Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel structure construction platform
The invention discloses a steel structure construction platform, which belongs to the technical field of construction platforms, and is technically characterized by comprising a conveying unit which is connected to the construction platform in a sliding manner and is connected with a first operation table; one end of the dislocation unit is connected with the conveying unit, and the other end of the dislocation unit is connected with the second operation table. During construction, a constructor can stand on the first operation table and place materials or tools on the second operation table. When a constructor needs to move the construction position, the conveying unit is pulled, and the conveying unit can drive the first operation table to slide. The conveying unit can drive the second operation table to slide in a staggered mode through the staggered unit when sliding, so that the position of the first operation table and the position of the second operation table can be exchanged, a constructor can conduct construction at different positions conveniently, materials and tools can synchronously move along with movement of the position of the constructor, and more convenience is achieved.
本发明公开了一种钢结构施工平台,属于施工平台技术领域,其技术要点是:包括输送单元,滑动连接在施工平台上,和第一操作台连接;错位单元,安装在施工平台上,一端和输送单元连接,另一端和第二操作台连接。在进行施工时,施工者可以站在第一操作台上,并且将用料或工具放置在第二操作台上。当施工者需要对施工的位置进行移动时,拉动输送单元,输送单元可以带动第一操作台进行滑动。输送单元在进行滑动时可以通过错位单元带动第二操作台进行错位滑动,使得第一操作台和第二操作台的位置可以互换,便于施工者对不同的位置进行施工,且用料和工具也可以随着施工者位置的移动而发生同步的移动,更加的方便。
Steel structure construction platform
The invention discloses a steel structure construction platform, which belongs to the technical field of construction platforms, and is technically characterized by comprising a conveying unit which is connected to the construction platform in a sliding manner and is connected with a first operation table; one end of the dislocation unit is connected with the conveying unit, and the other end of the dislocation unit is connected with the second operation table. During construction, a constructor can stand on the first operation table and place materials or tools on the second operation table. When a constructor needs to move the construction position, the conveying unit is pulled, and the conveying unit can drive the first operation table to slide. The conveying unit can drive the second operation table to slide in a staggered mode through the staggered unit when sliding, so that the position of the first operation table and the position of the second operation table can be exchanged, a constructor can conduct construction at different positions conveniently, materials and tools can synchronously move along with movement of the position of the constructor, and more convenience is achieved.
本发明公开了一种钢结构施工平台,属于施工平台技术领域,其技术要点是:包括输送单元,滑动连接在施工平台上,和第一操作台连接;错位单元,安装在施工平台上,一端和输送单元连接,另一端和第二操作台连接。在进行施工时,施工者可以站在第一操作台上,并且将用料或工具放置在第二操作台上。当施工者需要对施工的位置进行移动时,拉动输送单元,输送单元可以带动第一操作台进行滑动。输送单元在进行滑动时可以通过错位单元带动第二操作台进行错位滑动,使得第一操作台和第二操作台的位置可以互换,便于施工者对不同的位置进行施工,且用料和工具也可以随着施工者位置的移动而发生同步的移动,更加的方便。
Steel structure construction platform
一种钢结构施工平台
HAN ZHAOXIAN (Autor:in) / LIU WEIJUN (Autor:in) / ZHU DONGYANG (Autor:in) / GUO ZHIMIN (Autor:in) / LIU YAOHUI (Autor:in) / FAN FENGCHANG (Autor:in)
08.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Multifunctional steel structure construction platform
Europäisches Patentamt | 2023
|Steel structure construction platform for building construction
Europäisches Patentamt | 2024
|