Construction method for controlling concrete elevation and reinforcing steel bar protective layer thickness
The invention relates to building construction, in particular to a construction method for controlling the elevation of concrete and the thickness of a steel bar protective layer. Comprising the following steps that S1, a rectangular concrete cushion block is prefabricated, a mounting hole is formed in one end of the rectangular concrete cushion block, and an arc-shaped groove is formed in the other end of the rectangular concrete cushion block; s2, manufacturing an elevation monitoring rod, and smearing a mark on the top of the elevation monitoring rod; s3, the lower end of the elevation monitoring rod is inserted into the mounting hole; s4, the grooves of the rectangular concrete blocks are placed at the bottoms of the bound steel bars; s5, concrete is poured, and the mark of the elevation monitoring rod is observed in the pouring process; and S6, the step S5 is repeated, so that the height of the poured concrete is parallel to the red coatings at the top ends of the elevation monitoring rods on all the rectangular concrete blocks. The component is simple in structure and convenient to manufacture, the problems that the thickness of a steel bar protection layer is insufficient and the concrete pouring thickness is uneven are effectively solved, the construction quality is improved, and the construction efficiency is improved.
本发明涉及建筑施工,特别是一种控制混凝土标高和钢筋保护层厚度的施工方法。包括如下步骤:S1、预制矩形混凝土垫块,在矩形混凝土垫块的一端开设安装孔,在矩形混凝土垫块的另一端开设弧形的凹槽;S2、制作标高监测杆,在标高监测杆的顶部涂抹标识;S3、将标高监测杆的下端插装在安装孔内;S4、将矩形混凝土块的凹槽放置在绑扎好的钢筋底部;S5、浇筑混凝土,浇筑过程中观察标高监测杆的标识;S6、重复步骤S5,使浇筑的混凝土高度与所有矩形混凝土块上的标高监测杆顶端红色涂料平行。本发明构件结构简单、制作方便,有效解决了钢筋保护层厚度不足与混凝土浇筑厚度不均匀的问题,提高施工质量,提高施工效率。
Construction method for controlling concrete elevation and reinforcing steel bar protective layer thickness
The invention relates to building construction, in particular to a construction method for controlling the elevation of concrete and the thickness of a steel bar protective layer. Comprising the following steps that S1, a rectangular concrete cushion block is prefabricated, a mounting hole is formed in one end of the rectangular concrete cushion block, and an arc-shaped groove is formed in the other end of the rectangular concrete cushion block; s2, manufacturing an elevation monitoring rod, and smearing a mark on the top of the elevation monitoring rod; s3, the lower end of the elevation monitoring rod is inserted into the mounting hole; s4, the grooves of the rectangular concrete blocks are placed at the bottoms of the bound steel bars; s5, concrete is poured, and the mark of the elevation monitoring rod is observed in the pouring process; and S6, the step S5 is repeated, so that the height of the poured concrete is parallel to the red coatings at the top ends of the elevation monitoring rods on all the rectangular concrete blocks. The component is simple in structure and convenient to manufacture, the problems that the thickness of a steel bar protection layer is insufficient and the concrete pouring thickness is uneven are effectively solved, the construction quality is improved, and the construction efficiency is improved.
本发明涉及建筑施工,特别是一种控制混凝土标高和钢筋保护层厚度的施工方法。包括如下步骤:S1、预制矩形混凝土垫块,在矩形混凝土垫块的一端开设安装孔,在矩形混凝土垫块的另一端开设弧形的凹槽;S2、制作标高监测杆,在标高监测杆的顶部涂抹标识;S3、将标高监测杆的下端插装在安装孔内;S4、将矩形混凝土块的凹槽放置在绑扎好的钢筋底部;S5、浇筑混凝土,浇筑过程中观察标高监测杆的标识;S6、重复步骤S5,使浇筑的混凝土高度与所有矩形混凝土块上的标高监测杆顶端红色涂料平行。本发明构件结构简单、制作方便,有效解决了钢筋保护层厚度不足与混凝土浇筑厚度不均匀的问题,提高施工质量,提高施工效率。
Construction method for controlling concrete elevation and reinforcing steel bar protective layer thickness
控制混凝土标高和钢筋保护层厚度的施工方法
LI YUCHEN (Autor:in) / ZHANG KUNLIANG (Autor:in) / LI DONGCHEN (Autor:in) / ZHANG DONGFENG (Autor:in) / DOU BIN (Autor:in) / ZHANG TIEZHU (Autor:in) / GUO DONG (Autor:in) / ZHANG FUXIANG (Autor:in) / YANG YUPENG (Autor:in) / BAI JIEYING (Autor:in)
19.03.2024
Patent
Elektronische Ressource
Chinesisch
Reinforcing steel bar protective layer thickness control device and construction process
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|Reinforcing steel bar protective layer and plate surface thickness control mechanism
Europäisches Patentamt | 2024
|