Foundation pit dewatering construction method
The invention discloses a foundation pit dewatering construction method which comprises the steps of well point positioning, drilling and hole forming, well casing lowering, filling and well washing, equipment installation and connection, dewatering drainage and well sealing treatment. And the water filtering well pipe is vertically put down above the well hole along the axis of the drill hole in a two-point limiting mode, so that the water filtering well pipe is centered in the well hole. During foundation pit dewatering construction, two-point limiting is carried out on the water filtering well pipe composed of multiple sections of steel pipes above the well hole, so that the water filtering well pipe is always kept in a centrally-perpendicular state to be lowered in the well hole, the water filtering well pipe does not make contact with the well wall, and the stability of the well wall is not affected; and the water filtering well pipe can be stably lowered to the well bottom and kept in a vertical centering state.
本发明公开了一种基坑降水施工方法,包括井点定位、钻进成孔、井管下放、填充洗井、设备装连、降水排水和封井处理,在井管下发时,制作由多节钢管拼装焊接组成的滤水井管,并将滤水井管沿钻孔轴线在井孔上方采用两点限位的方式垂直下放,使滤水井管居中置于井孔内。本发明在基坑降水施工时,通过在井孔上方对由多节钢管组成的滤水井管进行两点限位,使滤水井管始终保持居中垂直的状态在井孔内下放,并且滤水井管与井壁不接触,不影响井壁的稳定性,使滤水井管能够稳定下放至井底并保持垂直居中的状态。
Foundation pit dewatering construction method
The invention discloses a foundation pit dewatering construction method which comprises the steps of well point positioning, drilling and hole forming, well casing lowering, filling and well washing, equipment installation and connection, dewatering drainage and well sealing treatment. And the water filtering well pipe is vertically put down above the well hole along the axis of the drill hole in a two-point limiting mode, so that the water filtering well pipe is centered in the well hole. During foundation pit dewatering construction, two-point limiting is carried out on the water filtering well pipe composed of multiple sections of steel pipes above the well hole, so that the water filtering well pipe is always kept in a centrally-perpendicular state to be lowered in the well hole, the water filtering well pipe does not make contact with the well wall, and the stability of the well wall is not affected; and the water filtering well pipe can be stably lowered to the well bottom and kept in a vertical centering state.
本发明公开了一种基坑降水施工方法,包括井点定位、钻进成孔、井管下放、填充洗井、设备装连、降水排水和封井处理,在井管下发时,制作由多节钢管拼装焊接组成的滤水井管,并将滤水井管沿钻孔轴线在井孔上方采用两点限位的方式垂直下放,使滤水井管居中置于井孔内。本发明在基坑降水施工时,通过在井孔上方对由多节钢管组成的滤水井管进行两点限位,使滤水井管始终保持居中垂直的状态在井孔内下放,并且滤水井管与井壁不接触,不影响井壁的稳定性,使滤水井管能够稳定下放至井底并保持垂直居中的状态。
Foundation pit dewatering construction method
一种基坑降水施工方法
MA CHENG (Autor:in) / HUANG XINGWEI (Autor:in) / CHENG TAO (Autor:in) / ZHOU YUMING (Autor:in) / LI HONGXING (Autor:in) / ZHANG LITING (Autor:in)
27.02.2024
Patent
Elektronische Ressource
Chinesisch
Dewatering well-free dewatering construction method for deep foundation pit
Europäisches Patentamt | 2022
|Foundation pit dewatering and drainage construction method
Europäisches Patentamt | 2023
|