Mechanical connection reserved joint construction method
The invention discloses a mechanical connection reserved joint construction method which comprises the following construction steps: S1, reserved steel bar processing: processing a non-anchoring head of an embedded steel bar according to the position of a construction joint; s2, sleeve installation is conducted, specifically, one end of the sleeve is placed on one side of the construction joint and tightly attached to a beam side formwork or a construction joint plugging formwork, the interior of the sleeve is plugged through a plugging piece, and the sleeve is connected with the embedded steel bars; s3, pre-embedded steel bar binding: the pre-embedded steel bars are firmly bound with peripheral steel bars; s4, checking and accepting; and S5, formwork installation and reinforcement are conducted, specifically, fixing is conducted on the outer side of the sleeve from the outer side of the formwork through fixing pieces. The invention aims to enable the pressure equalizing ring to automatically advance and retreat in the construction process, so that the pressure equalizing ring has safety and is simple, convenient and quick to operate.
本发明公开了一种机械连接预留接头施工方法,包括以下施工步骤:S1:预留钢筋加工:根据施工缝位置,将预埋钢筋非锚固头进行加工;S2:套筒安装:套筒一端放置在施工缝一侧,并与梁侧模或施工缝封堵模板紧密贴合,并用封堵件封堵套筒的内部,套筒与预埋钢筋连接;S3:预埋钢筋绑扎:预埋钢筋与周边钢筋绑扎牢固;S4:验收;S5:模板安装加固:从模板外侧用固定件在套筒外侧进行固定。本发明旨在使均压坏在施工过程中可自动推进及后退使之有安全性且操作简便快捷。
Mechanical connection reserved joint construction method
The invention discloses a mechanical connection reserved joint construction method which comprises the following construction steps: S1, reserved steel bar processing: processing a non-anchoring head of an embedded steel bar according to the position of a construction joint; s2, sleeve installation is conducted, specifically, one end of the sleeve is placed on one side of the construction joint and tightly attached to a beam side formwork or a construction joint plugging formwork, the interior of the sleeve is plugged through a plugging piece, and the sleeve is connected with the embedded steel bars; s3, pre-embedded steel bar binding: the pre-embedded steel bars are firmly bound with peripheral steel bars; s4, checking and accepting; and S5, formwork installation and reinforcement are conducted, specifically, fixing is conducted on the outer side of the sleeve from the outer side of the formwork through fixing pieces. The invention aims to enable the pressure equalizing ring to automatically advance and retreat in the construction process, so that the pressure equalizing ring has safety and is simple, convenient and quick to operate.
本发明公开了一种机械连接预留接头施工方法,包括以下施工步骤:S1:预留钢筋加工:根据施工缝位置,将预埋钢筋非锚固头进行加工;S2:套筒安装:套筒一端放置在施工缝一侧,并与梁侧模或施工缝封堵模板紧密贴合,并用封堵件封堵套筒的内部,套筒与预埋钢筋连接;S3:预埋钢筋绑扎:预埋钢筋与周边钢筋绑扎牢固;S4:验收;S5:模板安装加固:从模板外侧用固定件在套筒外侧进行固定。本发明旨在使均压坏在施工过程中可自动推进及后退使之有安全性且操作简便快捷。
Mechanical connection reserved joint construction method
机械连接预留接头施工方法
QI XINGRONG (Autor:in) / CAO BIN (Autor:in) / WANG LINGTAO (Autor:in) / TIE YULIN (Autor:in)
27.02.2024
Patent
Elektronische Ressource
Chinesisch
Steel beam and reserved plate connection reinforcing structure and construction method
Europäisches Patentamt | 2024
|Subway upper cover reserved joint bar positioning device and construction method
Europäisches Patentamt | 2023
|Single-side reserved deformation joint protection structure and construction method thereof