Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
House building pile foundation structure and construction method
The house building pile foundation structure is arranged in a foundation pit and comprises a plurality of reinforcing bars and a bottom supporting unit, the bottom supporting unit comprises a fixing assembly, the fixing assembly is detachably connected with the bottom face of the foundation pit, a plurality of supporting assemblies are arranged on the side face of the fixing assembly, and one ends of the supporting assemblies are fixedly connected with one ends of the reinforcing bars. All the supporting assemblies are fixedly connected and communicated with a blasting assembly, the top ends of the reinforcing bars fixedly connected with the supporting assemblies are fixedly connected with first clamping pieces, the first clamping pieces are detachably connected with extension sections, the extension sections comprise second clamping pieces and third clamping pieces, and the second clamping pieces and the third clamping pieces are fixedly connected through a plurality of reinforcing bars. The space of the bearing platform at the bottom end of the foundation pit can be expanded through the explosion assemblies, the bearing capacity of the bearing platform is improved, use of welding connection of the adjacent extension sections can be avoided, and environmental pollution is reduced.
本发明公开一种房屋建筑桩基结构及施工方法,设置于基坑内,包括若干钢筋条和底支撑单元,底支撑单元包括固定组件,固定组件与基坑底面可拆卸连接,固定组件侧面设置有若干支撑组件,支撑组件的一端与钢筋条的一端固定连接,所有支撑组件固接并连通有爆破组件,支撑组件固定连接的钢筋条顶端固定连接有第一卡接件,第一卡接件可拆卸连接有延长节,延长节包括第二卡接件和第三卡接件,第二卡接件和第三卡接件之间通过若干钢筋条固定连接。本发明能够利用爆炸组件扩展基坑底端的承台空间,提高了承台的承载力,并且能够避免相邻的延长节烧焊连接的使用,降低了环境的污染。
House building pile foundation structure and construction method
The house building pile foundation structure is arranged in a foundation pit and comprises a plurality of reinforcing bars and a bottom supporting unit, the bottom supporting unit comprises a fixing assembly, the fixing assembly is detachably connected with the bottom face of the foundation pit, a plurality of supporting assemblies are arranged on the side face of the fixing assembly, and one ends of the supporting assemblies are fixedly connected with one ends of the reinforcing bars. All the supporting assemblies are fixedly connected and communicated with a blasting assembly, the top ends of the reinforcing bars fixedly connected with the supporting assemblies are fixedly connected with first clamping pieces, the first clamping pieces are detachably connected with extension sections, the extension sections comprise second clamping pieces and third clamping pieces, and the second clamping pieces and the third clamping pieces are fixedly connected through a plurality of reinforcing bars. The space of the bearing platform at the bottom end of the foundation pit can be expanded through the explosion assemblies, the bearing capacity of the bearing platform is improved, use of welding connection of the adjacent extension sections can be avoided, and environmental pollution is reduced.
本发明公开一种房屋建筑桩基结构及施工方法,设置于基坑内,包括若干钢筋条和底支撑单元,底支撑单元包括固定组件,固定组件与基坑底面可拆卸连接,固定组件侧面设置有若干支撑组件,支撑组件的一端与钢筋条的一端固定连接,所有支撑组件固接并连通有爆破组件,支撑组件固定连接的钢筋条顶端固定连接有第一卡接件,第一卡接件可拆卸连接有延长节,延长节包括第二卡接件和第三卡接件,第二卡接件和第三卡接件之间通过若干钢筋条固定连接。本发明能够利用爆炸组件扩展基坑底端的承台空间,提高了承台的承载力,并且能够避免相邻的延长节烧焊连接的使用,降低了环境的污染。
House building pile foundation structure and construction method
房屋建筑桩基结构及施工方法
JING XU (Autor:in) / LI ZHIWEI (Autor:in) / ZHANG DAPENG (Autor:in) / WANG XIN (Autor:in) / KANG DONG-WOOK (Autor:in) / RONG GEFENG (Autor:in) / ZHAO MINGJIE (Autor:in) / REN WEINA (Autor:in) / GU WENQI (Autor:in) / ZHAI CHAO (Autor:in)
20.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of house building pile foundation
Europäisches Patentamt | 2024
|Construction method of house building pile foundation
Europäisches Patentamt | 2023
|Novel house building pile foundation structure and construction method thereof
Europäisches Patentamt | 2020
|