a C-shaped structure and welded and fixed; and the fourth unit truss structure, the fifth unit truss structure and the sixth unit truss structure are spliced into another C-shaped structure and are welded and fixed. The technical problems that a multi-curvature large footpath is inconvenient to install and poor in stability are solved.
本发明公开了一种多曲度大型空中步道结构的施工方法,空中步道结构包括框架楼体,设置在框架楼体上的空中步道、设置在空中步道上的竖向支撑结构和斜向支撑结构;在空中步道安装时,在地面使用胎架作为支撑,分别焊接制作第一单元桁架结构、第二单元桁架结构、第三单元桁架结构、第四单元桁架结构、第五单元桁架结构和第六单元桁架结构,将柱顶连杆焊接固定至单元桁架结构上的相应位置;然后将第一单元桁架结构、第二单元桁架结构和第三单元桁架结构拼接为一个C型结构并焊接固定;将第四单元桁架结构、第五单元桁架结构和第六单元桁架结构拼接为另一个C型结构并焊接固定。本发明解决了多曲度大型空中步道安装不便、稳定性差的技术问题。
Construction method of multi-curvature large footpath structure
The invention discloses a construction method of a multi-curvature large footpath structure. The footpath structure comprises a frame building body, a footpath arranged on the frame building body, a vertical supporting structure and an inclined supporting structure, wherein the vertical supporting structure and the inclined supporting structure are arranged on the footpath. When a footpath is installed, a jig frame is used as a support on the ground, a first unit truss structure, a second unit truss structure, a third unit truss structure, a fourth unit truss structure, a fifth unit truss structure and a sixth unit truss structure are welded and manufactured respectively, and column top connecting rods are welded and fixed to corresponding positions on the unit truss structures; then the first unit truss structure, the second unit truss structure and the third unit truss structure are spliced into a C-shaped structure and welded and fixed; and the fourth unit truss structure, the fifth unit truss structure and the sixth unit truss structure are spliced into another C-shaped structure and are welded and fixed. The technical problems that a multi-curvature large footpath is inconvenient to install and poor in stability are solved.
本发明公开了一种多曲度大型空中步道结构的施工方法,空中步道结构包括框架楼体,设置在框架楼体上的空中步道、设置在空中步道上的竖向支撑结构和斜向支撑结构;在空中步道安装时,在地面使用胎架作为支撑,分别焊接制作第一单元桁架结构、第二单元桁架结构、第三单元桁架结构、第四单元桁架结构、第五单元桁架结构和第六单元桁架结构,将柱顶连杆焊接固定至单元桁架结构上的相应位置;然后将第一单元桁架结构、第二单元桁架结构和第三单元桁架结构拼接为一个C型结构并焊接固定;将第四单元桁架结构、第五单元桁架结构和第六单元桁架结构拼接为另一个C型结构并焊接固定。本发明解决了多曲度大型空中步道安装不便、稳定性差的技术问题。
Construction method of multi-curvature large footpath structure
一种多曲度大型空中步道结构的施工方法
ZHOU YANCHUN (Autor:in) / FANG SHIPENG (Autor:in) / XUE HENGYAN (Autor:in) / LI MINGKE (Autor:in) / LIU YUFENG (Autor:in) / CAO FENGXIN (Autor:in) / HAN YOUQIANG (Autor:in) / ZHAO HUAYING (Autor:in) / CHEN HAO (Autor:in) / LI YANG (Autor:in)
13.02.2024
Patent
Elektronische Ressource
Chinesisch
Fabricated curve hydrophilic footpath and hydrophilic footpath construction method
Europäisches Patentamt | 2021
|Fabricated waterside footpath and construction method thereof
Europäisches Patentamt | 2021
|Mine slope greening drainage footpath construction method
Europäisches Patentamt | 2024
|Garden ecological footpath structure and construction method thereof
Europäisches Patentamt | 2021
|