Staggered wall column slab staggering and slurry leakage prevention construction method
The invention relates to the technical field of wall column construction, and provides an overlapped wall column slab staggering and slurry leakage prevention construction method which comprises the following steps: S1, scabbling treatment: firstly, positioning paying-off and scabbling are carried out, and scabbling treatment is carried out on the position of an overlapped wall column; s2, wall column reinforcing steel bars are bound, wherein the wall column reinforcing steel bars are bound at the positions subjected to chiseling treatment; s3, column side line elastic carving is conducted, specifically, column side line elastic carving is conducted on the datum plane according to the drawing; s4, a column formwork is installed; s5, template cleaning; s6, pouring is conducted; s7, maintenance is conducted; s8, removing the mold; according to the construction method, through the operations of positioning and paying off, chiseling, binding of wall column steel bars, elastic carving of column side lines, installation of column formworks, cleaning, pouring, maintenance, formwork removal and the like, the construction method of the coincident wall columns is further improved, and the phenomena of slab staggering and slurry leakage easily occurring in a conventional construction method of the coincident wall columns can be effectively avoided; and the quality of the overlapped wall column can be greatly improved, and the supporting strength is improved.
本发明涉及墙柱施工技术领域,提供了一种重合墙柱防错台漏浆施工方法,包括:S1:凿毛处理:首先进行定位放线及凿毛,在重合墙柱的位置上进行凿毛处理;S2:绑扎墙柱钢筋:在经过凿毛处理后的位置上进行绑扎墙柱钢筋;S3:柱边线弹刻:根据图纸在基准面上进行柱边线弹刻;S4:柱模板安装;S5:模板清理;S6:浇筑;S7:养护;S8:拆模;本发明通过定位放线、凿毛、绑扎墙柱钢筋、柱边线弹刻、安装柱模板、清理、浇筑、养护以及拆模等操作,不仅对重合墙柱的施工方法进行了进一步的改进,能够有效的避免常规的重合墙柱的施工方法中容易出现的错台漏浆的现象发生;而且能够大幅度的提高重合墙柱的质量,提高其支撑强度。
Staggered wall column slab staggering and slurry leakage prevention construction method
The invention relates to the technical field of wall column construction, and provides an overlapped wall column slab staggering and slurry leakage prevention construction method which comprises the following steps: S1, scabbling treatment: firstly, positioning paying-off and scabbling are carried out, and scabbling treatment is carried out on the position of an overlapped wall column; s2, wall column reinforcing steel bars are bound, wherein the wall column reinforcing steel bars are bound at the positions subjected to chiseling treatment; s3, column side line elastic carving is conducted, specifically, column side line elastic carving is conducted on the datum plane according to the drawing; s4, a column formwork is installed; s5, template cleaning; s6, pouring is conducted; s7, maintenance is conducted; s8, removing the mold; according to the construction method, through the operations of positioning and paying off, chiseling, binding of wall column steel bars, elastic carving of column side lines, installation of column formworks, cleaning, pouring, maintenance, formwork removal and the like, the construction method of the coincident wall columns is further improved, and the phenomena of slab staggering and slurry leakage easily occurring in a conventional construction method of the coincident wall columns can be effectively avoided; and the quality of the overlapped wall column can be greatly improved, and the supporting strength is improved.
本发明涉及墙柱施工技术领域,提供了一种重合墙柱防错台漏浆施工方法,包括:S1:凿毛处理:首先进行定位放线及凿毛,在重合墙柱的位置上进行凿毛处理;S2:绑扎墙柱钢筋:在经过凿毛处理后的位置上进行绑扎墙柱钢筋;S3:柱边线弹刻:根据图纸在基准面上进行柱边线弹刻;S4:柱模板安装;S5:模板清理;S6:浇筑;S7:养护;S8:拆模;本发明通过定位放线、凿毛、绑扎墙柱钢筋、柱边线弹刻、安装柱模板、清理、浇筑、养护以及拆模等操作,不仅对重合墙柱的施工方法进行了进一步的改进,能够有效的避免常规的重合墙柱的施工方法中容易出现的错台漏浆的现象发生;而且能够大幅度的提高重合墙柱的质量,提高其支撑强度。
Staggered wall column slab staggering and slurry leakage prevention construction method
一种重合墙柱防错台漏浆施工方法
LIN YUSHAN (Autor:in) / LIN CHENGSHAN (Autor:in) / CHEN YUEHUI (Autor:in) / WANG DABO (Autor:in) / WANG MAOSONG (Autor:in)
23.02.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Building formwork slab-staggering-prevention abutted seam connection method
Europäisches Patentamt | 2021
|Prefabricated laminated slab slurry leakage prevention device and construction method thereof
Europäisches Patentamt | 2023
|Cement pavement slab staggering treatment structure and construction method
Europäisches Patentamt | 2021
|