Foundation pit dewatering construction method
The invention relates to construction dewatering, in particular to a foundation pit dewatering construction method. Comprising the following steps: S1, constructing a collecting ditch at the bottom of a foundation trench; s2, a water collecting well pipe is installed, specifically, the well pipe is installed in the water collecting ditch, and the well pipe is installed to the designated depth; s3, backfilling the collecting gutter, namely backfilling the collecting gutter by adopting sand and gravel materials; s4, concrete is poured, specifically, concrete is poured on the tops of the collecting gutters; and S5, a scaffold is erected on the concrete. The construction period is shortened, and the working procedure distribution problem of a construction site can be solved to a great extent; the structure is simple, and the foundation pit excavation width is reduced; construction is convenient, construction period cost is saved, and project benefits are improved; the problem that the construction period is affected due to the fact that a scaffold erecting working face is tense due to the site is effectively solved.
本发明涉及施工降水,特别是一种基坑降水施工方法。包括如下步骤:S1、基槽底部集水沟施工;S2、集水井井管安装,在集水沟内安装井管,井管安装到指定深度;S3、集水沟回填,采用砂砾料对集水沟回填;S4、浇筑混凝土,集水沟顶部浇筑混凝土;S5、在混凝土上搭设脚手架。本发明节省工期,能够极大程度解决施工场地的工序分布问题;构造简单,缩小基坑开挖宽度;施工方便,节省工期成本,从而提高项目效益;有效的解决由于场地原因造成的脚手架搭设工作面紧张的问题进而影响施工周期。
Foundation pit dewatering construction method
The invention relates to construction dewatering, in particular to a foundation pit dewatering construction method. Comprising the following steps: S1, constructing a collecting ditch at the bottom of a foundation trench; s2, a water collecting well pipe is installed, specifically, the well pipe is installed in the water collecting ditch, and the well pipe is installed to the designated depth; s3, backfilling the collecting gutter, namely backfilling the collecting gutter by adopting sand and gravel materials; s4, concrete is poured, specifically, concrete is poured on the tops of the collecting gutters; and S5, a scaffold is erected on the concrete. The construction period is shortened, and the working procedure distribution problem of a construction site can be solved to a great extent; the structure is simple, and the foundation pit excavation width is reduced; construction is convenient, construction period cost is saved, and project benefits are improved; the problem that the construction period is affected due to the fact that a scaffold erecting working face is tense due to the site is effectively solved.
本发明涉及施工降水,特别是一种基坑降水施工方法。包括如下步骤:S1、基槽底部集水沟施工;S2、集水井井管安装,在集水沟内安装井管,井管安装到指定深度;S3、集水沟回填,采用砂砾料对集水沟回填;S4、浇筑混凝土,集水沟顶部浇筑混凝土;S5、在混凝土上搭设脚手架。本发明节省工期,能够极大程度解决施工场地的工序分布问题;构造简单,缩小基坑开挖宽度;施工方便,节省工期成本,从而提高项目效益;有效的解决由于场地原因造成的脚手架搭设工作面紧张的问题进而影响施工周期。
Foundation pit dewatering construction method
基坑降水施工方法
YU HUI (Autor:in) / DU RUIGANG (Autor:in) / ZHANG RUI (Autor:in) / SANG ZHENLIN (Autor:in)
06.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Dewatering well-free dewatering construction method for deep foundation pit
Europäisches Patentamt | 2022
|Foundation pit dewatering and drainage construction method
Europäisches Patentamt | 2023
|