Metal formwork horizontal circulation construction method
The invention relates to a metal formwork horizontal circulation construction method which comprises the steps that a whole floor structure is propelled in the horizontal direction, and the floor structure is moved to an adjacent building after construction of the floor is completed; the tower cranes are arranged in the middle of the two buildings in the same construction area (if one tower crane cannot meet the working capacity, the tower cranes are arranged at the two ends respectively), the construction progress of the two buildings is synchronous, and needed materials are the same in variety and specification, so that double parts can be synchronously processed during material proportioning, and batch production in a processing field is facilitated. When the materials are hoisted, the same rooms are arranged in the horizontal direction, so that the materials are configured according to a discharging table and are hoisted in sequence.
本发明涉及一种金属模板水平流转施工方法,楼层结构整体为水平方向推进,本层施工完后移至相邻楼栋;将塔吊设置在同一施工区域的两栋建筑中部(如当一台塔吊作业能力不能满足时,则在两端分别设置塔吊),两栋建筑施工进度同步,所需材料品种规格相同,因此物资配料时同步加工双份即可,方便加工场批量生产。在物资材料吊运时,由于水平方向上均为相同房间,在物资配置方面只要按照下料表配置、按次序吊运即可。
Metal formwork horizontal circulation construction method
The invention relates to a metal formwork horizontal circulation construction method which comprises the steps that a whole floor structure is propelled in the horizontal direction, and the floor structure is moved to an adjacent building after construction of the floor is completed; the tower cranes are arranged in the middle of the two buildings in the same construction area (if one tower crane cannot meet the working capacity, the tower cranes are arranged at the two ends respectively), the construction progress of the two buildings is synchronous, and needed materials are the same in variety and specification, so that double parts can be synchronously processed during material proportioning, and batch production in a processing field is facilitated. When the materials are hoisted, the same rooms are arranged in the horizontal direction, so that the materials are configured according to a discharging table and are hoisted in sequence.
本发明涉及一种金属模板水平流转施工方法,楼层结构整体为水平方向推进,本层施工完后移至相邻楼栋;将塔吊设置在同一施工区域的两栋建筑中部(如当一台塔吊作业能力不能满足时,则在两端分别设置塔吊),两栋建筑施工进度同步,所需材料品种规格相同,因此物资配料时同步加工双份即可,方便加工场批量生产。在物资材料吊运时,由于水平方向上均为相同房间,在物资配置方面只要按照下料表配置、按次序吊运即可。
Metal formwork horizontal circulation construction method
一种金属模板水平流转施工方法
SHI QUNKAI (Autor:in) / DUAN YANHUI (Autor:in) / XIAO FAN (Autor:in) / FENG LINBO (Autor:in) / WU YUNPENG (Autor:in) / XU CHENHAO (Autor:in)
15.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Horizontal construction intelligent formwork device and construction method
Europäisches Patentamt | 2022
|Horizontal structure formwork system and construction method