Rapid leaking stoppage method for dike breach
The invention provides a rapid leaking stoppage method for a dike breach, and relates to the technical field of hydraulic engineering, and the rapid leaking stoppage method comprises the following steps: S1, breach fixing: fixing two ends of the breach by using steel sheet piles and steel pipe columns capable of bearing corresponding water pressure at stable positions of edges of two ends of the breach; s2, pipe bodies are laid, specifically, a plurality of pipe bodies are laid from the two ends of the dike breach in the direction perpendicular to the dike; s3, piling is conducted on the side, away from the river channel, of the pipe body along the edge of a pipe opening of the laid pipe body; s4, the pipe body is blocked, and a corresponding blocking material is selected to block a pipe opening of the pipe body; s5, a rockfill dam is built, and after sundries and soft soil on the outer side of the crevasse are cleaned, the rockfill dam is laid on the outer side of the pipe body in the crevasse; through rapid throwing and stacking of the steel sheet piles, the steel pipe piles and the pipe bodies, the crevasse with the large water level difference can be preliminarily blocked within a short time, and the crevasse is adjusted and reinforced through subsequent reinforcing measures.
本发明提供的一种堤坝决口快速堵漏方法,涉及水利工程技术领域,包括以下步骤:S1:决口固定,在决口两端边缘稳固的位置处,使用能够承受住对应水压的钢板桩与钢管柱对决口两端进行固定;S2:铺设管体,使用若干管体从堤坝决口两端,按照垂直于堤坝方向进行铺设;S3:打桩,在所述管体远离河道一侧,沿着铺放的所述管体管口边缘;S4:封堵管体,选择对应的封堵材料对所述管体管口进行封堵;S5:建造石坝,清理决口外侧杂物和松软泥土后,沿铺放至决口内管体外侧;本发明通过钢板桩、钢管桩和管体的快速投放和堆积,能够在短时间内对水位差较大的决口进行初步封堵,并通过后续的加固措施,对决口进行调整和加固。
Rapid leaking stoppage method for dike breach
The invention provides a rapid leaking stoppage method for a dike breach, and relates to the technical field of hydraulic engineering, and the rapid leaking stoppage method comprises the following steps: S1, breach fixing: fixing two ends of the breach by using steel sheet piles and steel pipe columns capable of bearing corresponding water pressure at stable positions of edges of two ends of the breach; s2, pipe bodies are laid, specifically, a plurality of pipe bodies are laid from the two ends of the dike breach in the direction perpendicular to the dike; s3, piling is conducted on the side, away from the river channel, of the pipe body along the edge of a pipe opening of the laid pipe body; s4, the pipe body is blocked, and a corresponding blocking material is selected to block a pipe opening of the pipe body; s5, a rockfill dam is built, and after sundries and soft soil on the outer side of the crevasse are cleaned, the rockfill dam is laid on the outer side of the pipe body in the crevasse; through rapid throwing and stacking of the steel sheet piles, the steel pipe piles and the pipe bodies, the crevasse with the large water level difference can be preliminarily blocked within a short time, and the crevasse is adjusted and reinforced through subsequent reinforcing measures.
本发明提供的一种堤坝决口快速堵漏方法,涉及水利工程技术领域,包括以下步骤:S1:决口固定,在决口两端边缘稳固的位置处,使用能够承受住对应水压的钢板桩与钢管柱对决口两端进行固定;S2:铺设管体,使用若干管体从堤坝决口两端,按照垂直于堤坝方向进行铺设;S3:打桩,在所述管体远离河道一侧,沿着铺放的所述管体管口边缘;S4:封堵管体,选择对应的封堵材料对所述管体管口进行封堵;S5:建造石坝,清理决口外侧杂物和松软泥土后,沿铺放至决口内管体外侧;本发明通过钢板桩、钢管桩和管体的快速投放和堆积,能够在短时间内对水位差较大的决口进行初步封堵,并通过后续的加固措施,对决口进行调整和加固。
Rapid leaking stoppage method for dike breach
一种堤坝决口快速堵漏方法
XIA CHUANWEN (Autor:in) / XIA JINGRU (Autor:in) / FANG XUE (Autor:in) / DONG LIANGFEI (Autor:in) / WU HONGJIAN (Autor:in) / YU ZELIN (Autor:in)
17.12.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Foundation pit leaking stoppage construction method and leaking stoppage material
Europäisches Patentamt | 2021
|Grouting leaking stoppage equipment with heating function and leaking stoppage method
Europäisches Patentamt | 2023
|