Dike breach unblocking method based on rapid throwing pipeline
The invention discloses an embankment breach unblocking method based on a rapid throwing pipeline, and the method comprises the following steps: S1, finding a breach, and carrying out the monitoring and pre-judgment of the breach; s2, an emergency team, plugging equipment and materials are prepared; s3, anchoring, throwing pipelines, gabions and soil engineering bags are cooperatively adopted for plugging operation; and S4, reinforcing operation is conducted after plugging is completed. According to the method, the advantages of various existing plugging modes are fully combined, plugging of the large breach of the river is achieved by adopting the mode that anchoring, pipeline throwing, gabion throwing and soil engineering bag synergistically embody blocking and blockage removing synergic integrated operation, and the method has the advantages of being scientific in principle, high in emergency rescue construction speed, high in safety, high in one-time success rate, firm, reliable and the like.
本发明公开了一种基于快速抛投管道的堤防溃口抢堵方法,包括以下步骤:S1、发现溃口,对溃口进行监测和预判;S2、准备抢险队伍、堵口设备和物资;S3、采用锚固、抛投管道、石笼、土工包协同进行堵口作业;S4、堵口完毕后进行加固作业。本发明将现有各种堵口方式中的优点充分组合,采用锚固、抛投管道、石笼、土工包协同体现阻拦排堵协同一体化作业的方式实现对河流较大溃口的堵口,具有原理科学、抢险施工速度快、安全性强、一次性成功率高、坚实可靠等特点。
Dike breach unblocking method based on rapid throwing pipeline
The invention discloses an embankment breach unblocking method based on a rapid throwing pipeline, and the method comprises the following steps: S1, finding a breach, and carrying out the monitoring and pre-judgment of the breach; s2, an emergency team, plugging equipment and materials are prepared; s3, anchoring, throwing pipelines, gabions and soil engineering bags are cooperatively adopted for plugging operation; and S4, reinforcing operation is conducted after plugging is completed. According to the method, the advantages of various existing plugging modes are fully combined, plugging of the large breach of the river is achieved by adopting the mode that anchoring, pipeline throwing, gabion throwing and soil engineering bag synergistically embody blocking and blockage removing synergic integrated operation, and the method has the advantages of being scientific in principle, high in emergency rescue construction speed, high in safety, high in one-time success rate, firm, reliable and the like.
本发明公开了一种基于快速抛投管道的堤防溃口抢堵方法,包括以下步骤:S1、发现溃口,对溃口进行监测和预判;S2、准备抢险队伍、堵口设备和物资;S3、采用锚固、抛投管道、石笼、土工包协同进行堵口作业;S4、堵口完毕后进行加固作业。本发明将现有各种堵口方式中的优点充分组合,采用锚固、抛投管道、石笼、土工包协同体现阻拦排堵协同一体化作业的方式实现对河流较大溃口的堵口,具有原理科学、抢险施工速度快、安全性强、一次性成功率高、坚实可靠等特点。
Dike breach unblocking method based on rapid throwing pipeline
一种基于快速抛投管道的堤防溃口抢堵方法
ZHANG BAOSEN (Autor:in) / SU MAOLIN (Autor:in) / WANG ZILI (Autor:in) / YUE YUSU (Autor:in) / DENG YU (Autor:in) / LI MINGYANG (Autor:in) / ZHAO HEJING (Autor:in) / GAO YUXIANG (Autor:in) / ZHAO YUHONG (Autor:in) / MENG XIANGXU (Autor:in)
08.03.2024
Patent
Elektronische Ressource
Chinesisch
Dike breach rapid occupation method based on blocking cooperation
Europäisches Patentamt | 2024
|